MEMORANDUM TO: Project Engineers
Project Design Engineers
FROM: W. J. Rogers, P. E.
State Bridge Design Engineer
DATE: May 29, 1997
SUBJECT: DRILLED PIER REINFORCEMENT

Effective immediately, place the following note on or near the bill of material for drilled piers:

"The Contractors attention is called to the fact that the reinforcement for the drilled pier is detailed with one meter (three feet) of extra length."

The Design Manual will be revised at a later date.


WJR/RGW/ap
cc: T. V. Rountree, P. E.
N. M. Salmon, P. E.



Back to Structures Main Page
Last Updated: 8/11/98 by:Steven Rackley
E-mail Structure Design