| SECTION 600 -- PRIME COAT | | |
|
600-1.....DESCRIPTION. | |
| 600-2.....MATERIALS. | |
| 600-3.....WEATHER LIMITATIONS. | |
| 600-4.....BASE PREPARATION. | |
| 600-5.....APPLICATION EQUIPMENT. | |
| 600-6.....APPLICATION RATES AND TEMPERATURES. | |
| 600-7.....APPLICATION OF PRIME COAT. | |
| 600-8.....MAINTENANCE AND PROTECTION. | |
| 600-9.....METHOD OF MEASUREMENT. | |
| 600-10.....BASIS OF PAYMENT. | |
| | |
| SECTION 605 -- ASPHALT TACK COAT | | |
| 605-1.....DESCRIPTION. | |
| 605-2.....MATERIALS. | |
| 605-3.....WEATHER LIMITATIONS. | |
| 605-4.....SURFACE PREPARATION. | |
| 605-5.....ACCEPTANCE OF ASPHALT MATERIALS. | |
| 605-6.....APPLICATION EQUIPMENT. | |
| 605-7.....APPLICATION RATES AND TEMPERATURES. | |
| 605-8.....APPLICATION OF TACK COAT. | | |
| 605-9.....PROTECTION OF TACK COAT. | |
| 605-10.....COMPENSATION. | |
| | |
| SECTION 609 -- QUALITY MANAGEMENT SYSTEM FOR ASPHALT PAVEMENTS | | |
| 609-1.....DESCRIPTION. | |
| 609-2.....DESCRIPTION OF RESPONSIBILITIES. | |
| | (A).....Quality Control: |
| | (B).....Quality Assurance: |
| 609-3.....MIX DESIGN/JOB MIX FORMULA REQUIREMENTS. | |
| 609-4.....FIELD VERIFICATION OF MIXTURE AND JOB MIX FORMULA ADJUSTMENTS. | |
| 609-5.....CONTRACTOR'S QUALITY CONTROL SYSTEM. | |
| | (A).....Personnel Requirements: |
| | (B).....Field Laboratory Requirements: |
| | (C).....Quality Control Plan: |
| | (D).....Required Sampling and Testing: |
| | (E).....Documentation (Records): |
| | (F).....Documentation (Control Charts): |
| | (G).....Control Limits: |
| | (H).....Warning Bands: |
| | (I).....Corrective Action: |
| 609-6.....QUALITY ASSURANCE. | |
| 609-7.....ACCEPTANCE. | |
| 609-8.....CONSTRUCTION REQUIREMENTS. | |
| | (A).....MATERIALS |
| | (B).....EQUIPMENT |
| 609-9 FIELD COMPACTION QUALITY MANAGEMENT. | |
| | (A).....Contractor Quality Control of Density |
| | (B).....Quality Assurance of Density |
| | (C).....Acceptance of Density |
| 609-10.....Method of Measurement. | |
| 609-11.....Basis of Payment | |
| | |
| SECTION 610 -- ASPHALT PLANT MIX PAVEMENTS - GENERAL | | |
| 610-1.....DESCRIPTION. | |
| 610-2.....MATERIALS. | |
| 610-3.....COMPOSITION OF MIXTURES (JOB MIX FORMULA). | |
| 610-4.....WEATHER AND TEMPERATURE LIMITATIONS FOR PRODUCING AND PLACING ASPHALT MIXTURES | |
| 610-5.....ASPHALT MIXTURE PRODUCTION. | |
| | (A).....General: |
| | (B).....Requirements For All Plants: |
| | .....(1).....Equipment for Preparation of Asphalt Cement: |
| | .....(2).....Cold Aggregate Feed Equipment: |
| | .....(3).....Dryer: |
| | .....(4).....Control Unit for Asphalt Cement: |
| | .....(5).....Thermometric Equipment: |
| | .....(a)..... Asphalt Cement Thermometric Equipment: |
| | .....(b)..... Dryer Thermometric Equipment: |
| | .....(6).....Pollution Control Equipment: |
| | .....(7).....Safety Requirements: |
| | .....(8).....Production Consistency: |
| | (C).....Requirements For Batch Mixing Plants: |
| | .....(1).....Plant Scales and/or Weighing Devices: |
| | .....(2).....Screens: |
| | .....(3).....Hot Bins: |
| | .....(4).....Weigh Box or Hopper: |
| | .....(5).....Asphalt Cement Control: |
| | .....(6).....Mixer: |
| | .....(7).....Control of Proportioning and Mixing: |
| | (D).....Requirements for Continuous Mixing Plants: |
| | .....(1).....General: |
| | .....(2).....Aggregate Proportioning: |
| | .....(3).....Screens: |
