XSECTION
Earthwork
tolerance = 0.01
xs dgn = [TIP]_RDY_XSC_[DESC].DGN
Proposed Finish Grade
soil type = suitable
fill mult factor = 1.00
type = line, line_string
lvname = Prop XS Finish Grade Earthwork
lvname = Prop XS Subgrade Earthwork
Existing Ground Line
soil type = suitable
type = line, line_string
lvname = Exist XS Ground Line
Existing Suitable Material
soil type = Rock
fill mult factor = 1.00
type = line,line_string
lvname = Prop XS Earthwork Geopak Lower Limit Line
Existing Suitable Material
soil type = suitable
fill mult factor = 1.00
type = line,line_string
lvname = Prop XS Earthwork Geopak Top of Rock
Excavation Limits
type = line
lvname = Prop
XS Exc Vertical Line 1
lvname = Prop
XS Exc Vertical Line 2
Write Earthwork Shapes
plot param
lvname = Prop XS Earthwork Shape
Stratify Shape Color
process earthwork
for baseline = L
job number = rdy
beginning station = 212+00.00
ending station = 216+50.00
process earthwork for baseline = L
job number = rdy
beginning station = 259+50.00
ending station = 330+50.00
| Diagram of Rock Excavation | ||
![]() | ||
| Disclaimer: The content on the CADD Tutorial Web Pages are to be use as a general guide in producing a set of NCDOT Roadway plans. It should not be used as the sole reference to seal a set of plans. All other official manuals, such as THE ROADWAY DESIGN MANUAL and AASHTO A POLICY ON GEOMETRIC DESIGN OF HIGHWAYS AND STREETS (The "Green" Book) take precedence. The content contained on the CADD Tutorial web pages has no legal merit. | ||