MASTER FOR 2002 SPECS
GENERAL CONSTRUCTION PROJECTS
GENERAL
| SP1G01 | PROJECT SPECIAL PROVISIONS - General |
| SP1G04 | CONTRACT TIME AND LIQUIDATED DAMAGES The date of availability for this contract is _________________________________ The completion date for this contract is _________________________________ The liquidated damages for this contract time are $________________________________ per calendar day. (ANY type of permit) |
| SP1G05 | CONTRACT TIME AND LIQUIDATED DAMAGES (Floating Availability Dates) (ANY type of permit) |
| SP1G07 | CONTRACT TIME AND LIQUIDATED DAMAGES The date of availability for this contract is _________________________________ The completion date for this contract is _________________________________ The liquidated damages for this contract time are $________________________________ per calendar day. (ICT for REFORESTATION and Any type of Permit) |
| SP1G10 | CONTRACT TIME AND LIQUIDATED DAMAGES (7-1-95) The date of availability for this contract is _________________________________ The completion date for this contract is _________________________________ The liquidated damages for this contract time are $________________________________ per calendar day. |
| SP1G13 | INTERMEDIATE CONTRACT TIME NUMBER AND LIQ. DAMAGES All work except reforestation completed by _________________________________ The date of availability for this work is _________________________________ The liquidated damages for this intermediate contract time are $________________________________ per calendar day. |
| SP1G14 | SAFETY INDEX RATING (All Projects) |
| SP1G16 | MANDATORY PRE-BID CONFERENCE: PREQUALIFYING TO BID |
| SP1G19 | PRE-BID CONFERENCE |
| SP1G22 | DELAY IN RIGHT OF ENTRY |
| SP1G25 | NOTICE TO BIDDERS (Cluster Projects) |
| SP1G28 | MAJOR CONTRACT ITEMS Line #                                                Description ______________________      ________________________________ ______________________      ________________________________ ______________________      ________________________________ ______________________      ________________________________ ______________________      ________________________________ ______________________      ________________________________ |
| SP1G31 | NO MAJOR CONTRACT ITEMS |
| SP1G34 | NO SPECIALITY ITEMS |
| SP1G37 | SPECIALITY ITEMS Line #                                        Description ______________________      Guardrail Items ______________________      Fencing Items ______________________      Signing Items ______________________      Long-Life Pavement Markings ______________________      Pavement Markers ______________________      Lighting Items ______________________      Utility Construction Items ______________________      Erosion Control Items ______________________      Reforestation Items ______________________      Planting Items ______________________      Rest Area Items ______________________      Signal Items ______________________      ITS System Items ______________________      Drilled Piers |
