DIVISION 6

ASPHALT BASES AND PAVEMENTS

This is the Table of Contents for a Microsoft Word document which can be viewed by clickinghere: div06e.doc. Click on the section number to see a preview in HTML format. The home page for this document is found here.

SECTION 600 -- PRIME COAT
600-1.....DESCRIPTION.
600-2.....MATERIALS.
600-3.....WEATHER LIMITATIONS.
600-4.....BASE PREPARATION.
600-5.....APPLICATION EQUIPMENT.
600-6.....APPLICATION RATES AND TEMPERATURES.
600-7.....APPLICATION OF PRIME COAT.
600-8.....MAINTENANCE AND PROTECTION.
600-9.....METHOD OF MEASUREMENT.
600-10.....BASIS OF PAYMENT.
SECTION 605 -- ASPHALT TACK COAT
605-1.....DESCRIPTION.
605-2.....MATERIALS.
605-3.....WEATHER LIMITATIONS.
605-4.....SURFACE PREPARATION.
605-5.....ACCEPTANCE OF ASPHALT MATERIALS.
605-6.....APPLICATION EQUIPMENT.
605-7.....APPLICATION RATES AND TEMPERATURES.
605-8.....APPLICATION OF TACK COAT.
605-9.....PROTECTION OF TACK COAT.
605-10.....COMPENSATION.
SECTION 609 -- QUALITY MANAGEMENT SYSTEM FOR ASPHALT PAVEMENTS
609-1.....DESCRIPTION.
609-2.....DESCRIPTION OF RESPONSIBILITIES.
(A).....Quality Control:
(B).....Quality Assurance:
609-3.....MIX DESIGN/JOB MIX FORMULA REQUIREMENTS.
609-4.....FIELD VERIFICATION OF MIXTURE AND JOB MIX FORMULA ADJUSTMENTS.
609-5.....CONTRACTOR'S QUALITY CONTROL SYSTEM.
(A).....Personnel Requirements:
(B).....Field Laboratory Requirements:
(C).....Quality Control Plan:
(D).....Required Sampling and Testing:
(E).....Documentation (Records):
(F).....Documentation (Control Charts):
(G).....Control Limits:
(H).....Warning Bands:
(I).....Corrective Action:
609-6.....QUALITY ASSURANCE.
609-7.....ACCEPTANCE.
609-8.....CONSTRUCTION REQUIREMENTS.
(A).....MATERIALS
(B).....EQUIPMENT
609-9 FIELD COMPACTION QUALITY MANAGEMENT.
(A).....Contractor Quality Control of Density
(B).....Quality Assurance of Density
(C).....Acceptance of Density
609-10.....Method of Measurement.
609-11.....Basis of Payment
SECTION 610 -- ASPHALT PLANT MIX PAVEMENTS - GENERAL
610-1.....DESCRIPTION.
610-2.....MATERIALS.
610-3.....COMPOSITION OF MIXTURES (JOB MIX FORMULA).
610-4.....WEATHER AND TEMPERATURE LIMITATIONS FOR PRODUCING AND PLACING ASPHALT MIXTURES
610-5.....ASPHALT MIXTURE PRODUCTION.
(A).....General:
(B).....Requirements For All Plants:
.....(1).....Equipment for Preparation of Asphalt Cement:
.....(2).....Cold Aggregate Feed Equipment:
.....(3).....Dryer:
.....(4).....Control Unit for Asphalt Cement:
.....(5).....Thermometric Equipment:
.....(a)..... Asphalt Cement Thermometric Equipment:
.....(b)..... Dryer Thermometric Equipment:
.....(6).....Pollution Control Equipment:
.....(7).....Safety Requirements:
.....(8).....Production Consistency:
(C).....Requirements For Batch Mixing Plants:
.....(1).....Plant Scales and/or Weighing Devices:
.....(2).....Screens:
.....(3).....Hot Bins:
.....(4).....Weigh Box or Hopper:
.....(5).....Asphalt Cement Control:
.....(6).....Mixer:
.....(7).....Control of Proportioning and Mixing:
(D).....Requirements for Continuous Mixing Plants:
.....(1).....General:
.....(2).....Aggregate Proportioning:
.....(3).....Screens:
.....(4).....Hot Bins:
.....(5).....Synchronization of Aggregate Feed and Asphalt Cement Feed:
.....(6).....Mixer:
(E).....Requirements for Drum Mix Plants:
.....(1).....Aggregate Feed Equipment:
.....(2).....Scalping Screen:
.....(3).....Weight Measurement of Aggregate:
.....(4).....Dryer-Drum Mixer Unit:
.....(5).....Asphalt Cement Controls:
.....(6).....Synchronization of Aggregate Feed and Asphalt Cement Feed:
.....(7).....Asphalt Mixture Storage Facilities:
610-6.....SURGE STORAGE BINS.
610-7.....HOT MIX SILO STORAGE BINS.
610-8.....TRANSPORTATION OF ASPHALT MIXTURE.
610-9.....SPREADING AND FINISHING.
610-10.....COMPACTION.
610-11.....DENSITY CONTROL AND DETERMINATION.
(A).....General:
(B).....Pavement Samples (Cores):
(C).....Density Determination by Nuclear Methods:
.....(1).....General:
.....(2).....Control Strip:
.....(a)..... General:
.....(b)..... Equipment:
.....(c)..... Compaction:
.....(d)..... Target Density:
.....(3).....Test sections:
.....(a)..... General:
.....(b)..... Acceptance Requirements:
(D).....Density Determination by Cored Sample Methods:
.....(1).....General:
.....(2).....Obtaining Samples:
.....(3).....Procedures and Tests:
.....(a)..... General:
.....(b)..... Minor Production:
.....(c)..... Normal Production:
610-12.....JOINTS.
(A).....Transverse Joints:
(B).....Longitudinal Joints:
610-13.....SURFACE REQUIREMENTS.
610-14.....MAINTENANCE.
610-15.....COMPENSATION.
SECTION 611 -- ASPHALT PLANT MIX PAVEMENTS -- RECYCLED
611-1.....DESCRIPTION.
611-2.....MATERIALS.
(A).....Reclaimed Asphalt Materials:
.....(1).....Classifications
.....(a)..... Millings
.....(b)..... Processed RAP
.....(c)..... Unprocessed RAP
.....(d)..... New Source RAP
.....(2).....Sampling of Reclaimed Asphalt Pavement For Mix Design Purposes:
(B).....New Aggregate:
(C).....Asphalt Materials:
(D).....Non-Strip Additive:
611-3.....COMPOSITION OF RECYCLED MIXTURES (JOB MIX FORMULA).
611-4.....FIELD VERIFICATION OF NEW SOURCE RAP
611-5.....EQUIPMENT.
611-6.....CONSTRUCTION REQUIREMENTS.
611-7.....COMPENSATION.
SECTION 612 -- MILLING ASPHALT PAVEMENT
612-1.....DESCRIPTION.
612-2.....EQUIPMENT.
612-3.....CONSTRUCTION REQUIREMENTS.
612-4.....TOLERANCE.
612-5.....METHOD OF MEASUREMENT.
(A).....General:
(B).....Milling Asphalt Pavement
(C).....Incidental Milling:
612-6.....BASIS OF PAYMENT.
SECTION 615 -- FIELD LABORATORY FOR ASPHALT PLANT MIX
615-1.....DESCRIPTION.
615-2.....GENERAL REQUIREMENTS.
615-3.....COMPENSATION.
SECTION 620 -- ASPHALT CEMENT FOR PLANT MIX
620-1.....DESCRIPTION.
620-2.....MATERIALS.
620-3.....GENERAL REQUIREMENTS.
620-4.....METHOD OF MEASUREMENT.
620-5.....BASIS OF PAYMENT.
SECTION 622 -- NON-STRIP ADDITIVE FOR PLANT MIX
620-1.....DESCRIPTION.
620-2.....MATERIALS.
620-3.....GENERAL REQUIREMENTS.
620-4.....METHOD OF MEASUREMENT.
620-5.....BASIS OF PAYMENT.
SECTION 630 -- ASPHALT CONCRETE BASE COURSE, TYPE HB
630-1.....DESCRIPTION.
