This document is part of Standard Specifications -- English Units.

The Table of Contents for this section is available.

SECTION 622

NON-STRIP ADDITIVE FOR PLANT MIX

622-1 DESCRIPTION.

The work covered by this section consists of the furnishing of non-strip additive at an asphalt plant and incorporating the non-strip additive into the asphalt plant mix.

622-2 MATERIALS.

All materials shall meet the requirements of Division 10 shown below:

Non-strip additive Article 1020-9 (See Standard Special Provisions)

622-3 GENERAL REQUIREMENTS.

The Contractor shall furnish the name of the supplier, shipping point, and grade of the non-strip additive.

The non-strip additive shall be introduced and mixed into the asphalt cement at either the supplier's terminal or at the asphalt plant site. In-line blending equipment shall be used at either location. When added at the asphalt plant, the equipment shall meet the requirements of Article 610­5(B)1. When added at the supplier's terminal, the rate, brand and grade shall be noted on the asphalt cement delivery ticket.

The non-strip additive and asphalt cement shall be thoroughly mixed before being incorporated into the asphalt plant mix.

622-4 METHOD OF MEASUREMENT.

The quantity of non-strip additive to be paid for will be the theoretical number of pounds of non-strip additive to be added to the theoretical number of tons of new asphalt cement required by the job mix formula based on the actual number of tons of plant mix completed and accepted on the job.

622-5 BASIS OF PAYMENT.

The quantity of non-strip additive, measured as provided in Article 622­4, will be paid for at the contract unit price per pound for "Non-Strip Additive".

Payment will be made under:

Non-Strip Additive Pound