SECTION 1265

MINI-DRUM DELINEATORS

1265-1 DESCRIPTION.

The work covered by this section consists of furnishing and installing mini-drum delineators in accordance with the plans and specifications.

265-2 MATERIALS.

All materials shall meet the requirements of Division 10 shown below:

mini-drum delineators Article 1088-6

1265-3 CONSTRUCTION METHODS.

The provisions of Article 1105­3 will be applicable to the work covered by this section.

Yellow delineators shall be used on barriers on the left side of divided highways, one-way ramps, loops, or other one-way facilities; crystal delineators shall be used on barriers on the right side of divided highways, ramps, loops, and all other one-way or tow-way facilities.

Mini-drum delineators shall be securely mounted perpendicular to the top of the barrier.

1265-4 MAINTENANCE.

The provisions of Article 1105­4 will be applicable to the work covered by this section.

1265-5 METHOD OF MEASUREMENT.

The quantity of mini-drum delineators to be paid for will be the actual number of mini-drum delineators which have been satisfactorily installed and accepted by the Engineer.

1265-6 BASIS OF PAYMENT.

The quantity of mini-drum delineators, measured as provided in Article 1265­5, will be paid for at the contract unit price each for "Mini-Drum Delineators, (Permanent/Temporary, Color)".

Such price and payment will be full compensation for all work covered by this section.

Payment will be made under:

Mini-Drum Delineators, (Permanent, Color) Each

Mini-Drum Delineators, (Temporary, Color) Each