spacer spacer   spacer   spacer   spacer  
Title Header spacer
 
HOME
spacer
 
CONTACT
spacer
spacer  
SEARCH!
spacer
spacer
spacer
  NCDOT icon  NC DOT
  NCDOH icon  NC DOH
  NCgov.com icon  NC GOV
spacer
spacer spacer spacer spacer spacer spacer spacer spacer spacer
 
 
spacer
 
Unit Support    |    Staff   |    Policy Memos    |    Project Services    |   
spacer spacer
spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer
  Structure Design Unit's Working Drawing Submittal Status
spacer
spacer spacer  

Working Drawing Submittals-Status of Reviews

In the fall of 2011, the Structure Design Unit and the Bridge Management Unit were merged to form the Structures Management Unit.

Submittals sent to the former State Bridge Management Unit will not be included in this listing until the review responsibilities of both former
units can be fully merged.


The Department’s review status of Contractor submittals, involving structural items received by this Office, is listed on the spreadsheet. The list is arranged in the order that the submittal was received by this Office and incorporates the most recent 50 calendar days.

The first column in the spreadsheet shows the date that the Resident Engineer (RE) received the submittal, if it is known to the Structure Design Unit (SDU). The second column shows the date that this Office received the submittal.

The next to last column in the spreadsheet is labeled “Status”. If the submittal has been received, but review not yet completed, the comment in this column will be “Under Review”. If the review has been completed, there will be a general response under the Status column. “Accepted” means no exceptions were taken. “Accepted as Noted”, or “Accepted as Noted – See Letter” means that there are mark-ups or letter comments, and that a resubmittal is not required. For detailed review comments, please refer to the stamped working drawings and the review letter. “Returned for Correction” is self-explanatory.

The last column is labeled “Letter Sent Date”, which is the date that the review response was sent out from this Office. Submittals that have been reviewed are normally returned or sent to the Residency and to other DOT staff (Materials and Tests Unit, Central Construction Unit, etc.). Structural Steel submittals are also sent directly to the Contractor and fabricator.

This online version of the submittal listing is updated semi-weekly, on Monday and Thursday mornings, usually by 10 AM.

If your submittal does not appear on this listing, check with this Office. For many construction projects, the contact information is shown in the Structure Section of the Contract, as a Project Special Provision entitled “Submittal of Working Drawings”.

Paul D. Lambert, PE                 919-707-6407
James A. Gaither, PE               919-707-6409
James L. Bolden Jr., PE           919-707-6408

NCDOT Structures Management Unit, Working Drawing Review & Approval Section

Submittal Status




spacer spacer
spacer
 
North Carolina DOT Logo   The North Carolina
Department of Transportation