| | .....(4).....Hot Bins: |
| | .....(5).....Synchronization of Aggregate Feed and Asphalt Cement Feed: |
| | .....(6).....Mixer: |
| | (E).....Requirements for Drum Mix Plants: |
| | .....(1).....Aggregate Feed Equipment: |
| | .....(2).....Scalping Screen: |
| | .....(3).....Weight Measurement of Aggregate: |
| | .....(4).....Dryer-Drum Mixer Unit: |
| | .....(5).....Asphalt Cement Controls: |
| | .....(6).....Synchronization of Aggregate Feed and Asphalt Cement Feed: |
| | .....(7).....Asphalt Mixture Storage Facilities: |
| 610-6.....SURGE STORAGE BINS. | |
| 610-7.....HOT MIX SILO STORAGE BINS. | |
| 610-8.....TRANSPORTATION OF ASPHALT MIXTURE. | |
| 610-9.....SPREADING AND FINISHING. | |
| 610-10.....COMPACTION. | |
| 610-11.....DENSITY CONTROL AND DETERMINATION. | |
| | (A).....General: |
| | (B).....Pavement Samples (Cores): |
| | (C).....Density Determination by Nuclear Methods: |
| | .....(1).....General: |
| | .....(2).....Control Strip: |
| | .....(a)..... General: |
| | .....(b)..... Equipment: |
| | .....(c)..... Compaction: |
| | .....(d)..... Target Density: |
| | .....(3).....Test sections: |
| | .....(a)..... General: |
| | .....(b)..... Acceptance Requirements: |
| | (D).....Density Determination by Cored Sample Methods: |
| | .....(1).....General: |
| | .....(2).....Obtaining Samples: |
| | .....(3).....Procedures and Tests: |
| | .....(a)..... General: |
| | .....(b)..... Minor Production: |
| | .....(c)..... Normal Production: |
| 610-12.....JOINTS. | |
| | (A).....Transverse Joints: |
| | (B).....Longitudinal Joints: |
| 610-13.....SURFACE REQUIREMENTS. | |
| 610-14.....MAINTENANCE. | |
| 610-15.....COMPENSATION. | |
| | |
| SECTION 611 -- ASPHALT PLANT MIX PAVEMENTS -- RECYCLED | | |
| 611-1.....DESCRIPTION. | |
| 611-2.....MATERIALS. | |
| | (A).....Reclaimed Asphalt Materials: |
| | .....(1).....Classifications |
| | .....(a)..... Millings |
| | .....(b)..... Processed RAP |
| | .....(c)..... Unprocessed RAP |
| | .....(d)..... New Source RAP |
| | .....(2).....Sampling of Reclaimed Asphalt Pavement For Mix Design Purposes: |
| | (B).....New Aggregate: |
| | (C).....Asphalt Materials: |
| | (D).....Non-Strip Additive: |
| 611-3.....COMPOSITION OF RECYCLED MIXTURES (JOB MIX FORMULA). | |
| 611-4.....FIELD VERIFICATION OF NEW SOURCE RAP | |
| 611-5.....EQUIPMENT. | |
| 611-6.....CONSTRUCTION REQUIREMENTS. | |
| 611-7.....COMPENSATION. | |
| | |
| SECTION 612 -- MILLING ASPHALT PAVEMENT | | |
| 612-1.....DESCRIPTION. | |
| 612-2.....EQUIPMENT. | |
| 612-3.....CONSTRUCTION REQUIREMENTS. | |
| 612-4.....TOLERANCE. | |
| 612-5.....METHOD OF MEASUREMENT. | |
| | (A).....General: |
| | (B).....Milling Asphalt Pavement |
| | (C).....Incidental Milling: |
| 612-6.....BASIS OF PAYMENT. | |
| | |
| SECTION 615 -- FIELD LABORATORY FOR ASPHALT PLANT MIX | | |
| 615-1.....DESCRIPTION. | |
| 615-2.....GENERAL REQUIREMENTS. | |
| 615-3.....COMPENSATION. | |
| | |
| SECTION 620 -- ASPHALT CEMENT FOR PLANT MIX | | |
| 620-1.....DESCRIPTION. | |
| 620-2.....MATERIALS. | |
| 620-3.....GENERAL REQUIREMENTS. | |
| 620-4.....METHOD OF MEASUREMENT. | |
| 620-5.....BASIS OF PAYMENT. | |
| | |
| SECTION 622 -- NON-STRIP ADDITIVE FOR PLANT MIX | | |
| 620-1.....DESCRIPTION. | |
| 620-2.....MATERIALS. | |
| 620-3.....GENERAL REQUIREMENTS. | |
| 620-4.....METHOD OF MEASUREMENT. | |
| 620-5.....BASIS OF PAYMENT. | |
