DIVISION 15

UTILITIES

This is the Table of Contents for a Microsoft Word document which can be viewed by clicking here: div15e.doc. Click on the section number to see a preview in HTML format. The home page for this document is found here.

SECTION 1500 -- GENERAL UTILITY REQUIREMENTS
1500-1.....DESCRIPTION.
1500-2.....COOPERATION WITH THE UTILITY OWNER.
1500-3.....UTILITY LOCATIONS AND CONTRACTORS RESPONSIBILITY.
1500-4.....WEEKEND, NIGHT AND HOLIDAY WORK.
1500-5.....RELATION OF WATER MAINS TO SANITARY SEWERS.
1500-6.....PROTECTION OF PEDESTRIAN AND VEHICULAR TRAFFIC.
1500-7.....COMPENSATION.
SECTION 1505 -- EXCAVATION, TRENCHING & BACKFILLING FOR UTILITIES
1505-1.....DESCRIPTION.
1505-2.....MATERIALS.
1505-3.....CONSTRUCTION REQUIREMENTS.
1505-4.....REPAIR OF PAVEMENTS, SIDEWALKS AND DRIVEWAYS.
1505-5.....CONCRETE ENCASEMENT OF UTILITY LINES.
1505-6.....METHOD OF MEASUREMENT.
(A).....General:
(B).....Foundation Conditioning:
(C).....Select Material for Backfill:
(D).....Bedding Material:
(E).....Asphalt Plant Mix:
(F).....Concrete for Encasing Utility Lines:
1505-7.....BASIS OF PAYMENT.
(A).....General:
(B).....Foundation Conditioning:
(C).....Select Backfill Material:
(D).....Bedding Material:
.....(1).....Using Local Material:
.....(2).....Using Other Than Local Material:
(E).....Asphalt Plant Mix, Pavement Repair:
(F).....Concrete for Encasing Utility Lines:
(G).....Compensation:
(H).....Pay Items:
SECTION 1510 -- WATERLINE INSTALLATION
1510-1.....DESCRIPTION.
1510-2.....MATERIALS.
1510-3.....CONSTRUCTION REQUIREMENTS.
1510-4.....WATER SYSTEM INSTALLATION.
1510-5.....WATER SYSTEM - PRESSURE TEST, LEAKAGE TEST AND STERILIZATION:
1510-6.....METHOD OF MEASUREMENT.
1510-7.....BASIS OF PAYMENT.
SECTION 1520 -- SANITARY SEWER INSTALLATION
1520-1.....DESCRIPTION.
1520-2.....MATERIALS.
1520-3.....CONSTRUCTION REQUIREMENTS.
1520-4.....SEWER SYSTEM INSTALLATION.
(A).....Pipe Installation:
(B).....Sewer Line Testing:
.....(1).....General
.....(2).....Force Main Sewers
1520-5.....METHOD OF MEASUREMENT.
1520-7.....BASIS OF PAYMENT.
SECTION 1525 -- SANITARY SEWER MANHOLES
1525-1.....DESCRIPTION.
1525-2.....MATERIALS.
1525-3.....CONSTRUCTION REQUIREMENTS.
1525-4.....MANHOLE INSTALLATION.
(A).....Foundation:
(B).....Cast-In-Place Concrete, Brick, and Block Masonry:
(C).....Installation of Precast Units:
(D).....Fittings and Connections:
(E).....Backfill:
1525-5.....METHOD OF MEASUREMENT.
1525-6.....BASIS ON PAYMENT.
SECTION 1530 -- ADJUST, ABANDON OR REMOVE UTILITIES
1530-1.....DESCRIPTION.
1530-2.....MATERIALS.
1530-3.....CONSTRUCTION REQUIREMENTS.
(A).....Pipe:
(B).....Manholes:
1530-4.....Compensation:
1530-5.....BASIS OF PAYMENT.
(A).....Pipe:
(B).....Manholes: