|
|
|
| R1R01 |
PROJECT SPECIAL PROVISIONS - ROADWAY |
|
| R1R04 |
SHOULDER CONSTRUCTION |
|
| R1R07A * |
SHOULDER RE-CONSTRUCTION |
May 11 |
| R1R07B * |
SHOULDER RE-CONSTRUCTION SEED AND MULCH |
May 11 |
| R1R07C * |
SHOULDER RECONSTRUCTION |
May 11 |
| R1R07D * |
SHOULDER RECONSTRUCTION |
May 11 |
| R1R07E * |
SHOULDER RECONSTRUCTION |
May 11 |
| R1R07F |
SHOULDER RECONSTRUCTION PER SHOULDER MILE (5th DIVISION) |
Nov 10 |
| R1R10 |
SHOULDER CONSTRUCTION PROCEDURE |
|
| R1R34 |
CONSTRUCTION SEQUENCE |
|
| R3R36 |
PIPE ALTERNATES | |
| R5R28 |
INCIDENTAL STONE BASE |
|
| R6R01 |
ASPHALT PAVEMENTS SUPERPAVE |
Oct 11 |
| R6R02A |
ASPHALT PAVEMENTS-WARM MIX ASPHALT(At the Contractor's Option)<> |
Feb 11 |
| R6R02B |
ASPHALT PAVEMENTS-WARM MIX ASPHALT (Required) |
Jan 11 |
| R6R03 |
SHOULDER WEDGE |
Sept 11 |
| R6R06A |
FIXED STRING LINE |
Feb 11 |
| R6R06B |
FIXED AND MOBILE STRING LINES |
Feb 11 |
| R6R15 |
BINDER CONTENT OF ASPHALT PLANT MIXES
SUPERPAVE |
July 11 |
| R6R20 |
ASPHALT PLANT MIXTURES | |
| R6R24 |
CONDITIONING ROAD |
|
| R6R25 |
PRICE ADJUSTMENT - ASPHALT BINDER PLANT MIX |
|
| R6R45 |
FINAL SURFACE TESTING - ASPHALT PAVEMENT |
|
| R6R49 |
ASPHALT CONCRETE SURFACE COURSE COMPACTION |
|
| R6R52 |
WEDGE COURSE |
|
| R6R56 |
WARRANTY OF ASPHALT SURFACE TREATMENT ( Do not include if overlayed with surface course) |
|
| R6R58 * |
REPAIR OF EXISTING PAVEMENT | |
| R6R61 |
RESURFACING EXISTING BRIDGES | |
| R6R62 |
QMS OPEN GRADED OR PERMABLE OR ULTRA-THIN |
Apr 10 |
| R6R64 |
PAVING INTERSECTIONS - Contractor condition, prime, and surface |
|
| R6R67 |
PAVING INTERSECTIONS - State Forces condition, prime |
|
| R6R70 |
PAVING INTERSECTIONS, DRIVEWAYS AND MAILBOX TURNOUTS |
|
| R6R73 |
PAVING INTERSECTIONS, DRIVEWAYS AND MAILBOX TURNOUTS (3rd Div.) |
|
| R6R76 |
NOTE TO CONTRACTOR (Pavement varies in width) |
|
| R6R79 |
TRENCHING FOR BASE COURSE (Contractor disposes of excess material) |
|
| R6R82 |
TRENCHING FOR BASE COURSE (State Forces dispose of excess material) |
|
| R6R85 |
ASPHALT CONCRETE SURFACE COURSE, TYPE ___ (LEVELING COURSE - Do not fill in type) |
|
| R6R88 |
PATCHING EXISTING PAVEMENT |
|
| R6R91 |
SEALING EXISTING PAVEMENT CRACKS |
|
| R8R02 |
BORROW EXCAVATION AND SHPO DOCUMENTATION FOR BORROW/WASTE SITES |
|
| R8R25 |
END WALLS |
|
| R8R64 |
GUARDRAIL ANCHOR UNITS, TL-2 | Aug 11 |
| R8R65 |
GUARDRAIL ANCHOR UNITS, TYPE 350 | Aug 11 |
| R8R95 |
ADJUSTMENT OF MANHOLES (5th Division) |
|
| R8R96 |
ADJUSTMENT OF MANHOLES (rings or rapid set) | |
| R8R97 |
ADJUSTMENT OF MANHOLES, METER BOXES, AND VALVE BOXES (cast iron or steel fittings not permitted) |
|
| R8R125 |
DETECTABLE WARNING TO RETROFIT EXISTING CURB RAMPS |
Aug 11 |
| R8R126 |
DETECTABLE WARNING FOR PROPOSED CURB RAMPS |
Aug 11 |
| R8R127 |
REMOVE AND REPLACE CURB RAMPS |
Aug 11 |
| R8R128 |
CONCRETE SIDEWALKS, DRIVEWAYS AND CURB RAMPS |
Aug 11 |
| R9R02 |
STEEL U-CHANNEL POSTS AND STEEL SQUARE TUBE SUPPORTS |
Jan 11 |
| R9R03 |
SHIPPING SIGNS |
|
| R10R01 |
HIGH STRENGTH CONCRETE FOR DRIVEWAYS |