| | |
| SECTION 630 -- ASPHALT CONCRETE BASE COURSE, TYPE HB | | |
| 630-1.....DESCRIPTION. | |
| 630-2.....MATERIALS. | |
| 630-3.....COMPOSITION OF MIXTURE. | |
| | (A).....General Requirements: |
| | (B).....Job Mix Formula: |
| | (C).....Requirements for Completed Plant Mix: |
| 630-4.....CONSTRUCTION REQUIREMENTS | |
| 630-5.....METHOD OF MEASUREMENT. | |
| 630-6.....BASIS OF PAYMENT. | |
| | |
| SECTION 635 -- SAND ASPHALT BASE AND SURFACE COURSE, TYPE F-1 | | |
| 635-1.....DESCRIPTION. | |
| 635-2.....MATERIALS. | |
| 635-3.....COMPOSITION OF MIXTURE. | |
| | (A).....General Requirements: |
| | (B).....Job Mix Formula: |
| | (C).....Requirements for Completed Plant Mix: |
| 635-4.....CONSTRUCTION REQUIREMENTS. | |
| 635-5.....METHOD OF MEASUREMENT. | |
| 635-6.....BASIS OF PAYMENT. | |
| | |
| SECTION 640 -- ASPHALT CONCRETE BINDER COURSE, TYPES H AND HDB | | |
| 640-1.....DESCRIPTION. | |
| 640-2.....MATERIALS. | |
| 640-3.....COMPOSITION OF MIXTURE. | |
| | (A).....General Requirements: |
| | (B).....Job Mix Formula: |
| | (C).....Requirements for Completed Plant Mix: |
| 640-4.....CONSTRUCTION REQUIREMENTS. | |
| 640-5.....METHOD OF MEASUREMENT. | |
| 640-6.....BASIS OF PAYMENT. | |
| | |
| SECTION 645 -- ASPHALT CONCRETE SURFACE COURSE, TYPES I-1, I-2, AND HDS | | |
| 645-1.....DESCRIPTION. | |
| 645-2.....MATERIALS. | |
| 645-3.....COMPOSITION OF MIXTURE. | |
| | (A).....General Requirements: |
| | (B).....Job Mix Formula: |
| | (C).....Requirements for Completed Plant Mix: |
| 645-4.....CONSTRUCTION REQUIREMENTS. | |
| 645-5.....METHOD OF MEASUREMENT. | |
| 645-6.....BASIS OF PAYMENT. | |
| | OPEN-GRADED ASPHALT FRICTION |
| | |
| SECTION 650 -- COURSE, TYPE J-1 | | |
| 650-1.....DESCRIPTION. | |
| 650-2.....MATERIALS. | |
| 650-3.....COMPOSITION OF MIXTURE. | |
| 650-4.....CONSTRUCTION REQUIREMENTS. | |
| 650-5.....METHOD OF MEASUREMENT. | |
| 650-6.....BASIS OF PAYMENT. | |
| | |
| SECTION 652 -- PERMEABLE ASPHALT DRAINAGE COURSE TYPES P-78M AND P-57 | | |
| 652-1.....DESCRIPTION. | |
| 652-2.....MATERIALS. | |
| 652-3.....COMPOSITION OF MIXTURE. | |
| 652-4.....CONSTRUCTION REQUIREMENTS. | |
| 652-5.....METHOD OF MEASUREMENT. | |
| 652-6.....BASIS OF PAYMENT. | |
| | |
| SECTION 654 -- ASPHALT PLANT MIX, PAVEMENT REPAIR | | |
| 654-1.....DESCRIPTION. | |
| 654-2.....MATERIALS. | |
| 654-3.....CONSTRUCTION METHODS. | |
| | (A).....General: |
| | (B).....Pipe Removal or Installation: |
| 654-4.....METHOD OF MEASUREMENT. | |
| 654-5.....BASIS OF PAYMENT. | |
| | |
| SECTION 660 -- ASPHALT SURFACE TREATMENT | | |
| 660-1.....DESCRIPTION. | |
| 660-2.....MATERIALS. | |
| 660-3.....WEATHER AND SEASONAL LIMITATIONS. | |
| 660-4.....SURFACE PREPARATION. | |
| 660-5.....ACCEPTANCE OF ASPHALT MATERIALS. | |
| 660-6.....APPLICATION EQUIPMENT. | |
| 660-7.....APPLICATION OF ASPHALT MATERIALS. | |
| 660-8.....APPLICATION OF AGGREGATES. | |
| 660-9.....CONSTRUCTION METHODS. | |
| | (A).....Asphalt Mat Coat: |
| | (B).....Asphalt Seal Coat: |
| | .....1......Straight Seal: |
| | .....2......Drag Seal -- Type A: |
| | .....3......Drag Seal -- Type B: |
| | .....4......Split Seal: |
| | .....5......Triple Seal: |
| | .....6......Sand Seal: |
| | (C).....Asphalt Mat and Seal: |
| 660-11.....MAINTENANCE AND PROTECTION. | |
| 660-12.....METHOD OF MEASUREMENT. | |
| 660-13.....BASIS OF PAYMENT. | |