| SP1G40 | SPECIAL REQUIREMENTS FOR WORK IN NATIONAL FOREST |
| SP1G43 | FUEL PRICE ADJUSTMENT (English) |
| SP1G46 | FUEL PRICE ADJUSTMENT (Metric) |
| SP1G49 | PARTNERING |
| SP1G58 | SCHEDULE OF ESTIMATED COMPLETION PROGRESS |
| SP1G60 | ON-LINE ELECTRONIC BIDDING |
| SP1G61 | DISADVANTAGED BUSINESS ENTERPRISES (with Goals)________ % |
| SP1G64 | DISADVANTAGED BUSINESS ENTERPRISES (0.0% Goals) |
| SP1G67 | MINORITY AND WOMEN BUSINESSES (with goals)
MB ____________ % WB ____________ % |
| SP1G70 | MINORITY AND WOMEN BUSINESSES (without goals) |
| SP1G73 | RETAINAGE AND PROMPT PAYMENT
(FEDERAL AID PROJECTS) |
| SP1G75 | MENTOR-PROTÉGÉ PROGRAM
(When requested by the Proposals and Contract Engineer) |
| SP1G76 | PROMPT PAYMENT (STATE FUNDED PROJECTS) |
| SP1G82 | PARTIAL PAYMENTS (STATE FUNDED PROJECTS) |
| SP1G85 | CERTIFICATION FOR FEDERAL-AID CONTRACTS (F.A. Only) |
| SP1G88 | CONTRACTOR'S LICENSES REQUIREMENTS Use on roadway, rest area, weigh station, project signal work, and lighting projects when heating, plumbing, air conditioning, or electrical work is included in the projects. |
| SP1G91 | SUBMISSION OF BIDS - ALTERNATES |
| SP1G95 | RECYCLED STEEL *Deleted July 2006 letting* |
| SP1G97 | DOMESTIC STEEL AND IRON PRODUCTS (All Projects) |
| SP1G100 | U.S. DEPARTMENT OF TRANSPORTATION HOTLINE (F.A. Only) |
| SP1G103 | SUBMISSION OF RECORDS - FEDERAL-AID PROJECTS (BRZ) |
| SP1G106 | SUBMISSION OF RECORDS - FEDERAL-AID PROJECTS (on NHS + 1 million project cost) |
| SP1G109 | SUBMISSION OF RECORDS - FEDERAL-AID PROJECTS (not on NHS) |
| SP1G110 | COMPENSATION AND RECORD KEEPING (All Projects) |
| SP1G111 | CONTRACTOR BORROW SOURCE |
| SP1G112 | SUBSURFACE INFORMATION (Is not available) |
| SP1G115 | SUBSURFACE INFORMATION (Roadway) |
| SP1G118 | SUBSURFACE INFORMATION (Structures) |
| SP1G119 | SUBSURFACE INFORMATION (Roadway & Structures) |
| SP1G120 | BORROW AND WASTE SITE RECLAMATION PROCEDURES |
| SP1G121 | PAYMENTS FOR MATERIALS - PORTABLE CONCRETE BARRIER |
| SP1G124 | PAYMENTS FOR MATERIALS - REMOVABLE PAVEMENT MARKING MATERIAL |
| SP1G130 | PLANT PEST QUARANTINE |
| SP1G133 | COOPERATION BETWEEN CONTRACTORS |
| SP1G136 | TRAINING REQUIREMENTS __________Trainees |
| SP1G139 | SAFETY VESTS (All Projects) |
| SP1G142 | BID DOCUMENTATION |
| SP1G143 | DIRECTOR OF CONSTRUCTION IN LIEU OF CHIEF ENGINEER |
| SP1G145 | TWELVE MONTH GUARANTEE - TIP ONLY |
| SP1G150 | OUTSOURCING OUTSIDE THE USA |
| SP1G151 | ACT OF GOD - DEC 2002 LET |
| SP1G155 | DISQUALIFICATION OF BIDDERS |
| SP1G160 | CRANE SAFETY |
| SP1G165 | FORCE ACCOUNT |
| SP1G170 | CONTROL OF EROSION, SILTATION AND POLLUTION |
| SP1G175 | REJECTION OF BIDS |
| SP1G180 | EROSION & SEDIMENT CONTROL STORMWATER CERTIFICATION |
| ROADWAY | |
| SP1R01 | PROJECT SPECIAL PROVISONS - Roadway |
