MEMORANDUM TO: Project Engineers
Project Design Engineers
FROM: W. J. Rogers, P.E.
State Bridge Design Engineer
DATE:January 20,1998
SUBJECT:CORRECTIONS TO STANDARD BRIDGE APPROACH SLAB DETAILS

The standards BAS5 and BAS5SM have been corrected to show #4 "G" bars and #13 "G" bars in the sidewalk. Also, the sidewalk dimensions on Section I-I have been revised to reflect a slope fo 1/4"/ft or 20mm/m.

The revised standards are available in the standard directories and the Structure Design Homepage.

This policy is effective immediately.

EEM/bl



Back to Structures Main Page
Last Updated: 8/11/98 by:Steven Rackley
E-mail Structure Design