SMU-Working Drawing Submittal Status: 12/26/11 thru 2/14/12
RE Rec'd Date SDU Rec'd Date Contract No County Prime Contractor Resident Eng Location Station Submittals Prepared_by Submitted By Status Letter Sent Date
12/28/2011 12/28/2011 C202384 Brunswick Barnhill Contracting Company M. W. Currie, PE replace reinforced concrete box culvert with three 72-inch RCP carrying tributary to Morgan Creek under US 17 115+19 -Y1- sheet pile shoring with double wale rings - 32' x 30' x 15.5' Sanford Contractors, Inc. (Sanford) Gattis, Randall (Sanford) Accepted - See Letter 1/12/2012

12/29/2011 DE00007 Wake Traffic Control Devices, Inc. D. B. Moore US 64 / US 264 near Green Pace Road overpass, west of Zebulon
one butterfly type DMS support assembly - Dec.12 drilled shaft diameter revision Walpar, LLC (Birmingham, AL) Aslami, Mohd (ITS) Accepted 1/11/2012

12/29/2011 C202621 Nash Barnhill Contracting Company W. S. Joyner, PE Rocky Mount: Bridge No. 285 on SR 1613 (North Winstead Avenue) over Stoney Creek 27+87.83 -L- straight strand patterns, detensioning sequence, bed setups, falsework inserts, lifter for Type III prestress girders - Dec. 28 resubmittal for girder lines 6 & 7 only Florence Concrete Products, Inc. (Sumter, CS) Fay, Janet (Intercoastal) Accepted 1/25/2012
12/30/2011 12/30/2011 C202383 Rowan-Davidson Flatiron - Lane, A Joint Venture D. L. Waller, PE Bridge on I-85 SBL over Yadkin River and NSRR 882+88.07 -LREV- intermediate angle crossframe diaphragms - Dec 15 Revision Structural Steel Products Corp. (Clayton) Hajiadem, Rega (Flatiron-Lane) Accepted 1/10/2012

12/30/2011
Stokes Smith-Rowe, Inc.
Replace Bridge No. 13 with three-sided culvert over Little Yadkin River on SR 1136, north of Chestnut Grove 10+15.80 -EL- precast Bebo twin-leaf arch culvert - 71'-9" span x 20' rise x 54' length Contech Arch Engineering Beatty, Chris (Contech) (via Farzin Asefnia) Comments sent to Farzin Asefnia 1/11/2012

1/3/2012 C201993 Wake Raleigh-Durham Roadbuilders G. C. Gibson, PE Bridge on Old Holly Springs - Apex Road (SR 1153) over WWF 19+52.55 -Y3- prestress strand stressing calculations for straight and draped strands and detensioning for 72" MBT girder bridge -12 members Cranston Engineering Group, PC / Prestress of the Carolinas Hayes, Raymond (Mulkey) Returned for Correction 1/17/2012

1/3/2012 C202523 Mecklenburg-Cabarrus The Lane Construction Corporation D. C. Diggs, PE Bridge on Ramp F over I-85 and Ramp H 60+23.37 -RPF- straight strand stressing calculations and detensioning sequence, embeds, diaphragm attachment hole locations, shipping diagram for 379-ft, four-span 72-in MBT girder bridge - 16 members Cranston Engineering Group, PC / Prestress of the Carolinas White, Marty (Albemarle Residency) Accepted 1/5/2012
1/3/2012 1/3/2012 C202599 Pasquotank & Camden Archer Western Contractors, LTD R. W. Midgett, Jr., PE Replace Bridge No. 19 over Pasquotank River on Eastbound US 158 - west and east approach spans 15+25.75 -L1- (approach spans) prestressed concrete deck panels for fifteen spans - Jan. 2 Revision Bayshore Concrete Products (Cape Charles, VA) Midgett, R. W. (Elizabeth City Residency) Accepted 1/17/2012

1/4/2012 C202523 Mecklenburg-Cabarrus The Lane Construction Corporation D. C. Diggs, PE Bridge on Mallard Creek Road over I-85 and Ramp H 25+52.05 -Y1- pot bearing assemblies - 15 assemblies - Dec 15 Drawings Revision The D. S. Browm Company (North Baltimore, OH) White, Marty (Albemarle Residency) Accepted 1/17/2012

1/4/2012 DO00135 Jackson Taylor & Murphy Construction Co., Inc. Mitchell Bishop, PE Bridge No. 82 over Tuckaseegee River on SR 1002 - Deck Replacement 10+00.00 -L- existing steel beam jacking plan to replace brearings - four span bridge Taylor & Murphy Construction Co., Inc. Herrin, John (Taylor & Murphy) Accepted 1/24/2012

1/4/2012 C202438 Davidson Lee Construction Company of the Carolinas, Inc. D. L. Swicegood. PE Replace Bridge No. 158 over US 29 / 70 and I-85 Business on SR 1792 (Martin Luther King, Jr. Drive), in Thomasville 21+88.20 -L- mass concrete analysis and temperature control plan for end bent pours Triplett-King & Associates, Inc. (Rock Hill, SC) Swicegood, Dale (Lexington Residency) Accepted 1/23/2012

1/4/2012 DO00135 Jackson Taylor & Murphy Construction Co., Inc. Mitchell Bishop, PE Bridge No. 82 over Tuckaseegee River on SR 1002 - Deck Replacement 10+00.00 -L- existing bridge deck removal plan Taylor & Murphy Construction Co., Inc. Herrin, John (Taylor & Murphy) Request for additional Information

1/5/2012 C202829 Cumberland R. E. Goodson Connstruction Company, Inc. J. P Salisbury Part-Substructure for Bridges over Beaver Creek and All American Freeway on Left & Right Lanes Fayetteville Outer Loop 28+72.615 -L- anchor rod assemblies for prestress girders - 40 assemblies Structural Steel Products Corporation (Clayton) Mellione, Elizabeth (SSPC) On Hold may repalce rods with grout cans

1/5/2012 C201993 Wake Raleigh-Durham Roadbuilders G. C. Gibson, PE Bridge on CSX RR over WWF, adjacent to Old US 1 53+63.66 -RR- railroad bridge seat elevations at End Bent 1 and Pier 1 Raleigh-Durham Roadbuilders ? Hayes, Raymond (Mulkey) Accepted by Raymond Hayes 1/26/2012

1/5/2012 C201993 Wake Raleigh-Durham Roadbuilders G. C. Gibson, PE Bridge on CSX RR over WWF, adjacent to Old US 1 53+63.66 -RR- railroad bridge deck elastomeric joint sealants and primer PolySpec Hayes, Raymond (Mulkey) Accepted 1/18/2012

1/5/2012 C202829 Cumberland R. E. Goodson Connstruction Company, Inc. J. P Salisbury Bridge 375 over Tank Trail 3 on Loop 1B 12+10.929 -LP1B- anchor rod and sole plates for prestress girders - 48 rod assembies, 24 sole plates Structural Steel Products Corporation (Clayton) Mellione, Elizabeth (SSPC) Accepted as Noted 1/24/2012

1/5/2012 C202829 Cumberland R. E. Goodson Connstruction Company, Inc. J. P Salisbury Bridge 376 on Ramp 1BD over -COL1- 34+21.044 -RP1BD- anchor rod and sole plates for prestress girders - 188 rod assembies, 94 sole plates Structural Steel Products Corporation (Clayton) Mellione, Elizabeth (SSPC) Accepted as Noted 1/24/2012

