spacer spacer   spacer   spacer   spacer  
Title Header spacer
 
HOME
spacer
 
CONTACT
spacer
spacer  
SEARCH!
spacer
spacer
spacer
  NCDOT icon  NC DOT
  NCDOH icon  NC DOH
  NCgov.com icon  NC GOV
spacer
spacer spacer spacer spacer spacer spacer spacer spacer spacer
 
 
spacer
 
Unit Support    |    Staff   |    Project Special Provisons    |    Project Services    |   
spacer spacer
spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer
  Spring Field Review Site 9
spacer
spacer spacer  
Spring Field Review Site 9

Description: R-2548A - WASHINGTON-TYRRELL COUNTIES

LOCATION: Bridge on US 64 between SR 1119 and SR 1125

ITEM(S) OF INTEREST: Curved alignment on a widened cored slab structure with an asphalt overlay.
Observations and Points of Discussion:
  • Asphalt cracking over the joints
  • Some of the prestressed piles had poor finish.
  • Cracking on acute corners of cored slabs on a skew.
    • Repairs performed with appropriate product from approved list (epoxy motar)
  • Bridge had horizontal drains through the rail at the ends of the bridge over the buffer zones.
    • For such a long structure, drainage could have been more efficient with a closed drainage system.


  • picture 1 picture 2 picture 3 picture 4 picture 5 picture 6
     
    picture 7 picture 8 picture 10 picture 11 picture 12 picture 13
     
    picture 13 picture 14 picture 15 picture 16 picture 17 picture 18
     
    picture 19 picture 20 picture 21 picture 22 picture 23 picture 24
     
    picture 25 picture 26 picture 27 picture 28 picture 29 picture 30
     
    picture 37



    spacer spacer
    spacer
     
    North Carolina DOT Logo   The North Carolina
    Department of Transportation