| SECTION 1605 -- TEMPORARY SILT FENCE | ||||
| 1605-1.....DESCRIPTION. | ||||
| 1605-2.....MATERIALS. | ||||
| (A).....Posts: | ||||
| (B).....Woven Wire Fence: | ||||
| (C).....Filter Fabric: | ||||
| (D).....Wire Staples: | ||||
| 1605-3.....INSTALLATION. | ||||
| 1605-4.....MAINTENANCE AND REMOVAL. | ||||
| 1605-5.....METHOD OF MEASUREMENT. | ||||
| SECTION 1608 -- BRUSH BARRIER | ||||
| 1608-1.....DESCRIPTION. | ||||
| 1608-2.....MATERIALS. | ||||
| 1608-3.....CONSTRUCTION METHODS. | ||||
| 1608-4.....METHOD OF MEASUREMENT. | ||||
| 1608-5.....BASIS OF PAYMENT. | ||||
| SECTION 1610 -- STONE FOR EROSION CONTROL | ||||
| 1610-1.....DESCRIPTION. | ||||
| 1610-2.....MATERIALS. | ||||
| 1610-3.....CONSTRUCTION METHODS. | ||||
| 1610-4.....METHOD OF MEASUREMENT. | ||||
| 1610-5.....BASIS OF PAYMENT. | ||||
| SECTION 1615 -- TEMPORARY MULCHING | ||||
| 1615-1.....DESCRIPTION. | ||||
| 1615-2.....MATERIALS. | ||||
| 1615-3.....APPLICATION. | ||||
| 1615-4.....METHOD OF MEASUREMENT. | ||||
| 1615-5.....BASIS OF PAYMENT. | ||||
| SECTION 1620 -- TEMPORARY SEEDING | ||||
| 1620-1.....DESCRIPTION. | ||||
| 1620-2.....MATERIALS. | ||||
| 1620-3.....SEEDBED PREPARATION. | ||||
| 1620-4.....APPLYING AND COVERING FERTILIZER AND SEED. | ||||
| 1620-5.....MOWING AND REPAIR OF TEMPORARY SEEDING. | ||||
| 1620-6.....METHOD OF MEASUREMENT. | ||||
| (A).....Seed: | ||||
| (B).....Fertilizer: | ||||
| (C).....Mulching: | ||||
| (D).....Mowing: | ||||
| 1620-7.....BASIS OF PAYMENT. | ||||
| (A).....Seed: | ||||
| (B).....Fertilizer: | ||||
| (C).....Mulching: | ||||
| (D).....Mowing: | ||||
| (E).....Compensation: | ||||
| (F).....Pay Items: | ||||
| SECTION 1622 -- TEMPORARY SLOPE DRAINS | ||||
| 1622-1.....DESCRIPTION. | ||||
| 1622-2.....MATERIALS. | ||||
| 1622-3.....CONSTRUCTION METHODS. | ||||
| (A).....Temporary Slope Drains: | ||||
| (B).....Inlet Protection at Temporary Slope Drain: | ||||
| 1622-4.....METHOD OF MEASUREMENT. | ||||
| 1622-5.....BASIS OF PAYMENT. | ||||
| SECTION 1630 -- CONSTRUCTION AND MAINTENANCE OF SILT | ||||
| DETENTION DEVICES | ||||
| 1630-1.....DESCRIPTION. | ||||
| 1630-2.....GENERAL. | ||||
| 1630-3.....DISPOSAL OF MATERIALS. | ||||
| 1630-4.....METHOD OF MEASUREMENT. | ||||
| 1630-5.....BASIS OF PAYMENT. | ||||
| SECTION 1631 -- DITCH LINER AND EROSION CONTROL | ||||
| BLANKETS | ||||
| 1631-1.....DESCRIPTION. | ||||
| 1631-2.....MATERIALS. | ||||
| 1631-3.....CONSTRUCTION METHODS. | ||||
| (A).....Synthetic Roving: | ||||
| (B).....Placing Matting: | ||||
| 1631-4.....METHOD OF MEASUREMENT. | ||||
| 1631-5.....BASIS OF PAYMENT. | ||||
| SECTION 1632 -- ROCK INLET SEDIMENT TRAP | ||||
| 1632-1.....DESCRIPTION. | ||||
| 1632-2.....MATERIALS. | ||||
| (A).....Posts: | ||||
| (B).....Wire Staples: | ||||
| (C).....1/4 inch hardware cloth: | ||||
| (D).....Other Materials: | ||||
| 1632-3.....CONSTRUCTION. | ||||
| (A).....Type A: | ||||
| (B).....Type B: | ||||
| (C).....Type C: | ||||
| 1632-4.....MAINTENANCE AND REMOVAL. | ||||
| 1632-5.....METHOD OF MEASUREMENT. | ||||
| 1632-6.....BASIS OF PAYMENT. | ||||
| SECTION 1633 -- TEMPORARY ROCK SILT CHECKS | ||||
| 1633-1.....DESCRIPTION. | ||||