1/5/2012 C202829 Cumberland R. E. Goodson Connstruction Company, Inc. J. P Salisbury Bridge No. 235 Widening over Beaver Creek on Left Lane All American Freeway; Bridge No. 4 Widening over Beaver Creek on Right Lane All American Freeway 19+34.958 -Y1- anchor rod and sole plates for prestress girders - 72 rod assembies, 36 sole plates Structural Steel Products Corporation (Clayton) Mellione, Elizabeth (SSPC) Accepted as Noted 1/24/2012

1/5/2012 C202829 Cumberland R. E. Goodson Connstruction Company, Inc. J. P Salisbury Part-Substructure for Bridge over Beaver Creek and All American Freeway on Collector 1 28+78.486 -COL1- anchor rod assemblies for prestress girders - 10 assemblies Structural Steel Products Corporation (Clayton) Mellione, Elizabeth (SSPC) On Hold may repalce rods with grout cans

1/5/2012 C202829 Cumberland R. E. Goodson Connstruction Company, Inc. J. P Salisbury Bridge 376 on Ramp 1BD over -COL1- 34+21.044 -RP1BD- intermediate steel channel diaphragm assembiles for 81-meter, single-span 1372 mm prestress girder bridge - 46 assemblies Structural Steel Products Corporation (Clayton) Mellione, Elizabeth (SSPC) Accepted 2/2/2012

1/5/2012 C202649 Buncombe Mountain Creek Contractors Inc. D. C. Hood, PE Replace Bridge No. 56 with three-sided culvert over Bill Moore Creek on SR 3439 (Reeves Cove Road) 11+86.23 -L- three-sided cast-in-place culvert - 28' span x 6' rise x 124' long Kenneth W, Frye, PE Hood, Cole (Asheville Residency) Accepted as Noted 2/6/2012

1/5/2012 C202438 Davidson Lee Construction Company of the Carolinas, Inc. D. L. Swicegood. PE Replace Bridge No. 158 over US 29 / 70 and I-85 Business on SR 1792 (Martin Luther King, Jr. Drive), in Thomasville 21+88.20 -L- false decking and girder bracing for traffic protection beneath two-span Type III girder structure Triplett-King & Associates, Inc. (Rock Hill, SC) Bishop, Ben (Lee) Accepted 1/12/2012

1/6/2012 C202628 Columbus Smith-Rowe, LLC W. R. Marsh, PE Replace Bridge No. 230038 over Gum Swamp on SR 1141 (Lebanon Church Road)
proposal to place Link Belt 218 Hylab 5 crawler crane on spans to drive piles, pour caps, set cored slabs STV and Smith-Rowe Fulp, Frank (Smith-Rowe) Accepted - See Letter 1/23/2012

1/6/2012 C202521 Mecklenburg Blythe Construction, Inc. R. W. Baucom, PE Bridge on Left Lane I-485 over SR 2459 (Eastfield Road) 1281+63.86 -L- casting drawings for 115-ft, single-span, 63-inch MBT girder bridge - 10 members - revised bed setups, dated Jan. 03 Cranston Engineering Group, PC / Prestress of the Carolinas Baucom, Richard (Matthews Residency) Accepted as Noted 1/19/2012

1/6/2012 C202521 Mecklenburg Blythe Construction, Inc. R. W. Baucom, PE Bridge on Right Lane I-485 over SR 2459 (Eastfield Road) 1281+63.86 -L- casting drawings for 115-ft, single-span, 63-inch MBT girder bridge - 10 members - revised bed setups, dated Jan. 03 Cranston Engineering Group, PC / Prestress of the Carolinas Baucom, Richard (Matthews Residency) Accepted as Noted 1/19/2012

1/6/2012 C201993 Wake Raleigh-Durham Roadbuilders G. C. Gibson, PE Western Wake Freeway 104+50 -L- retrofit of cantilever overhead sign assembly "R" Walpar, LLC (Birmingham, AL) Hayes, Raymond (Mulkey) Accepted 1/23/2012

1/6/2012 C202829 Cumberland R. E. Goodson Connstruction Company, Inc. J. P Salisbury Bridge 375 over Tank Trail 3 on Loop 1B 12+10.929 -LP1B- intermediate steel channel diaphragm assembiles for 39-meter, three-span, 1143 mm prestress girder bridge - 9 assemblies Structural Steel Products Corporation (Clayton) Mellione, Elizabeth (SSPC) Accepted 2/6/2012
1/9/2012 1/9/2012 C202555 Columbus BMCO Construction W. R. Marsh, PE Bridge No. 408 on NC 211 over US 74 / 76 27+00.00 -Y- proposal to place Grove RT745 hydraulic crane on deck to place concrete slope protection Lee Construction Company Bishop, Ben (Lee Construction) Accepted 1/10/2012

1/9/2012 C202622 Burke Dane Construction Company, Inc. B. C. Skeens, PE Morganton: Replace Bridge Nos. 140 & 142 on I-40 over NC 18 (Sterling Street)
four digital message support assemblies Brookfield Fabricating Corporation (Brookfield, MO) Aslami, Mohd (ITS) Accepted 2/1/2012

1/10/2012 C202622 Burke Dane Construction Company, Inc. B. C. Skeens, PE Morganton: Replace Culvert C139 with Bridge on I-40 over East Prong of Hunting Creek 48+87.35 -Y1- distribution sets of fabrication drawings for 172-ft.single-span plate girders, thirteen girder lines Stupp Bridge Company (St. Louis, MO) Stoltman, Joan (Stupp) Accepted 1/23/2012
1/10/2012 1/10/2012 DH00058 Randolph Thompson-Arthur J. B. Loflin, PE Replace Bridge No. 14 over Megee's Creek on SR 1163 (Tot Hill Farm Road) 10+36.00 -L- standard two-line elliptical aluminum bridge rail for two-span bridge Structural Materials, Inc. (Lenoir) Ingle, Mike (Thompson-Arthur) Accepted - See Letter 1/19/2012

1/10/2012 C202522 Cabarrus The Lane Construction Corporation D. C. Diggs, PE I-85 over Coddle Creek 379+98.50 -L- intermediate channel diaphrgm assembiles for 286-ft, two-span, 54-in. MBT girder bridge - 54 assemblies Structural Materials, Inc. (Lenoir) McManus, Andy (Residency) Accepted as Noted 1/26/2012

1/10/2012 C202522 Cabarrus The Lane Construction Corporation D. C. Diggs, PE I-85 over Rocky River 203+66.50 -L- intermediate channel diaphragm assemblies for 219-ft, three-span 54-in. MBT girder bridge - 63 assemblies Structural Materials, Inc. (Lenoir) McManus, Andy (Residency) Accepted 1/24/2012

1/10/2012 DO00143 Wake Carolina Bridge Company, Inc. C. D. Hinnant Bridge No. 571 EBL & WBL I-40 over South Saunders Street 82+42.41 -L- sole plates and anchor rod assemblies - 44 plates, 88 anchor rods Structural Steel Products Corporation (Clayton) Nickel, Richard (Carolina Bridge) Accepted as Noted 1/31/2012

