DIVISION 9

SIGNING

This is the Table of Contents for a Microsoft Word document which can be viewed by clickinghere: div09e.doc. Click on the section number to see a preview in HTML format. The home page for this document is found here.

SECTION 900 -- GENERAL REQUIREMENTS FOR SIGNING
900-1.....DESCRIPTION.
900-2.....APPLICABLE SPECIFICATIONS, STANDARDS, AND PUBLICATIONS.
900-3.....DEPARTMENT FURNISHED SIGNS.
900-4.....DAMAGE TO FACILITIES.
900-5.....COMPENSATION.
SECTION 901 -- SIGN FABRICATION
901-1.....DESCRIPTION.
901-2.....MATERIALS.
901-3.....CONSTRUCTION METHODS.
(A).....Welding:
(B).....Signs:
.....(1).....Type A Signs:
.....(2).....Type B Signs:
.....(3).....Type D, E, and F Signs:
.....(4).....Types E and F Sign Assemblies:
.....(5).....Milemarkers:
.....(6).....Overlays for Existing Signs:
(C).....Preparation of Aluminum Sign Surfaces:
.....1......Cleaning and Etching:
.....2......Chromate Conversion Coating:
(D).....Retroreflective Sheeting:
(E).....Reflectorized Letters, Numerals, Symbols, Border and Shields:
.....(1).....General:
.....(2).....Direct Applied:
.....(3).....Demountable:
.....(a)..... Button-Type:
.....(b)..... Demountable Retroreflective Sheeting Type:
(F).....Silk Screening:
(G).....Supporting Frames:
(H).....Packaging and Shipping:
901-4.....ALTERNATE DESIGN.
901-5.....METHOD OF MEASUREMENT.
901-6.....BASIS OF PAYMENT.
SECTION 902 -- FOOTINGS FOR GROUND-MOUNTED SIGNS
902-1.....DESCRIPTION.
902-2.....MATERIALS.
902-3.....CONSTRUCTION METHODS.
902-4.....METHOD OF MEASUREMENT.
902-5.....BASIS OF PAYMENT.
SECTION 903 -- GROUND MOUNTED SIGN SUPPORTS
903-1.....DESCRIPTION.
903-2.....MATERIALS.
903-3.....CONSTRUCTION METHODS.
(A).....Breakaway or Simple Steel Beam Sign Supports:
.....(1).....Location:
.....(2).....Support Lengths:
.....(3).....Installation:
(B).....Steel U-Channel Posts:
.....(1).....Location:
.....(2).....Installation:
903-4.....METHOD OF MEASUREMENT.
(A).....Breakaway or Simple Steel Beam Sign Supports:
(B).....3-lb. Steel U-Channel Posts:
(C).....2-lb. Steel U-Channel Posts:
903-5.....BASIS OF PAYMENT.
(A).....Breakaway or Simple Steel Beam Sign Supports:
(B).....3-lb. Steel U-Channel Posts:
(C).....2-lb. Steel U-Channel Posts:
(D).....Pay Items:
SECTION 904 -- GROUND MOUNTED SIGNS, ERECTION
904-1.....DESCRIPTION.
904-2.....MATERIALS.
904-3.....CONSTRUCTION METHODS.
(A).....General:
(B).....Location:
(C).....Orientation of Signs:
(D).....Clearing for Sign Sight Distance:
(E).....Type A and B Signs, Erection:
(F).....Type D, E, and F Signs, Erection:
(G).....Milemarkers, Erection:
(H).....Care and Handling of Signs:
(I).....Final Cleaning Up:
(J).....Covering of Signs:
904-4.....METHOD OF MEASUREMENT.
904-5.....BASIS OF PAYMENT.
SECTION 905 -- OVERHEAD SIGN ASSEMBLIES
905-1.....DESCRIPTION.
905-2.....MATERIALS.
905-3.....CONSTRUCTION METHODS.
(A).....General:
(B).....Shop Drawing:
(C).....Design and Fabrication:
.....(1).....Overhead Sign Assemblies:
.....(2).....Maintenance Walkways:
.....(3).....Footings:
(D).....Location:
(E).....Footings for Overhead Sign Assemblies:
905-4.....COMPENSATION.
SECTION 906 -- LIGHTING SYSTEMS FOR OVERHEAD SIGN ASSEMBLIES
906-1.....DESCRIPTION.
906-2.....MATERIALS.
(A).....General:
(B).....Submittals:
906-3.....CONSTRUCTION METHODS.
(A).....Layout:
(B).....Conduit Installation:
(C).....Wiring Methods:
(D).....Grounding and Bonding:
(E).....Equipment Mounting:
(F).....Luminaires and Lamps:
(G).....Inspection:
(H).....Electrical Service:
(I).....Performance Tests:
906-4.....ALTERNATE LUMINAIRES.
906-5.....COMPENSATION.
SECTION 907 -- REMOVAL, STOCKPILING, AND DISPOSAL OF SIGNING COMPONENTS
907-1.....DESCRIPTION.
907-2.....CONSTRUCTION METHODS.
(A).....General:
(B).....Removal:
(C).....Stockpiling:
(D).....Disposal:
(E).....Removal and Disposal of Footings:
.....(1).....Ground Mounted Sign Footings:
.....(2).....Overhead Sign Assembly Footings:
.....(3).....Site Work:
(F).....Overhead Sign Assemblies:
907-3.....METHOD OF MEASUREMENT.
(A).....Remove and Stockpile:
(B).....Remove and Dispose of:
907-4.....BASIS OF PAYMENT.
(A).....Remove and Stockpile:
(B).....Remove and Dispose of:
(C).....Compensation:
(D).....Pay Items:
SECTION 908 -- MISCELLANEOUS SIGNING WORK
908-1.....DESCRIPTION.
908-2.....MATERIALS.
908-3.....CONSTRUCTION METHODS.
(A).....Attach Overlays to _________ Sign:
(B).....Erect Existing Sign on New Supports:
(C).....Erect Existing Sign on New U-Channel Posts:
(D).....Reposition Existing Sign on Overhead Sign Assembly:
(E).....Attach New Overhead Sign to Existing Overhead Sign Assembly:
(F).....Attach New Sign Above Existing Overhead Sign:
(G).....Attach Logo to Mainline Sign:
(H).....Attach Logo to Ramp Sign:
(I).....Erect Logo on U-Channel Post:
(J).....Barrier Sign Support Assembly:
(K).....Retaining Wall Sign Support and Anchorage:
908-4.....METHOD OF MEASUREMENT.
(A).....Attach Overlays to _____ Sign:
(B).....Erect Existing Sign on New Supports:
(C).....Erect Existing Sign on New U-Channel Posts:
(D).....Reposition Existing Sign on Overhead Sign Assembly:
(E).....Attach New Overhead Sign to Existing Overhead Sign Assembly:
(F).....Attach New Sign Above Existing Overhead Sign:
(G).....Attach Logo to Mainline Sign:
(H).....Attach Logo to Ramp Sign:
(I).....Erect Logo on U-Channel Post:
(J).....Barrier Sign Support Assembly:
(K).....Retaining Wall Sign Support and Anchorage:
908-5.....BASIS OF PAYMENT.
(A).....Attach Overlays to _____ Sign:
(B).....Erect Existing Sign on New Supports:
(C).....Erect Existing Sign on New U-Channel Posts:
(D).....Reposition Existing Sign on Overhead Sign Assembly:
(E).....Attach New Overhead Sign to Existing Overhead Sign Assembly:
(F).....Attach New Sign Above Existing Overhead Sign:
(G).....Attach Logo to Mainline Sign:
(H).....Attach Logo to Ramp Sign:
(I).....Erect Logo on U-Channel Post:
(J).....Barrier Sign Support Assembly:
(K).....Retaining Wall Sign Support and Anchorage:
(L).....Pay Items: