| SECTION 1500 -- GENERAL UTILITY REQUIREMENTS | ||||
| 1500-1.....DESCRIPTION. | ||||
| 1500-2.....COOPERATION WITH THE UTILITY OWNER. | ||||
| 1500-3.....UTILITY LOCATIONS AND CONTRACTORS RESPONSIBILITY. | ||||
| 1500-4.....WEEKEND, NIGHT AND HOLIDAY WORK. | ||||
| 1500-5.....RELATION OF WATER MAINS TO SANITARY SEWERS. | ||||
| 1500-6.....PROTECTION OF PEDESTRIAN AND VEHICULAR TRAFFIC. | ||||
| 1500-7.....COMPENSATION. | ||||
| SECTION 1505 -- EXCAVATION, TRENCHING & BACKFILLING FOR UTILITIES | ||||
| 1505-1.....DESCRIPTION. | ||||
| 1505-2.....MATERIALS. | ||||
| 1505-3.....CONSTRUCTION REQUIREMENTS. | ||||
| 1505-4.....REPAIR OF PAVEMENTS, SIDEWALKS AND DRIVEWAYS. | ||||
| 1505-5.....CONCRETE ENCASEMENT OF UTILITY LINES. | ||||
| 1505-6.....METHOD OF MEASUREMENT. | ||||
| (A).....General: | ||||
| (B).....Foundation Conditioning: | ||||
| (C).....Select Material for Backfill: | ||||
| (D).....Bedding Material: | ||||
| (E).....Asphalt Plant Mix: | ||||
| (F).....Concrete for Encasing Utility Lines: | ||||
| 1505-7.....BASIS OF PAYMENT. | ||||
| (A).....General: | ||||
| (B).....Foundation Conditioning: | ||||
| (C).....Select Backfill Material: | ||||
| (D).....Bedding Material: | ||||
| .....(1).....Using Local Material: | ||||
| .....(2).....Using Other Than Local Material: | ||||
| (E).....Asphalt Plant Mix, Pavement Repair: | ||||
| (F).....Concrete for Encasing Utility Lines: | ||||
| (G).....Compensation: | ||||
| (H).....Pay Items: | ||||
| SECTION 1510 -- WATERLINE INSTALLATION | ||||
| 1510-1.....DESCRIPTION. | ||||
| 1510-2.....MATERIALS. | ||||
| 1510-3.....CONSTRUCTION REQUIREMENTS. | ||||
| 1510-4.....WATER SYSTEM INSTALLATION. | ||||
| 1510-5.....WATER SYSTEM - PRESSURE TEST, LEAKAGE TEST AND STERILIZATION: | ||||
| 1510-6.....METHOD OF MEASUREMENT. | ||||
| 1510-7.....BASIS OF PAYMENT. | ||||
| SECTION 1520 -- SANITARY SEWER INSTALLATION | ||||
| 1520-1.....DESCRIPTION. | ||||
| 1520-2.....MATERIALS. | ||||
| 1520-3.....CONSTRUCTION REQUIREMENTS. | ||||
| 1520-4.....SEWER SYSTEM INSTALLATION. | ||||
| (A).....Pipe Installation: | ||||
| (B).....Sewer Line Testing: | ||||
| .....(1).....General | ||||
| .....(2).....Force Main Sewers | ||||
| 1520-5.....METHOD OF MEASUREMENT. | ||||
| 1520-7.....BASIS OF PAYMENT. | ||||
| SECTION 1525 -- SANITARY SEWER MANHOLES | ||||
| 1525-1.....DESCRIPTION. | ||||
| 1525-2.....MATERIALS. | ||||
| 1525-3.....CONSTRUCTION REQUIREMENTS. | ||||
| 1525-4.....MANHOLE INSTALLATION. | ||||
| (A).....Foundation: | ||||
| (B).....Cast-In-Place Concrete, Brick, and Block Masonry: | ||||
| (C).....Installation of Precast Units: | ||||
| (D).....Fittings and Connections: | ||||
| (E).....Backfill: | ||||
| 1525-5.....METHOD OF MEASUREMENT. | ||||
| 1525-6.....BASIS ON PAYMENT. | ||||
| SECTION 1530 -- ADJUST, ABANDON OR REMOVE UTILITIES | ||||
| 1530-1.....DESCRIPTION. | ||||
| 1530-2.....MATERIALS. | ||||
| 1530-3.....CONSTRUCTION REQUIREMENTS. | ||||
| (A).....Pipe: | ||||
| (B).....Manholes: | ||||
| 1530-4.....Compensation: | ||||
| 1530-5.....BASIS OF PAYMENT. | ||||
| (A).....Pipe: | ||||
| (B).....Manholes: | ||||