1/11/2012 C201993 Wake Raleigh-Durham Roadbuilders G. C. Gibson, PE Western Wake Freeway
high mount light tower drilled pier foundations - structural design aspects - 25 locations Brooks-Berry-Haynie & Assoc., Inc. Hayes, Raymond (Mulkey) Accepted 1/14/2012

1/11/2012 C201993 Wake Raleigh-Durham Roadbuilders G. C. Gibson, PE Bridge on Old Holly Springs - Apex Road (SR 1153) over WWF 19+52.55 -Y3- standard two-line elliptical aluminum bridge rail for 204-ft two-span bridge Structural Engineering Solutions / Highway Materials Inc. Hayes, Raymond (Mulkey) Accepted as Noted 1/26/2012
1/12/2012 1/12/2012 C202622 Burke Dane Construction Company, Inc. B. C. Skeens, PE Culvert Extensions carring East Prong of Hunting Creek under NC 18 19+31.37 -L- temporary sheet pile shoring at reinforced concrete box culvert extension Triplett-King & Associates, Inc. Drinka, Kristin (Dane) Reviewed by Dean Hardister 1/12/2012

1/12/2012 C202621 Nash Barnhill Contracting Company W. S. Joyner, PE Rocky Mount: Bridge No. 179 on SR 1613 (North Winstead Avenue) over US 64 55+38.99 -L- revised girder details fabrication drawing for widening of 233-ft four-span plate girders - Span B, Line 6 Hirschfeld Industries - Bridge (for Nash Plant) Ramirez, Michelle (Hirschfeld) Accepted 1/26/2012

1/12/2012 C202599 Pasquotank & Camden Archer Western Contractors, LTD R. W. Midgett, Jr., PE Replace Bridge No. 19 over Pasquotank River on Eastbound US 158 - bascule span 15+25.75 -L1- (bascule span) bascule structural steel fabrication welding and inspection procedures and QA Manual Prospect Steel Company (Little Rock, AR) Midgett, R. W. (Elizabeth City Residency) under review

1/13/2012 C201993 Wake Raleigh-Durham Roadbuilders G. C. Gibson, PE Bridge on Kelly Road (SR 1163) over US 64 33+42.16 -Y18- structure drainage system for 217-ft two-span Type IV prestress girder bridge - Jan. re-submittal Southland Professional Engineers (Montgomery, AL) Hayes, Raymond (Mulkey) Accepted 1/24/2012

1/13/2012 C201993 Wake Raleigh-Durham Roadbuilders G. C. Gibson, PE Bridge on Old Holly Springs - Apex Road (SR 1153) over WWF 19+52.55 -Y3- deck overhang falsework for 204-ft, MBT girder, two-span bridge LPA Group (Raleigh) Hayes, Raymond (Mulkey) Accepted as Noted 1/26/2012

1/13/2012 C201993 Wake Raleigh-Durham Roadbuilders G. C. Gibson, PE Bridge on CSX RR over WWF, adjacent to Old US 1 53+63.66 -RR- structure drainage system for railway bridge - cast iron and ductile iron fittings and ductile iron pipe Southland Professional Engineers (Montgomery, AL) Hayes, Raymond (Mulkey) Accepted 1/31/2012
1/13/2012 1/13/2012 C202384 Brunswick Barnhill Contracting Company M. W. Currie, PE Bridges on I-140 SBL & NBL over wildlife crossing 2 265+98.50 -L- bridge deck overhang falsework for dual 107-ft, single-span MBT 63-inch prestress concrete girder bridges Sanford Contractors, Inc. (Sanford) Brown, Chris (Sanford) Accepted as Noted - See Letter 2/2/2012
1/13/2012 1/13/2012 C202323 Haywood R. E. Burns & Sons Company Inc. J. M. Bishop, PE Bridge No. 79 over West Fork Pigeon River on SR 1112 (Chambers Farm Lane) 11+30.50 -L- standard one-line elliptical aluminum bridge rail for 157-ft, single-span plate girder bridge Structural Materials, Inc. (Lenoir) Bishop, Mitchell (Whittier Residency) Accepted - See Letter 1/19/2012

1/13/2012 C202599 Pasquotank & Camden Archer Western Contractors, LTD R. W. Midgett, Jr., PE Replace Bridge No. 19 over Pasquotank River on Eastbound US 158 - bascule span 15+25.75 -L1- (bascule span) bascule mechanical - motor and machinery brake drawings Mondel Engineering Midgett, R. W. (Elizabeth City Residency) under review

1/13/2012 C202521 Mecklenburg Blythe Construction, Inc. R. W. Baucom, PE SR 2601 (Ridge Road) over Odell School Road -Y20- casting drawings for 155-ft, two-span, Type III prestress girder bridge - 10 members Cranston Engineering Group, PC / Prestress of the Carolinas Baucom, Richard (Matthews Residency) Accepted as Noted 1/19/2012

1/16/2012 DJ00050 Mecklenburg Dane Construction Inc. R. B. Graham, PE Replace Bridge No. 128 over Branch of McDowell Creek on SR 2131 (Bud Henderson Road) 12+00.00 standard two-line elliptical aluminum bridge rail Structural Materials, Inc. (Lenoir) Drinka, Kristin (Dane) Accepted as Noted 2/1/2012

1/16/2012 C202628 Columbus Smith-Rowe, LLC W. R. Marsh, PE Replace Bridge No. 230207 over Pine Log Swamp on SR 1585
27-inch box beam detensioning sequence Florence Concrete Products, Inc. (Sumter, SC) Parimuha, J. R. (Florence) Accepted - See Letter 2/1/2012
1/16/2012 1/16/2012 C202383 Rowan-Davidson Flatiron - Lane, A Joint Venture D. L. Waller, PE Bridge on I-85 NBL over Yadkin River and NSRR 883+15.59 -LREV- plate girder erection over RR and shoring towers - Jan. 16 response to comments Triplett-King & Associates, Inc. (Rock Hill, SC) Hajiadem, Rega (Flatiron-Lane) Accepted as Noted 1/23/2012
1/17/2012 1/17/2012 C202586 Nash PLT Construction Company, Inc. W. S. Joyner, PE SR 1604 (Hunter Hill Road) - MSE retaining wall No. 1, on outside soulder of Right Lane, west of End Bent 1, for Bridge over US 301 44+50 to 49+43 -L- RECo MSE retaining wall on outside shoulder - 497 feet long - Jan. 17 revision Reinforced Earth Company (Vienna, VA) McKeel, Chris (PTL) Accepted 1/27/2012

1/17/2012 C202523 Mecklenburg The Lane Construction Corporation D. C. Diggs, PE eight structures on I-485 / I-85 Charlotte Eastern Outer Loop Interchange
laminated elastomeric bearing pads for bridge girders - 208 pads Scougal Rubber Corp. White, Marty (Albemarle Residency) Accepted as Noted 1/23/2012

1/17/2012 C201993 Wake Raleigh-Durham Roadbuilders G. C. Gibson, PE Bridge on CSX RR over WWF, adjacent to Old US 1 53+63.66 -RR- waterproofing, dampproofing materials Carlisle Syntec Hayes, Raymond (Mulkey) Accepted 1/25/2012
1/17/2012 1/17/2012 C202586 Nash PLT Construction Company, Inc. W. S. Joyner, PE SR 1604 (Hunter Hill Road) - MSE retaining wall No. 2, on outside shoulder of Left Lane, east of End Bent 2, for Bridge over US 301 52+08 to 58+00 -L- RECo MSE retaining wall on outside shoulder - 592 feet long - Jan. 17 revision The Reinforced Earth Company (Vienna, VA) McKeel, Chris (PLT) Accepted 1/27/2012