| SP2R01 | CLEARING AND GRUBBING Method"____________"shown on Standard No._________ |
| SP2R02 | CLEARING AND GRUBBING Method"____________"as detailed in the plans |
| SP2R05 | BURNING RESTRICTIONS |
| SP2R10 | DEMOLITION OF BUILDINGS AND APPURTENANCES |
| SP2R15 | BUILDING AND UNDERGROUND STORAGE TANK REMOVAL |
| SP2R18 | PROJECTS WITH SIGNAL POLES, OVERHEARD SIGN STRUCTURES AND HIGH MOUNT LIGHTING |
| SP2R20 | EXCAVATION OF ROCK BY EXPLOSIVES |
| SP2R25 | ROADWAY EXCAVATION |
| SP2R30 | TEMPORARY DETOURS |
| SP2R31 | TEMPORARY DETOURS (for lump sum grading) |
| SP2R35 | SHALLOW UNDERCUT |
| SP2R37 | BORROW EXCAVATON |
| SP2R40 | FALSE SUMPS |
| SP2R45 | SHOULDER AND FILL SLOPE MATERIAL (LUMP SUM GRADING jobs with shoulder and/or fill slopes.) |
| SP2R50 | SHOULDER AND FILL SLOPE MATERIAL (shoulder and/or fill slopes.) |
| SP2R57 | BORROW EXCAVATION (TRUCK MEASURMENT) |
| SP2R58 | BORROW EXCAVATION (IN PLACE OR TRUCK MEASURMENT) |
| SP2R65 | RESTRICTIONS ON CONSTRUCTION OF EMBANKMENTS |
| SP2R70 | COAL FLY ASH IN EMBANKMENTS |
| SP2R75 | EMBANKMENT MONITORING |
| SP2R80 | ROCK EMBANKMENT |
| SP2R90 | DRAINAGE DITCH EXCAVATION (HAND METHOD) |
| SP3R01 | REINFORCED CONCRETE TAPERED INLET |
| SP3R05 | SADDLE BRANCH CONNECTOR |
| SP3R10 | C.S.SLOTTED DRAIN |
| SP3R15 | 15" R. C. PIPE TEE DROP INLET |
| SP3R20 | SEEPS |
| SP3R25 | _____INCH (mm) WELDED STEEL PIPE (By Boring and Jacking) |
| SP3R30 | FLOWABLE FILL |
| SP3R35 | PIPE ALTERNATES |
| SP4R01 | REINFORCED BRIDGE APPROACH FILLS, STA._______ |
| SP5R01 | COMPACTION OF SUBGRADE (use with Field Inspection Notes) |
| SP5R05 | PREPARATION OF SUBGRADE AND BASE |
| SP5R10 | AGGREGATE BASE COURSE GRADATION AND PLASTICITY INDEX (use west of frost line) |
| SP5R15 | AGGREGATE FOR SOIL-CEMENT BASE |
| SP5R20 | LIME AND CEMENT TREATED SOIL |
| SP6R01 | ASPHALT PAVEMENTS SUPERPAVE |
| SP6R06 | ASPHALT PAVER - FIXED STRING LINE |
| SP6R07 | ASPHALT PAVER - MOBILE AND FIXED STRING LINE |
| SP6R15 | ASPHALT BINDER CONTENT OF ASPHALT PLANT MIXES Asphalt Concrete Base Course, Type B25.0___________ ------------------------------ 4.3% Asphalt Concrete Intermediate Course, Type I19.0___________ ----------------------- 4.7% Asphalt Concrete Surface Course, Type S 4.75A ----------------------------------------- 7.0% Asphalt Concrete Surface Course, Type SF 9.5A ----------------------------------------- 6.5% Asphalt Concrete Surface Course, Type S9.5___________ ----------------------------- 6.0% Asphalt Concrete Surface Course, Type S12.5___________ ---------------------------- 5.5% |
| SP6R20 | ASPHALT PLANT MIXTURES |
| SP6R25 | PRICE ADJUSTMENT - ASPHALT BINDER FOR PLANT MIX $_____________ Date ______________ |
| SP6R40 | TYING PROPOSED ASPHALT PAVEMENT TO EXISTING CONCRETE PAVEMENT |
| SP6R45 | FINAL SURFACE TESTING - ASPHALT PAVEMENTS (Rideability) |
| SP6R50 | SEALING EXISTING PAVEMENT CRACKS |
| SP6R55 | SEALING EXISTING PAVEMENT CRACKS AND JOINTS |
