MEMORANDUM TO: Project Engineers
Project Design Engineers
FROM: W. J. Rogers, P. E.
State Bridge Design Engineer
DATE: April 29, 1997
SUBJECT: SOUND BARRIER WALL DETAILS

In order to standardize details and specifications for Sound Barrier Walls the attached drawings and special provisions have been prepared and are available for your use.

While sound barrier walls will remain a Roadway pay item, the details and special provision will be maintained by Structure Design.

The drawings are available on CADD in the Standard directories but will not be incorporated into the Structure Standards Book.


WJR/EEM/ap

Attachments

cc: N. M. Salmon, P. E., with attachments
T. V. Rountree, P. E., with attachments
J. F. Ledbetter, P. E., with attachments