1/17/2012 C202523 Mecklenburg The Lane Construction Corporation D. C. Diggs, PE five structures on I-485 / I-85 Charlotte Eastern Outer Loop Interchange
sole plate and anchor rod assemblies Structural Materials Inc. (Lenoir) White, Marty (Albemarle Residency) Accepted 1/20/2012

1/17/2012 C202521 Mecklenburg Blythe Construction, Inc. R. W. Baucom, PE Bridges on Left & Right Lanes I-485 over Tributary to Stony Creek 1468+19.00 -L- fabricated metal stay-in-place deck forms for dual three-span MBT girder bridges Topikal (Atlanta) Baucom, Richard (Matthews Residency) Accepted as Noted 1/30/2012

1/18/2012 C202521 Mecklenburg Blythe Construction, Inc. R. W. Baucom, PE SR 2601 (Ridge Road) over Odell School Road -Y20- RECo MSE retaining wall at End Bents 1 & 2 (MSE Wall 19 & MSE Wall 20) The Reinforced Earth Company (Vienna, VA) Baucom, Richard (Matthews Residency) Accepted 2/1/2012

1/18/2012 C201993 Wake Raleigh-Durham Roadbuilders G. C. Gibson, PE Western Wake Freeway
open road tolling - 20 overhead sign support assemblies: metalwork for truss assemblies mounted on concrete columns - Jan 18 Revision Walpar, LLC (Birmingham, AL) Hayes, Raymond (Mulkey) Our review not req'd per Raymond Hayes 1/27/2012
1/19/2012 1/19/2012 DO00135 Jackson Taylor & Murphy Construction Co., Inc. Mitchell Bishop, PE Bridge No. 82 over Tuckaseegee River on SR 1002 - Deck Replacement 10+00.00 -L- fabricated metal stay-in-place forms for four-span deck replacement bridge SIP of Delaware (Gadsden, AL) Herrin, John (Taylor & Murphy) Accepted as Noted - See Letter 1/24/2012
1/19/2012 1/19/2012 C202599 Pasquotank & Camden Archer Western Contractors, LTD R. W. Midgett, Jr., PE Replace Bridge No. 19 over Pasquotank River on Eastbound US 158 - bascule span 15+25.75 -L1- (bascule span) bascule mechanical - north and south trunnion shafts, turned bolts, pinion shafts, floating shafts Steward Machine Co., Inc. (Birmingham, AL) Midgett, R. W. (Elizabeth City Residency) under review
1/19/2012 1/19/2012 DO00135 Jackson Taylor & Murphy Construction Co., Inc. Mitchell Bishop, PE Bridge No. 82 over Tuckaseegee River on SR 1002 - Deck Replacement 10+00.00 -L- anchor rod assemblies, coupler nuts, sole plates, drain brackets Structural Steel Products Corporation (Clayton) Herrin, John (Taylor & Murphy) Accepted as Noted - See Letter 2/6/2012
1/19/2012 1/19/2012 C202383 Rowan-Davidson Flatiron - Lane, A Joint Venture D. L. Waller, PE Bridge on US 29 / 70 over Yadkin River 35+39.48 -SBL- anchor rod assemblies (8) and sole plates (4) for prestress concrete girders Structural Materials, Inc. (Lenoir) Price, Adrian (Flatiron-Lane) Accepted - See Letter 1/25/2012

1/19/2012 C202523 Mecklenburg The Lane Construction Corporation D. C. Diggs, PE I-485 / I-85 Charlotte Eastern Outer Loop Interchange
single-arm lighting standard Atlantic Technical Sales / Valmont Chan, Paul (Lighting & Electrical) Reviewed 1/26/2012
1/17/2012 1/19/2012 DO00130 Haywood Miller Engineering Company, Inc. J. M. Bishop, PE Replace Bridge No. 283 over Welsey's Creek on SR 1334 12+91.00 -L- temporary detour bridge - preliminary proposal Miller Engineering Company (Marion) Williamson, Travis (Whittier Residency) Comments sent to RE 1/27/2012
1/19/2012 1/19/2012 C202599 Pasquotank & Camden Archer Western Contractors, LTD R. W. Midgett, Jr., PE Replace Bridge No. 19 over Pasquotank River on Eastbound US 158 - bascule span 15+25.75 -L1- (bascule span) bascule span: 33-inch box beams over counterweight - 8 members - Jan 17 Revision Bayshore Concrete Products (Cape Charles) Midgett, R. W. (Elizabeth City Residency) Accepted - See Letter 2/1/2012
1/20/2012 1/20/2012 C202383 Rowan-Davidson Flatiron - Lane, A Joint Venture D. L. Waller, PE Bridge on I-85 NBL over Yadkin River and NSRR 883+15.59 -LREV- deck overhang falsework for 2,903-ft twenty-one span bridge - Span U plate girders only - Jan 13 Revision Dave Wissell, PE (Huntersville) Hajiadem, Rega (Flatiron-Lane) Accepted as Noted 2/7/2012

1/20/2012 C202829 Cumberland R. E. Goodson Connstruction Company, Inc. J. P Salisbury Superstructure of Bridge 380 on Ramp 1BD over Bragg Boulevard (NC24) 41+33.963 -RP1BD- distribution sets of fabrication drawings for 46.5-meter single-span plate girders, six girder lines Hirschfeld Industries - Bridge (for Nash-Colfax Plant) Ramirez, Michelle (Hirschfeld) Accepted 2/1/2012

1/23/2012 C202522 Cabarrus The Lane Construction Corporation D. C. Diggs, PE I-85 over Coddle Creek 379+98.50 -L- laminated elastomeric bearing pads for bridge girders - 168 pads Scougal Rubber Corp. McManus, Andy (Residency) Returned for Corrections 2/2/2012

1/23/2012 C202522 Cabarrus The Lane Construction Corporation D. C. Diggs, PE I-85 over Rocky River 203+66.50 -L- laminated elastomeric bearing pads for bridge girders - 138 pads Scougal Rubber Corp. McManus, Andy (Residency) Returned for Corrections 2/2/2012

1/23/2012 C202522 Cabarrus The Lane Construction Corporation D. C. Diggs, PE NC 73 (Davidson Highway) over I-85 52+58.76 -Y6- laminated elastomeric bearing pads for bridge girders - 48 pads Scougal Rubber Corp. McManus, Andy (Residency) Returned for Corrections 2/2/2012
1/20/2012 1/23/2012 C202599 Pasquotank & Camden Archer Western Contractors, LTD R. W. Midgett, Jr., PE Replace Bridge No. 19 over Pasquotank River on Eastbound US 158 - new bascule span; Existing Bridge No. 27 over Pasquotank River on Westbound US 158 - existing bascule span 15+25.75 -L1- (bascule span) bascule electrical - grounding system product data - Burndy Hyground irreversible compression system Dorey Electric Company (Norfolk, VA) Midgett, R. W. (Elizabeth City Residency) under review

1/23/2012 DN00036 Haywood Smith-Rowe, LLC
US 74 near Exit 105 west of Clyde
butterfly-type digital message overhead sign support assembly, footing Brookfield Fabircating Corporation (Brookfield, MO) Yow, Sherry (ITS) under review