| SP6R60 | FILTER FABRIC FOR PERMEABLE ASPHALT DRAINAGE LAYER |
| SP6R65 | MATERIAL TRANSFER VEHICLE (MTV) (Asphalt Binder PG 76-22) |
| SP7R01 | WATERPROOFING CONCRETE PAVEMENT JOINTS |
| SP7R05 | TYING PROPOSED CONCRETE PAVEMENT TO EXISTING CONCRETE PAVEMENT |
| SP7R10 | TYING PROPOSED CONCRETE PAVEMENT TO PROPOSED ASPHALT PAVEMENT |
| SP7R15 | BEGINNING AND ENDING OF CONCRETE PAVEMENT |
| SP8R01 | GEOCOMPOSITE SHOULDER DRAIN |
| SP8R02 | CONSTRUCTION SURVEYING |
| SP8R03 | DISPOSAL OF WASTE AND DEBRIS |
| SP8R05 | DITCH DRAIN |
| SP8R07 | FUNNEL AND FUNNEL DRAIN |
| SP8R10 | MODIFIED CONCRETE FLUME WITH CONCRETE OUTLET |
| SP8R15 | MODIFIED CONCRETE FLUME WITH FUNNEL OUTLET |
| SP8R20 | SLUICE GATE |
| SP8R27 | ENDWALLS (RSD 838.80 on sheet 1A) |
| SP8R31 | SANDBAG HEADWALL |
| SP8R35 | GRATES AND FRAME (DRIVEWAY DROP INLET) |
| SP8R40 | 2'-6" (750 mm) CONCRETE CURB AND GUTTER (SPECIAL) |
| SP8R45 | CONVERTING EXISTING DROP INLET TO SHOULDER DROP INLET |
| SP8R50 | CONVERT EXISTING __________ TO _________ |
| SP8R55 | REMOVE AND STOCKPILE EXISTING GUARDRAIL |
| SP8R57 | GUARDRAIL POSTS AND OFFSET BLOCKS |
| SP8R60 | GUARDRAIL ANCHOR UNITS, TYPE M350 |
| SP8R65 | GUARDRAIL ANCHOR UNITS, TYPE 350 |
| SP8R70 | STEEL BEAM GUARDRAIL (WEATHERING STEEL WITH WOOD POSTS) |
| SP8R75 | IMPACT ATTENUATOR UNITS, TYPE 350 |
| SP8R80 | VINYL COATED CHAIN LINK FENCE, 48" FABRIC WITH 1/2" MESH, GUARDRAIL MOUNTED |
| SP8R85 | TEMPORARY WOVEN WIRE FENCE |
| SP8R86 | PROJECTS WITH FENCING |
| SP8R90 | VINYL COATED CHAIN LINK FENCE _______ INCH (mm) FABRIC |
| SP8R95 | ERECTING FENCE ON RETAINING WALL |
| SP8R100 | CHAIN LINK FENCING WITH BARBED WIRE ON EXTENSION ARMS |
| SP8R105 | Preformed Scour Hole with Level Spreader Apron |
| SP8R110 | CONCRETE PAVED DITCH LEVEL SPREADER |
| SP8R105 | PREFORMED SCOUR HOLE WITH LEVEL SPREADER APRON |
| SP8R120 | CONCRETE SIDEWALKS, DRIVEWAYS AND WHEELCHAIR RAMPS |
| SP8R125 | RETROFITTING WHEELCHAIR RAMPS WITH DETECTABLE WARNINGS RAISED TRUNCATED DOMES |
| SP9R01 | STREET SIGNS AND ROUTE MARKERS |
| SP9R03 | SHIPPING SIGNS |
| SP10R01 | HIGH STRENGTH CONCRETE FOR DRIVEWAYS |
| SP10R05 | AGGREGATE PRODUCTION |
| SP10R10 | CONCRETE BRICK AND BLOCK PRODUCTION |
| SP10R12 | COARSE AGGREGATE |
| SP10R15 | FINE AGGREGATE |
| SP10R16 | PORTLAND CEMENT CONCRETE (Alkali-Silica Reaction) |
| SP10R17 | BORROW MATERIAL |
| SP10R20 | METAL POSTS AND RAILS |
| SP10R25 | COATED, PAVED AND LINED CORRUGATED STEEL CULVERT PIPE |
| SP10R30 | TRAFFIC CONTROL |
| SP10R45 | PAINT TESTING AND SAMPLING |
| SP11R01 | TEMPORARY SHORING FOR THE MAINTENANCE OF TRAFFIC |
| SP11R05 | DRUMS |
| SP11R10 | PORTABLE CONCRETE BARRIER |
| SP11R15 | WORK ZONE SIGNS |
| SP11R20 | BARRICADES |
| SP12R01 | PAVEMENT MARKING GENERAL REQUIREMENTS |
| SP14R01 | COORDINATION OF LIGHTING WORK (Existing lighting AND New roadway lighting) |
| SP16R01 | PERMANENT SEEDING AND MULCHING |