|
| R10R02 |
GALVANIZED HIGH STRENGTH BOLDS, NUTS AND WASHERS |
|
| R10R05 |
AGGREGATE PRODUCTION |
|
| R10R10 |
CONCRETE BRICK AND BLOCK PRODUCTION |
|
| R10R13 |
VOLUMETRIC CONCRETE SPEC |
May 10 |
| R10R16 |
PORTLAND CEMENT CONCRETE (alkali silica reaction) |
|
| R10R17 |
WATER FOR CONCRETE |
Oct 10 |
| R10R35 |
GLASS BEADS |
Oct 10 |
| R10R40 |
ENGINEERING FABRICS (Projects w/Fabric) |
Oct 10 |
| R10R60 |
CHANNELIZING DEVICES (DRUMS) |
July 10 |
| R11R11 |
CHANGEABLE MESSAGE SIGNS |
|
| R11R20 |
WORK ZONE TRAFFIC CONTROL |
Aug 11 |
| R12R01 |
PAVEMENT MARKING LINES |
Aug 10 |
| R16R02 |
EROSION AND STORMWATER CONTROL FOR SHOULDER CONSTRUCTION AND RECONSTRUCTION |
Nov 10 |
| Z-1 |
PERMIT COVER SHEET (Delete lines that do not apply) |
|
| Z-2 |
AVAILABILITY OF FUNDS - TERMINATION OF CONTRACTS |
|
| Z-3 |
SEED QUALITY |
May 11 |
| Z-4 |
ERRATA |
|
| Z-4a |
PLANT AND PEST QUARANTINES |
|
| Z-5 |
MINIMUM WAGE (100% STATE FUNDED PROJECTS ONLY) |
|
| |
FEDERAL-AID PROJECTS ONLY |
|
| Z-6 |
AWARD OF CONTRACT |
|
| Z-7 |
MINORITY & FEMALE EMPLOYEE REGS. |
|
| Z-8 |
FHWA 1273 |
|
| Z-9 |
FHWA 1273, ATTACHMENT A (add to Z-8 if Appalachian project) |
|
| Z-10 |
TRAINING SPECIAL PROVISIONS |
|
| Z-123 |
WAGE RATES (Beaufort, Bertie, Camden, Carteret, Chowan, Craven, Dare, Gates, Hertford, Hyde, Jones, Martin, Pasquotank, Perquimans, Tyrrell and Washington Counties) |
Sept 11 |
| Z-124 |
WAGE RATES (Cumberland, Currituck, Hoke and Onslow Counties) |
Sept 11 |
| Z-125 |
WAGE RATES (Buncombe, Haywood, Henderson and Madison Counties) |
Sept 11 |
| Z-126 |
WAGE RATES (Alexander, Burke, Caldwell and Catawba Counties) |
Sept 11 |
| Z-127 |
WAGE RATES (Anson, Cabarrus, Gaston, Mecklenburg and Union Counties) |
Sept 11 |
| Z-128 |
WAGE RATES (Alamance, Davie, Forsyth, Stokes and Yadkin Counties) |
Sept 11 |
| Z-129 |
WAGE RATES (Guilford, Randolph, and Rockingham Counties) |
Sept 11 |
| Z-130 |
WAGE RATES (Chatham, Durham, Edgecombe, Greene, Nash, Orange, Person, Pitt and Wayne Counties) |
Sept 11 |
| Z-131 |
WAGE RATES (Franklin, Johnson, and Wake Counties) |
Sept 11 |
| Z-132 |
WAGE RATES (Brunswick, New Hanover and Pender Counties) |
Sept 11 |
| Z-133 |
WAGE RATES (Bladen, Cleveland, Columbus, Davidson, Duplin, Harnett, Iredell, Lee, Lenoir, Lincoln, Montgomery, Moore, Richmond, Robeson, Rowan, Sampson, Scotland, Stanly and Wilson Counties) |
Sept 11 |
| Z-134 |
WAGE RATES (Alleghany, Ashe, Avery, Cherokee, Clay, Graham, Jackson, Macon, McDowell, Mitchell, Polk, Rutherford, Surry, Swain, Transylvania, Watauga, Wilkes and Yancy Counties) |
Sept 11 |
| Z-135 |
WAGE RATES (Caswell, Granville, Halifax, Northampton, Vance and Warren Counties) |
Sept 11 |
| |
MISCELLANEOUS FORMS |
|
| MISC1 |
AWARD LIMITS |
|
| MISC2 |
LISTING DBE SUBCONTRACTORS (Federal Aid Projects) |
|
| MISC3 |
LISTING MBE/WBE SUBCONTRACTORS (State Funded Projects) |
|
| MISC4 |
SIGNATURE SHEETS & DEBARMENT CERTIFICATIONS |
Apr 11 |
| MISC5 |
BID BONDS |
Apr 11 |
| MISC6 |
PAYMENT/PERFORMANCE BONDS |
|