1/23/2012 C201993 Wake Raleigh-Durham Roadbuilders G. C. Gibson, PE Western Wake Freeway
open road tolling gantry zinc cladding - eight overhead box assembiles Walpar, LLC (Birmingham, AL) Hayes, Raymond (Mulkey) Accepted 1/30/2012

1/23/2012 C202621 Nash Barnhill Contracting Company W. S. Joyner, PE Rocky Mount: SR 1613 (North Winstead Avenue) from SR 1770 (Sunset Avenue) to SR 1604 (Hunter Hill Road)
two cantilever-type overhead sign support assemblies Brookfield Fabircating Corporation (Brookfield, MO) Joyner, W. S. (Nashville Residency) under review
1/20/2012 1/23/2012 C202663 Moore S. T. Wooten Corporation M. G. Phillips NC 211 from NC 73 in West End to the traffic circle in Pinehurst - shoring wall no. 1 & 2 278+26.06 -LREV3- temporary shoring at existing culvert - 70-ft long tied -back soldier pile w/ timber lagging wall Kenneth W. Frye, PE (Fallston, NC) Dietrich, Jim (Aberdeen Residency) Comments to sent to Charles Cove 2/8/2012

1/23/2012 C202522 Cabarrus The Lane Construction Corporation D. C. Diggs, PE Poplar Tent Road over I-85 87+58.31 -Y6- laminated elastomeric bearing pads for bridge girders - 24 pads Scougal Rubber Corp. McManus, Andy (Residency) Returned for Corrections 2/2/2012

1/24/2012
Stokes Smith-Rowe, Inc.
Replace Bridge No. 13 with three-sided culvert over Little Yadkin River on SR 1136, north of Chestnut Grove 10+15.80 -EL- precast Bebo twin-leaf arch culvert - 71'-9" span x 20' rise x 54' length - second submittal Contech Arch Engineering Beatty, Chris (Contech) (via Farzin Asefnia) Accepted 1/30/2012

1/24/2012 C202521 Mecklenburg Blythe Construction, Inc. R. W. Baucom, PE Bridge on Left Lane I-485 over Tributary to Stony Creek 1468+19.00 -L- casting drawings for three-span 72-inch MBT girders - 30 members Cranston Engineering Group, PC / Prestress of the Carolinas Baucom, Richard (Matthews Residency) Accepted as Noted 2/3/2012

1/24/2012 C202829 Cumberland R. E. Goodson Connstruction Company, Inc. J. P Salisbury Superstructure of Bridge 380 on Ramp 1BD over Bragg Boulevard (NC24) 41+33.963 -RP1BD- two revised drawings for distribution sets of fabrication drawings for 46.5-meter, single-span plate girders, six girder lines - Jan 19 revision Hirschfeld Industries - Bridge (for Nash-Colfax Plant) Ramirez, Michelle (Hirschfeld) Accepted 2/1/2012

1/24/2012 C202521 Mecklenburg Blythe Construction, Inc. R. W. Baucom, PE Bridge on Right Lane I-485 over Tributary to Stony Creek 1468+19.00 -L- casting drawings for three-span 72-inch MBT girders - 30 members Cranston Engineering Group, PC / Prestress of the Carolinas Baucom, Richard (Matthews Residency) Accepted as Noted 2/3/2012
1/24/2012 1/24/2012 C202382 Davidson Balfour Beatty - Austin Bridge Joint Venture D. L. Swicegood, PE Reconstruction of I-85 - retaining wall adjacent to Cemetery 1015.96.30 -L- soil nail retaining wall - 48-feet long Haward Baker (Alphretta, GA) Swicegood, Dale (Lexington Residency) Comments sents to Dean Hardister 2/3/2012

1/24/2012 na Guilford Blythe Construction, Inc. D. L. Ferguson Replace Bridge No. 97 over Horse Pen Creek on Ballinger Road 15+96.00 -L- standard two-line elliptical aluminum bridge rail for 87-foot single-span box beam bridge Structural Materials, Inc. (Lenoir) Ferguson, Darrell (Greensboro Residency) Accepted as Noted 2/6/2012

1/25/2012 DO00143 Wake Carolina Bridge Company, Inc. C. D. Hinnant Bridge No. 571 EBL & WBL I-40 over South Saunders Street 82+42.41 -L- substructure rehab. - bridge span jacking plans Alpha & Omega Group (Raleigh) Larson, Rob (Alpha & Omega) under review

1/26/2012 C202829 Cumberland R. E. Goodson Connstruction Company, Inc. J. P Salisbury Bridge over Beaver Creek on Ramp 1A 14+60.500 -RP1A- approval sets of fabrication drawings for 205-meter, five-span plate girder bridge - Units 1 & 2 Hirschfeld Industries - Bridge (for Nash Plant) Ramirez, Michelle (Hirschfeld) under review

1/26/2012 C202438 Davidson Lee Construction Company of the Carolinas, Inc. D. L. Swicegood. PE Replace Bridge No. 158 over US 29 / 70 and I-85 Business on SR 1792 (Martin Luther King, Jr. Drive), in Thomasville 21+88.20 -L- fabricated metal stay-in-place forms for 177-ft, two-span, Type III prestress girder bridge Metal Dek Group (Columbia, SC) Bishop, Ben (Lee) Accepted as Noted - See Letter 2/14/2012

1/26/2012 C202829 Cumberland R. E. Goodson Connstruction Company, Inc. J. P Salisbury Bridge over Beaver Creek and All Americal Freeway on Collector 2 28+66.746 -COL2- approval sets of fabrication drawings for 185-meter, five-span plate girder bridge Hirschfeld Industries - Bridge (for Colfax Plant) Ramirez, Michelle (Hirschfeld) Returned for Corrections 2/8/2012
2/1/2012 1/27/2012 C202599 Pasquotank & Camden Archer Western Contractors, LTD R. W. Midgett, Jr., PE Replace Bridge No. 19 over Pasquotank River on Eastbound US 158 - new bascule span 15+25.75 -L1- (bascule span) bascule span structural steel fabrication drawings - Jan. 20 revision to General Notes drawing Prospect Steel Company (Little Rock, AR) Midgett, R. W. (Elizabeth City Residency) Accepted as Noted 2/13/2012

1/27/2012 DO00143 Wake Carolina Bridge Company, Inc. C. D. Hinnant Bridge No. 571 EBL & WBL I-40 over South Saunders Street 82+42.41 -L- substructure rehab. - scaffolding and traffic protection barrier for bent seat repair Alpha & Omega Group (Raleigh) Larson, Rob (Alpha & Omega) Accepted 2/9/2012

1/30/2012 DO00135 Jackson Taylor & Murphy Construction Co., Inc. Mitchell Bishop, PE Bridge No. 82 over Tuckaseegee River on SR 1002 - Deck Replacement 10+00.00 -L- fabricated metal stay-in-place forms for four-span deck replacement bridge - Jan 23 Revision SIP of Delaware (Gadsden, AL) Herrin, John (Taylor & Murphy) Accepted as Noted - See Letter 2/8/2012
1/3/2012 1/30/2012 DG00085 Caswell Gulf Coast Contracting, LLC (Holiday, FL) B. L. Norris, Jr., PE Bridge Nos. 49, 50, 118 over US 29, in northwest county
cleaning and painting of ends of weathering steel beams - containment plans J. L Arnold Engineering, Inc. (St. Petersburg, FL) interoffice mail under review