| 1633-2.....MATERIALS. | ||||
| 1633-3.....CONSTRUCTION. | ||||
| (A).....Type A: | ||||
| (B).....Type B: | ||||
| 1633-4.....MAINTENANCE AND REMOVAL. | ||||
| 1633-5.....METHOD OF MEASUREMENT. | ||||
| 1633-6.....BASIS OF PAYMENT. | ||||
| SECTION 1634 -- TEMPORARY ROCK SEDIMENT DAMS | ||||
| 1634-1.....DESCRIPTION. | ||||
| 1634-2.....MATERIALS. | ||||
| 1634-3.....CONSTRUCTION. | ||||
| (A).....Type-A: | ||||
| (B).....Type-B: | ||||
| 1634-4.....MAINTENANCE AND REMOVAL. | ||||
| 1634-5.....METHOD OF MEASUREMENT. | ||||
| 1634-6.....BASIS OF PAYMENT. | ||||
| SECTION 1635 -- ROCK PIPE INLET SEDIMENT TRAP | ||||
| 1635-1.....DESCRIPTION. | ||||
| 1635-2.....MATERIALS. | ||||
| 1635-3.....CONSTRUCTION. | ||||
| (A).....Type A: | ||||
| (B).....Type B: | ||||
| 1635-4.....MAINTENANCE AND REMOVAL. | ||||
| 1635-5.....METHOD OF MEASUREMENT. | ||||
| 1635-6.....BASIS OF PAYMENT. | ||||
| SECTION 1636 -- TEMPORARY ROCK SILT SCREEN | ||||
| 1636-1.....DESCRIPTION. | ||||
| 1636-2.....MATERIALS. | ||||
| 1636-3.....CONSTRUCTION. | ||||
| 1636-4.....MAINTENANCE AND REMOVAL. | ||||
| 1636-5.....METHOD OF MEASUREMENT. | ||||
| 1636-6.....BASIS OF PAYMENT. | ||||
| SECTION 1637 -- SILT BASIN TYPE-A | ||||
| 1637-1.....DESCRIPTION. | ||||
| 1637-2.....MATERIALS. | ||||
| 1637-3.....CONSTRUCTION. | ||||
| 1637-4.....MAINTENANCE AND REMOVAL. | ||||
| 1637-5.....METHOD OF MEASUREMENT. | ||||
| 1637-6.....BASIS OF PAYMENT. | ||||
| SECTION 1638 -- STILLING BASIN | ||||
| 1638-1.....DESCRIPTION. | ||||
| 1638-2.....MATERIALS. | ||||
| 1638-3.....CONSTRUCTION | ||||
| 1638-4.....MAINTENANCE AND REMOVAL. | ||||
| 1638-5.....METHOD OF MEASUREMENT. | ||||
| 1638-6.....BASIS OF PAYMENT. | ||||
| SECTION 1650 -- WOODED AREA CLEANUP | ||||
| 1650-1.....DESCRIPTION. | ||||
| 1650-2.....MATERIALS. | ||||
| 1650-3.....CONSTRUCTION REQUIREMENTS. | ||||
| 1650-4.....DAMAGE TO REMAINING VEGETATION. | ||||
| 1650-5.....METHOD OF MEASUREMENT. | ||||
| 1650-7.....BASIS OF PAYMENT. | ||||
| SECTION 1651 -- SELECTIVE VEGETATION REMOVAL | ||||
| 1651-1.....DESCRIPTION. | ||||
| 1651-2.....MATERIALS. | ||||
| 1651-3.....CONSTRUCTION REQUIREMENTS. | ||||
| (A).....Trees: | ||||
| (B).....Undergrowth: | ||||
| (C).....General: | ||||
| 1651-4.....DAMAGE TO REMAINING VEGETATION. | ||||
| 1651-5.....METHOD OF MEASUREMENT. | ||||
| 1651-6.....BASIS OF PAYMENT. | ||||
| SECTION 1660 -- SEEDING AND MULCHING | ||||
| 1660-1.....DESCRIPTION. | ||||
| 1660-2.....MATERIALS. | ||||
| 1660-3.....COORDINATION WITH GRADING OPERATIONS. | ||||
| 1660-4.....SEEDBED PREPARATION. | ||||
| 1660-5.....APPLYING AND COVERING LIMESTONE, FERTILIZER, AND SEED. | ||||
| (A).....General: | ||||
| (B).....Limestone and Fertilizer: | ||||
| (C).....Seed: | ||||
| (D).....Modifications: | ||||
| 1660-6.....MULCHING. | ||||
| (A).....General: | ||||
| (B).....Applying Mulch: | ||||
| (C).....Holding Mulch: | ||||
| 1660-7.....MAINTENANCE OF SEED AND MULCHING. | ||||
| 1660-8.....METHOD OF MEASUREMENT. | ||||
| (A).....Seeding and Mulching: | ||||
| (B).....Mowing: | ||||
| 1660-9.....BASIS OF PAYMENT. | ||||
| (A).....Seeding and Mulching: | ||||
