This document is part of Standard Specifications -- English Units.

The Table of Contents for this section is available.

SECTION 326

BITUMINOUS COATED CORRUGATED

STEEL PIPE ARCH CULVERTS

326-1 DESCRIPTION.

The work covered by this section consists of furnishing and installing bituminous coated corrugated steel culvert pipe arch of the size, type, and thickness called for on the plans at locations indicated on the plans or designated by the Engineer and to the lines and grades established by the Engineer. The work shall also include the construction of such joints and connections to other pipes, endwalls, and other drainage structures as may be necessary to complete the work shown on the plans.

326-2 MATERIALS.

All materials shall meet the requirements of Division 10 shown below:

Bituminous coated corrugated steel culvert pipe arch Subarticle 1032­4(A)

Metal pipe culverts, fittings, and all other accessories covered by this section shall be furnished by a supplier who has met the requirements of the Departments Brand Certification program for metal culvert pipes, and is listed on the Departments pre-approved list for suppliers of metal culvert pipe.

326-3 PIPE INSTALLATION.

Pipe installation shall be in accordance with Section 300.

326-4 METHOD OF MEASUREMENT.

The quantity of pipe arch to be paid for will be the actual number of linear feet of pipe arch which has been incorporated into the completed and accepted work. Measurement will be made by counting the number of joints used and multiplying by the length of the joint. Where partial joints are used, measurement will be made along the longest length of the partial joint to the nearest 0.1 of a foot.

326-5 BASIS OF PAYMENT.

The quantities of pipe arch, measured as provided in Article 326­4, will be paid for at the contract unit prices per linear foot for the various sizes and types of bituminous coated corrugated steel pipe arch culverts shown below.

Payment for foundation conditioning will be made as provided in Subarticle 300­9(A).

Payment for providing select material will be made as provided in Subarticle 300­9(B).

Payment for providing the bedding material will be made as provided in Subarticle 300­9(C).

The above prices and payments will be full compensation for all work covered by this section, including but not limited to furnishing, hauling, and placing all pipe arch and other materials; making all joint connections; all excavation, bedding, and backfill; and cleaning out installed pipe.

Payment will be made under:

______Inch x ________Inch Bituminous Coated C.S.

Pipe Arch Culverts, Type ________,________ Inch Thick Linear Foot