1/31/2012 DO00144 Watauga R. E. Burns and Sons Co. D. W. Eller (Boone) Partial Replacment of Bridge No. 67 over Flannery Fork Creek on US 221 / US 321 54+86.50 -L- approval sets of fabrication drawings for 112-ft, three-span rolled beam partial bridge replacement Hirschfeld Industries - Bridge (for Abingdon-Colfax Plant) Ramirez, Michelle (Hirschfeld) Accepted 2/8/2012
1/31/2012 1/31/2012 C202647 Onslow S. T. Wooten Corporation David A. Candela, PE Bridge on SR 1702 (White Street Extension) over US 17 in Jacksonville 21+47.74 -L- fabricated metal stay-in-place forms for 222-ft two-span 63-inch MBT girder bridge SIP of Delaware (Gadsden, AL) Knoll, Joey (Wooten) under review

2/1/2012 C201993 Wake Raleigh-Durham Roadbuilders G. C. Gibson, PE various locations on Western Wake Freeway
100-ft high mount light poles - metalwork and foundation design Union Metal Corporation Hayes, Raymond (Mulkey) RFC-Needs PE seal 2/13/2012
1/27/2012 2/1/2012 C202558 Onslow Balfour Beatty Infrastructure, Inc. D. A. Candela, PE Bridges on SBL & NBL Ramp Western Parkway over Country Club Road 22+41.58 -SBL Ramp-; 22+34.67 -NBL Ramp- plate girder erection plan for dual single-span bridges Balfour Beatty Infrastructure Inc. Gregg, Preston (Jacksonville Residency) under review

2/1/2012 C202523 Mecklenburg The Lane Construction Corporation D. C. Diggs, PE WBL I-485 over Ramp H 82+81.21 -L- strand stressing calculations and detensioning sequence, embeds, shipping diagram for one-span 72-in. MBT girder bridge - 6 members Cranston Engineering Group, PC / Prestress of the Carolinas White, Marty (Albemarle Residency) under review

2/1/2012 C202523 Mecklenburg The Lane Construction Corporation D. C. Diggs, PE EBL I-485 over Ramp H 82+81.21 -L- strand stressing calculations and detensioning sequence, embeds, shipping diagram for one-span 72-in. MBT girder bridge - 6 members Cranston Engineering Group, PC / Prestress of the Carolinas White, Marty (Albemarle Residency) under review
2/1/2012 2/1/2012 C202556 Macon C. W. Matthews Contracting Company, Inc Mitchell Bishop, PE Bridge No. 368 over Little Tennessee River on New Location, at Franklin 33+30.00 -L- sandwich-gland type deck expansion joint assembly plus barrier rail cover plates for 530-ft, three-span bridge - two assemblies - Jan. 17 Revision Tim Schmitz Engineering Nadolski, Mike (C. W. Matthews) Accepted as Noted - See Letter 2/10/2012
2/1/2012 2/2/2012 C202599 Pasquotank & Camden Archer Western Contractors, LTD R. W. Midgett, Jr., PE Replace Bridge No. 19 over Pasquotank River on Eastbound US 158 - new bascule span; Existing Bridge No. 27 over Pasquotank River on Westbound US 158 - existing bascule span 15+25.75 -L1- (bascule span) bascule mechanical - machinery couplings, rod ends, sprockets, roller chain, gear reducers, oil seals Steward Machine Co., Inc. (Birmingham, AL) Midgett, R. W. (Elizabeth City Residency) under review
2/1/2012 2/2/2012 C202107 Yancy Taylor & Murphy Const. and Young & McQueen Grading R. J. McKinney, PE Bridge No. 9 widening on US 19 over Cane River 223+53.200 -L- proposal to place Grove RT 750 & Grove RT 528 truck cranes on bridge deck to set prestress giders in Stage 2 Taylor & Murphy Construction Co. McKinney, Randy (Weaverville Residency) under review
2/1/2012 2/2/2012 C202599 Pasquotank & Camden Archer Western Contractors, LTD R. W. Midgett, Jr., PE Existing Bridge No. 27 over Pasquotank River on Westbound US 158 - existing bascule span 15+25.75 -L1- (bascule span) bascule mechanical - motor and machinery brakes Mondel Engineering Midgett, R. W. (Elizabeth City Residency) under review

2/2/2012 C202625 Northhampton Carolina Bridge Company, Inc. S. L. Emory, PE Replace Bridge No. 27 over Bridgers Creek on SR 1108, south of Rich Square
proposal to place Link Belt 138 H on cored slab bridge to set cored slabs in adjacent spans Carolina Bridge Company Nickel, Dan (Carolina Bridge) under review
2/1/2012 2/2/2012 C202599 Pasquotank & Camden Archer Western Contractors, LTD R. W. Midgett, Jr., PE Replace Bridge No. 19 over Pasquotank River on Eastbound US 158 - new bascule span 15+25.75 -L1- (bascule span) bascule mechanical - trunnion hub and rack assembly Steward Machine Co., Inc. (Birmingham, AL) Midgett, R. W. (Elizabeth City Residency) under review
2/2/2012 2/2/2012 C202599 Pasquotank & Camden Archer Western Contractors, LTD R. W. Midgett, Jr., PE Replace Bridge No. 19 over Pasquotank River on Eastbound US 158 - new bascule span 15+25.75 -L1- (bascule span) bascule mechanical - trunnion bearing cap, base & pedestal assembly Steward Machine Co., Inc. (Birmingham, AL) Midgett, R. W. (Elizabeth City Residency) under review

2/2/2012 C202621 Nash Barnhill Contracting Company W. S. Joyner, PE Rocky Mount: Bridge No. 179 on SR 1613 (North Winstead Avenue) over US 64 55+38.99 -L- revised General Notes fabrication drawing for widening of 233-ft four-span plate girders Hirschfeld Industries - Bridge (for Nash Plant) Ramirez, Michelle (Hirschfeld) Accepted 2/7/2012
2/1/2012 2/2/2012 C202382 Davidson Balfour Beatty - Austin Bridge Joint Venture D. L. Swicegood, PE Replace Bridge No. 112 on I-85 with RCBC carrying South Potts Creek 1036+32.00 -L- temporary sheet pile shoring with tieback anchors at five-barrel box culvert Florence & Hutcheson (Raleigh) Swicegood, Dale (via D. Hardister) under review

2/2/2012 C201993 Wake Raleigh-Durham Roadbuilders G. C. Gibson, PE Bridge on CSX RR over WWF, adjacent to Old US 1 53+63.66 -RR- railroad bridge deck tubular handrail - revised GatorDock (Sanford, FL) Hayes, Raymond (Mulkey) under review

2/3/2012 C202829 Cumberland R. E. Goodson Connstruction Company, Inc. J. P Salisbury Bridge 371 on Flyover over Beaver Creek, Fayetteville Outer Loop and All American Freeway 28+72.626 -RP1BD- mass concrete analysis and temperature control plan for bent footings, columns and caps Triplett-King & Assoc., Inc. (Charlotte) Lucas, Steve (Fayetteville Residency) under review
2/3/2012 2/3/2012 DO00143 Wake Carolina Bridge Company, Inc. C. D. Hinnant Bridge No. 571 EBL & WBL I-40 over South Saunders Street 82+42.41 -L- bridge girder painting platform The David R. Schmidt Company, Inc. (Forest Hill, MD) Nickel, Richard (Carolina Bridge) under review