| (B).....Mowing: | ||||
| (C).....Limestone and Fertilizer: | ||||
| (D).....Compensation: | ||||
| (E).....Pay Items: | ||||
| SECTION 1661 -- REPAIR SEEDING | ||||
| 1661-1.....DESCRIPTION. | ||||
| 1661-2.....MATERIALS. | ||||
| 1661-3.....SEEDBED PREPARATION. | ||||
| 1661-4.....APPLICATION OF FERTILIZER, SEED AND MULCH. | ||||
| 1661-5.....METHOD OF MEASUREMENT. | ||||
| (A).....Seed: | ||||
| (B).....Fertilizer: | ||||
| 1661-6.....BASIS OF PAYMENT. | ||||
| (A).....Seed. | ||||
| (B).....Fertilizer: | ||||
| (C).....Mulch: | ||||
| (D).....Compensation: | ||||
| (E).....Pay Items: | ||||
| SECTION 1662 -- SUPPLEMENTAL SEEDING | ||||
| 1662-1.....DESCRIPTION. | ||||
| 1662-2.....MATERIALS. | ||||
| 1662-3.....APPLICATION. | ||||
| 1662-4.....METHOD OF MEASUREMENT. | ||||
| 1662-5.....BASIS OF PAYMENT. | ||||
| SECTION 1663 -- SPRIGGING AND SODDING | ||||
| 1663-1.....DESCRIPTION. | ||||
| 1663-2.....MATERIALS. | ||||
| 1663-3.....SPRIGGING. | ||||
| (A).....Soil Preparation: | ||||
| (B).....Application of Limestone, Fertilizer, Sprigs, and Seed: | ||||
| (C).....Watering Sprigs: | ||||
| 1663-4.....SODDING. | ||||
| (A).....Handling and Storing Sod: | ||||
| (B).....Soil Preparation: | ||||
| (C).....Placing Sod: | ||||
| (D).....Watering Sod: | ||||
| 1663-5.....MAINTENANCE OF SPRIGGING AND SODDING. | ||||
| 1663-6.....METHOD OF MEASUREMENT. | ||||
| (A).....Sprigging: | ||||
| (B).....Sodding: | ||||
| (C).....Water: | ||||
| (D).....Mowing: | ||||
| 1663-7.....BASIS OF PAYMENT. | ||||
| (A).....Sprigging: | ||||
| (B).....Sodding: | ||||
| (C).....Water: | ||||
| (D).....Mowing: | ||||
| (E).....Limestone, Fertilizer, and Seed: | ||||
| (F).....Compensation: | ||||
| (G).....Pay Items: | ||||
| SECTION 1665 -- FERTILIZER TOPDRESSING | ||||
| 1665-1.....DESCRIPTION. | ||||
| 1665-2.....MATERIALS. | ||||
| 1665-3.....APPLICATION OF FERTILIZER TOPDRESSING. | ||||
| 1665-4.....METHOD OF MEASUREMENT. | ||||
| 1665-5.....BASIS OF PAYMENT. | ||||
| SECTION 1670 -- PLANTING | ||||
| 1670-1.....DESCRIPTION. | ||||
| 1670-2.....MATERIALS. | ||||
| 1670-3.....WEATHER AND SEASONAL LIMITATIONS. | ||||
| 1670-4.....CARE AND HANDLING PLANTS. | ||||
| (A).....General: | ||||
| (B).....Balled and Burlapped Plants: | ||||
| (C).....Bare Rooted Plants: | ||||
| 1670-5.....PLANT LOCATION. | ||||
| 1670-6.....PRUNING. | ||||
| 1670-7.....PLANT BED TREATMENT. | ||||
| (A).....General: | ||||
| (B).....Fumigation: | ||||
| (C).....Herbicidal Treatment: | ||||
| 1670-8.....EXCAVATION OF PLANT HOLES. | ||||
| 1670-9.....PLANTING, BACKFILLING, AND WATERING. | ||||
| (A).....General: | ||||
| (B).....Balled and Burlapped Plants: | ||||
| (C).....Container Grown Plants: | ||||
| (D).....Bare Rooted Plants: | ||||
| (E).....Reforestation Plants: | ||||
| 1670-10.....MULCH FOR PLANTING. | ||||
| 1670-11.....WATER FOR PLANTING. | ||||
| 1670-12.....STAKING OR GUYING. | ||||
| 1670-13.....INITIAL PLANTING. | ||||
| 1670-14.....ESTABLISHMENT. | ||||
| 1670-15.....REPLACEMENT PLANTING. | ||||
| 1670-16.....FINAL INSPECTION. | ||||
| 1670-17.....METHOD OF MEASUREMENT. | ||||
| 1670-18.....BASIS OF PAYMENT. | ||||