630-2.....MATERIALS.
630-3.....COMPOSITION OF MIXTURE.
(A).....General Requirements:
(B).....Job Mix Formula:
(C).....Requirements for Completed Plant Mix:
630-4.....CONSTRUCTION REQUIREMENTS
630-5.....METHOD OF MEASUREMENT.
630-6.....BASIS OF PAYMENT.
SECTION 635 -- SAND ASPHALT BASE AND SURFACE COURSE, TYPE F-1
635-1.....DESCRIPTION.
635-2.....MATERIALS.
635-3.....COMPOSITION OF MIXTURE.
(A).....General Requirements:
(B).....Job Mix Formula:
(C).....Requirements for Completed Plant Mix:
635-4.....CONSTRUCTION REQUIREMENTS.
635-5.....METHOD OF MEASUREMENT.
635-6.....BASIS OF PAYMENT.
SECTION 640 -- ASPHALT CONCRETE BINDER COURSE, TYPES H AND HDB
640-1.....DESCRIPTION.
640-2.....MATERIALS.
640-3.....COMPOSITION OF MIXTURE.
(A).....General Requirements:
(B).....Job Mix Formula:
(C).....Requirements for Completed Plant Mix:
640-4.....CONSTRUCTION REQUIREMENTS.
640-5.....METHOD OF MEASUREMENT.
640-6.....BASIS OF PAYMENT.
SECTION 645 -- ASPHALT CONCRETE SURFACE COURSE, TYPES I-1, I-2, AND HDS
645-1.....DESCRIPTION.
645-2.....MATERIALS.
645-3.....COMPOSITION OF MIXTURE.
(A).....General Requirements:
(B).....Job Mix Formula:
(C).....Requirements for Completed Plant Mix:
645-4.....CONSTRUCTION REQUIREMENTS.
645-5.....METHOD OF MEASUREMENT.
645-6.....BASIS OF PAYMENT.
OPEN-GRADED ASPHALT FRICTION
SECTION 650 -- COURSE, TYPE J-1
650-1.....DESCRIPTION.
650-2.....MATERIALS.
650-3.....COMPOSITION OF MIXTURE.
650-4.....CONSTRUCTION REQUIREMENTS.
650-5.....METHOD OF MEASUREMENT.
650-6.....BASIS OF PAYMENT.
SECTION 652 -- PERMEABLE ASPHALT DRAINAGE COURSE TYPES P-78M AND P-57
652-1.....DESCRIPTION.
652-2.....MATERIALS.
652-3.....COMPOSITION OF MIXTURE.
652-4.....CONSTRUCTION REQUIREMENTS.
652-5.....METHOD OF MEASUREMENT.
652-6.....BASIS OF PAYMENT.
SECTION 654 -- ASPHALT PLANT MIX, PAVEMENT REPAIR
654-1.....DESCRIPTION.
654-2.....MATERIALS.
654-3.....CONSTRUCTION METHODS.
(A).....General:
(B).....Pipe Removal or Installation:
654-4.....METHOD OF MEASUREMENT.
654-5.....BASIS OF PAYMENT.
SECTION 660 -- ASPHALT SURFACE TREATMENT
660-1.....DESCRIPTION.
660-2.....MATERIALS.
660-3.....WEATHER AND SEASONAL LIMITATIONS.
660-4.....SURFACE PREPARATION.
660-5.....ACCEPTANCE OF ASPHALT MATERIALS.
660-6.....APPLICATION EQUIPMENT.
660-7.....APPLICATION OF ASPHALT MATERIALS.
660-8.....APPLICATION OF AGGREGATES.
660-9.....CONSTRUCTION METHODS.
(A).....Asphalt Mat Coat:
(B).....Asphalt Seal Coat:
.....1......Straight Seal:
.....2......Drag Seal -- Type A:
.....3......Drag Seal -- Type B:
.....4......Split Seal:
.....5......Triple Seal:
.....6......Sand Seal:
(C).....Asphalt Mat and Seal:
660-11.....MAINTENANCE AND PROTECTION.
660-12.....METHOD OF MEASUREMENT.
660-13.....BASIS OF PAYMENT.