2/3/2012 C202684 Cumberland Barnhill Contracting Company R. K. Wise, PE Bridge on -CDR- over NC 210 / NC 87 & CSX RR 66+11.952 -CDR- distribution sets of fabrication drawings for 78.3-meter, two-span plate girders, six girder lines Augusta Iron & Steel Works, Inc. (Augusta, GA) Johnt, James W. (AISW) Accepted 2/7/2012

2/3/2012 C202521 Mecklenburg Blythe Construction, Inc. R. W. Baucom, PE Bridge on Prosperity Ridge Road (-Y17B-) over I-485 (-L-) 79+81.56 -Y17B- deck overhang falsework for 184-ft, two-span, Type IV PCG bridge - Jan 31 Revision Dave Wissell, PE (Huntersville) Baucom, Richard W. (Matthews Residency) under review

2/3/2012 C202521 Mecklenburg Blythe Construction, Inc. R. W. Baucom, PE Bridge on Prosperity Church Road (-Y17A-) over I-485 (-L-) 49+45.34 -Y17A- deck overhang falsework for 184-ft, two-span, Type IV PCG bridge - Jan 31 Resubmittal Dave Wissell, PE (Huntersville) Baucom, Richard W. (Matthews Residency) under review

2/3/2012 C202521 Mecklenburg Blythe Construction, Inc. R. W. Baucom, PE Bridge on Loganville Road (-Y17-) over I-485 61+94.75 -Y17- deck overhang falsework for 184-ft, two-span, Type IV PCG girder bridge - Jan 31 Resubmittal Dave Wissell, PE (Huntersville) Baucom, R. W. (Matthews Residency)

2/3/2012 2/3/2012 C202556 Macon C. W. Matthews Contracting Company, Inc Mitchell Bishop, PE Bridge No. 368 over Little Tennessee River on New Location, at Franklin 33+30.00 -L- false decking for traffic protection beneath portions of 530-ft three-span plate girder bridge Structural Engineering Soluctions, LLC (Smyrna, GA) Nadolski, Mike (C. W. Matthews) Accepted 2/8/2012

2/3/2012 C202829 Cumberland R. E. Goodson Connstruction Company, Inc. J. P Salisbury Bridge over Beaver Creek on Ramp 1A 14+60.500 -RP1A- mass concrete analysis and temperature control plan for bent footings, columns and caps Triplett-King & Assoc., Inc. (Charlotte) Lucas, Steve (Fayetteville Residency) under review
2/3/2012 2/3/2012 C202556 Macon C. W. Matthews Contracting Company, Inc Mitchell Bishop, PE Bridge No. 368 over Little Tennessee River on New Location, at Franklin 33+30.00 -L- deck overhang falsework for 530-ft three-span plate girder bridge - revised submittal Structural Engineering Solutions, LLC (Smyrna, GA) Nadolski, Mike (C. W. Matthews) Accepted as Noted - See Letter 2/8/2012
2/3/2012 2/3/2012 C202621 Nash Barnhill Contracting Company W. S. Joyner, PE Rocky Mount: Bridge No. 285 on SR 1613 (North Winstead Avenue) over Stoney Creek; Bridge No. 179 on SR 1613 (North Winstead Avenue) over US 64 27+87.83 -L-; 55+38.99 -L- materials approval request: Metazeal, Eva-Pox Bonder 1 Chase Construction Products Fay, Janet (Intercoastal) Reviewed 2/13/2012
2/3/2012 2/6/2012 C202599 Pasquotank & Camden Archer Western Contractors, LTD R. W. Midgett, Jr., PE Replace Bridge No. 19 over Pasquotank River on Eastbound US 158 - new bascule span 15+25.75 -L1- (bascule span) bascule mechanical - rack segment, rack support, rack assembly Steward Machine Co., Inc. (Birmingham, AL) Midgett, R. W. (Elizabeth City Residency) under review
2/6/2012 2/6/2012 C202383 Rowan-Davidson Flatiron - Lane, A Joint Venture D. L. Waller, PE Bridge on I-85 SBL over Yadkin River and NSRR 882+88.07 -LREV- 77-inch MBT girder casting drawings - Spans Q thru T - 28 members Coastal Precast Systems (Chesapeake, VA) Price, Adrian (Flatiron-Lane) under review

2/6/2012 C201993 Wake Raleigh-Durham Roadbuilders G. C. Gibson, PE Western Wake Freeway structure at tower wall 89+75 -LA- RECo MSE retaining wall - Plan, Elevation, Sections + Panel Casting Drawings The Reinforced Earth Company (Vienna, VA) Hayes, Raymond (Mulkey) under review

2/7/2012 C202323 Haywood R. E. Burns & Sons Company Inc. J. M. Bishop, PE Bridge No. 79 over West Fork Pigeon River on SR 1112 (Chambers Farm Lane) 11+30.50 -L- approval sets of fabrication drawings for 157-ft, single-span plate girder bridge - 7 girder lines Augusta Iron & Steel Works, Inc. (Augusta, GA) Johnt, James W. (AISW) under review

2/7/2012 DO00144 Watauga R. E. Burns and Sons Co. D. W. Eller (Boone) Partial Replacment of Bridge No. 67 over Flannery Fork Creek on US 221 / US 321 54+86.50 -L- approval sets of fabrication drawings for 112-ft, three-span rolled beam partial bridge replacement Hirschfeld Industries - Bridge (for Abingdon-Colfax Plant) Ramirez, Michelle (Hirschfeld) under review
2/7/2012 2/7/2012 C202384 Brunswick Barnhill Contracting Company M. W. Currie, PE replace reinforced concrete box culvert with three 66-inch RCP carrying Tributary to Morgan Creek under US 17 101+47 -Y1- sheet pile shoring with double wale rings - 32' x 24' x 11.0' Sanford Contractors, Inc. (Sanford) Gattis, Randall (Sanford) under review
2/7/2012 2/7/2012 C202554 Swain E. R. Snell Contractor, Inc. (Snellville, GA) W. T. Anderson Replace Bridge No. 3 over Nantahala River on US 19-74 16+39.20 -L- standard two-line elliptical aluminum bridge rail for 160-ft, three-span bridge - Jan. 5 Revision Structural Engineering Solutions, LLC/Highway Materials, Inc Clower, Tom (Snell) under review

2/8/2012 C202829 Cumberland R. E. Goodson Connstruction Company, Inc. J. P Salisbury reinforced concrete box culvert carrying Big Branch Creek under Fayetteville Outer Loop 22+70.320 -L- roof slab falsework for double RCBC w/ 20-inch roof thickness, using Spanall horizontal shoring trusses Harsco Infrastructure (Houston, TX) Lucas, Steve (Fayetteville Residency) under review
2/8/2012 2/8/2012 C202586 Nash PLT Construction Company, Inc. W. S. Joyner, PE Replace Bridge No. 181 on Right Lane SR 1604 (Hunter Hill Road) over US 301; Bridge on Left Lane SR 1604 (Hunter Hill Road) over US 301 50+77.00 -L- pot bearings for dual 217-ft. two-span plate girder bridges - 8 assemblies The D. S. Brown Company (North Baltimore, OH) McKeel, Chris (PLT) under review

