spacer spacer   spacer   spacer   spacer  
Title Header spacer
 
HOME
spacer
 
CONTACT
spacer
spacer  
SEARCH!
spacer
spacer
spacer
  NCDOT icon  NC DOT
  NCDOH icon  NC DOH
  NCgov.com icon  NC GOV
spacer
spacer spacer spacer spacer spacer spacer spacer spacer spacer
 
 
spacer
 
Unit Support    |    Staff   |    Policy Memos    |    Project Services    |   
spacer spacer
spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer
  2012 PROJECT SPECIAL PROVISION FOR STRUCTURES AND CULVERTS
spacer
spacer spacer  
2012 PROJECT SPECIAL PROVISIONS
To Print This PSP Line-Up Sheet -click here- To Open the PDF File

To View Revisions Memos choose Date from List from the drop down and then click View Memos.

STRUCTURES AND CULVERTS
PSP No.
Title
File Type
Last Revised
1 Maintenance and Protection of Traffic Beneath Proposed Structure at Station ________ or 8-13-04
2 Construction, Maintenance and Removal of Temporary Structure at Station ________
                                                                                                                                See Footnote 1
or 9-30-11
3 Construction, Maintenance and Removal of Temporary Structure at Station ________
                                                                                                                                See Footnote 2
or 9-30-11
4 Construction, Maintenance and Removal of Temporary Access at Sta.__ See Footnote 3 or 9-30-11
5 Construction, Maintenance and Removal of Temporary Access at Sta.__ See Footnote 4 or 11-17-06
6 Temporary Bents or 9-30-11
7 Bridge Deck Rideability and Grooving at Station _____                                 See Footnote 5 or 9-30-11
8 Repair of Bridge Decks and Approach Pavement with Latex Modified Concrete or 9-30-11
9 Latex Modified Concrete or 9-30-11
10 Epoxy Resin Injection or 9-30-11
11 Epoxy Mortar Repairs or 9-30-11
12 Shotcrete Repairs or 9-30-11
13 Concrete Repairs or 9-30-11
14 Cleaning and Painting Existing Bearing Plates or 9-30-11
15 TFE Expansion Bearing Assemblies or 9-30-11
16 Pot Bearings                                                                                                        See Footnote 6 or 9-30-11
17 Optional Disc Bearings                                                                                         See Footnote 6 or 9-30-11
18 Thermal Sprayed Coatings (Metallization) or 9-30-11
19 Concrete Wearing Surface or 9-30-11
20 Sand Lightweight Concrete or 9-30-11
21 Elastomeric Concrete                                                                                        or 9-30-11
22 Foam Joint Seals                                                                                               See Footnote 6 or 9-30-11
23 Expansion Joint Seals                                                                                          See Footnote 6 or 9-30-11
24 Modular Expansion Joint Seals                                                                          See Footnote 6 or 9-30-11
25 Strip Seals                                                                                                              See Footnote 6 or 9-30-11
26 Precast Reinforced Concrete Box Culvert at Station ________                    See Footnote 7 or 2-10-12
27 Optional Precast Reinforced Concrete Box Culvert at Station ________     See Footnote 7 or 2-10-12
28 Electrical Conduit System for Signals or 9-30-11
29 Temporary Railroad Shoring or 3-6-09
30 Securing of Vessels                                                                                           See Footnote 8 or 10-12-01
31 Sound Barrier Wall or 9-30-11
32 Falsework and Formwork                                                                                     See Footnote 9 or 4-5-12
33 Submittal of Working Drawings                                                                           See Footnote 9 or 2-10-12
34 Crane Safety                                                                                                           See Footnote 9 or 8-15-05
35 Grout For Structures                                                                                             See Footnote 9 or 9-30-11


The following Special Provisions are to be written on a project by project basis.
           Removal of Existing Structure (When DOT wants salvage material or special removal.)



GEOTECHNICAL AND RETAINING WALLS
GEOTECHNICAL PROVISIONS


FOOTNOTES
1. Use this Special Provision when ADTT > 500.
2. Use this Special Provision when ADTT < 500.
3. Use this Special Provision when a Temporary Rock Causeway [Workpad] is shown on the plans.
4. Use this Special Provision when a Temporary Work Bridge is required.
5. Use “Bridge Deck Rideability and Grooving at Station ______” when the length of the bridge deck exceeds 1500 feet or when requested by the Area Bridge Construction Engineer.
6. When using “Pot Bearings”, “Optional Disc Bearings”, “Expansion Joint Seals”, “Modular Expansion Joint Seals” or “Strip Seals”, also include “Thermal Sprayed Coatings (Metallization)”. Include “Elastomeric Concrete” when using “Foam Joint Seals”.
7. Use “Precast Reinforced Concrete Box Culvert at Station ________” only when plans require precast culverts. Use “Optional Precast Reinforced Concrete Box Culvert at Station ________” when plans are detailed for cast-in-place culverts.
8. Use "Securing of Vessels" on projects with navigable waterways.
9. Use these Special Provisions on all projects.
10. Use this Special Provision on projects designed by the AASHTO Standard Specifications (LFD).