2/8/2012 C202522 Cabarrus The Lane Construction Corporation D. C. Diggs, PE Poplar Tent Road over I-85 87+58.31 -Y6- laminated elastomeric bearing pads for bridge girders - 24 pads - Revised drawings Scougal Rubber Corp. (McCarran, NV) McManus, Andy (Residency) Accepted 2/13/2012

2/8/2012 C202522 Cabarrus The Lane Construction Corporation D. C. Diggs, PE NC 73 (Davidson Highway) over I-85 52+58.76 -Y6- laminated elastomeric bearing pads for bridge girders - 48 pads - Revised drawings Scougal Rubber Corp. (McCarran, NV) McManus, Andy (Residency) Accepted 2/13/2012

2/8/2012 C202522 Cabarrus The Lane Construction Corporation D. C. Diggs, PE I-85 over Coddle Creek 379+98.50 -L- laminated elastomeric bearing pads for bridge girders - 120 pads - Revised drawings Scougal Rubber Corp. (McCarran, NV) McManus, Andy (Residency) Accepted 2/13/2012

2/8/2012 C202522 Cabarrus The Lane Construction Corporation D. C. Diggs, PE I-85 over Rocky River 203+66.50 -L- laminated elastomeric bearing pads for bridge girders - 138 pads - Revised drawings Scougal Rubber Corp. (McCarran, NV) McManus, Andy (Residency) Accepted 2/13/2012

2/9/2012 C202601 Forsyth Blythe Development Company D. L Swicegood, PE Replace Bridge No. 368 over I-40 Business on SR 2643 (Salisbury Street) in Kernersville 17+96.35 -L- intermediate K-frame diaphragm assemblies for 203-ft, two-span 63-inch MBT girder bridge - 8 assemblies Structural Steel Products Corporation (Clayton) Kirkman, Richard (Blythe Development) under review

2/9/2012 C201993 Wake Raleigh-Durham Roadbuilders G. C. Gibson, PE Bridge on Old Holly Springs - Apex Road (SR 1153) over WWF 19+52.55 -Y3- deck overhang falsework for 204-ft, MBT girder, two-span bridge - Feb 09 Revision LPA Group (Raleigh) Hayes, Raymond (Mulkey) under review

2/9/2012 C202382 Davidson Balfour Beatty - Austin Bridge Joint Venture D. L. Swicegood, PE Reconstruction of I-85 - retaining wall adjacent to Cemetery 1015.96.30 -L- soil nail retaining wall - 48-feet long - revised cast-in-place facing Florence & Hutcheson (Raleigh) Hardister, Dean (Geotech Engineering) received

2/10/2012 DL00015 Iredell TCB Builders, LLC J. E. Parker, PE Replace Bridge No. 334 over Dutchmans Creek on SR 2136 (Mt. Bethel Road) 10+52.50 -L- proposal to place Terex HC-80 crawler crane on cored slab bridge to set cored slabs in adjacent span TCB Builders, LLC Brown, Phil (TCB Builders) under review
2/10/2012 2/10/2012 C202438 Davidson Lee Construction Company of the Carolinas, Inc. D. L. Swicegood. PE Replace Bridge No. 158 over US 29 / 70 and I-85 Business on SR 1792 (Martin Luther King, Jr. Drive), in Thomasville 21+88.20 -L- shoring for bent footings in median - sheet piles with wales Triplett-King & Associates, Inc. (Charlotte) Swicegood, Dale (lexington Residency) under review

2/10/2012 C201965 Lenoir PLT Construction Company, Inc. W. C. Kincannon, PE Left & Right Lane Bridges on Crescent Road over NC Railroad 85+98.30 -L- plate girder erection procedure and shoring towers - February 2012 revised procedure and revised temporary bent Tometich Engineering, Inc (Urbandale, Iowa) Hollis, Joe (United) under review

2/13/2012 C202601 Forsyth Blythe Development Company D. L Swicegood, PE Replace Bridge No. 368 over I-40 Business on SR 2643 (Salisbury Street) in Kernersville 17+96.35 -L- sole plates and anchor rod assemblies for ten prestress girders Structural Materials Inc. (Lenoir) Stough, Mo (Blythe Development) under review

2/13/2012 C202599 Pasquotank & Camden Archer Western Contractors, LTD R. W. Midgett, Jr., PE Replace Bridge No. 19 over Pasquotank River on Eastbound US 158 - new bascule span 15+25.75 -L1- (bascule span) bascule mechanical - centering device & span opening indicator Steward Machine Co., Inc. (Birmingham, AL) Midgett, R. W. (Elizabeth City Residency) under review

2/13/2012 C202599 Pasquotank & Camden Archer Western Contractors, LTD R. W. Midgett, Jr., PE Replace Bridge No. 19 over Pasquotank River on Eastbound US 158 - new bascule span 15+25.75 -L1- (bascule span) bascule mechanical - Earle pillow block (outline drawing) Steward Machine Co., Inc. (Birmingham, AL) Midgett, R. W. (Elizabeth City Residency) under review

2/13/2012 C202599 Pasquotank & Camden Archer Western Contractors, LTD R. W. Midgett, Jr., PE Replace Bridge No. 19 over Pasquotank River on Eastbound US 158 - new bascule span 15+25.75 -L1- (bascule span) bascule electrical - panelboards, transformers, circuit breaker, surge arrestor, disconnect switch Dorey Electric Company (Norfolk, VA) Midgett, R. W. (Elizabeth City Residency) under review

2/13/2012 C201965 Lenoir PLT Construction Company, Inc. W. C. Kincannon, PE Left Lane Bridge on Crescent Road over NC Railroad 85+98.30 -L- support point locations for heat curving - sweep correction, Span C Structural Steel Products Corp. (Clayton) Stratton, Jon (SSPC) via Steve Walton under review
2/13/2012 2/13/2012 C202472 Randolph Sharpe Brothers, A Div. of Vecellio & Grogan, Inc. J. B. Loflin, PE US-220 (Future I-73/74) from south of NC-134 and US-220 Bus. to north of SR 1462 (Park Drive Extension) in Asheboro; HM-7 & HM-8
high mount light tower spread footing design - 60-ft height Atlantic Technical Sales (Chantilly, VA) Williamson, Frankie (Asheboro Residency) under review

2/13/2012 C202601 Forsyth Blythe Development Company D. L Swicegood, PE Replace Bridge No. 368 over I-40 Business on SR 2643 (Salisbury Street) in Kernersville 17+96.35 -L- materials approval request: Ply-Krete 2615 elastomeric concrete, Ply-Primer concrete primer, Ply-Seal, Ply-Bonder seal adhesive Polyset Company (Mechanicville, NY) Stough, Mo (Blythe Development) under review
2/14/2012 2/14/2012 C202621 Nash Barnhill Contracting Company W. S. Joyner, PE Rocky Mount: Bridge No. 285 on SR 1613 (North Winstead Avenue) over Stoney Creek; Bridge No. 179 on SR 1613 (North Winstead Avenue) over US 64 27+87.83 -L-; 55+38.99 -L- overhang falsework for 161-ft, three-span Type III prestress concrete girder widening - bays adjacent to existing deck Intercoastal Contracting, Inc. (Castle Hayne) Lonander, Hans (Intercoastal) under review