spacer spacer   spacer   spacer   spacer  
spacer
Title Header spacer
 
HOME
spacer
 
CONTACT
spacer
spacer  
SEARCH!
spacer
spacer
spacer
  NCDOT icon  NC DOT
  NCDOH icon  NC DOH
  NCgov.com icon  NC GOV
spacer
spacer spacer spacer spacer spacer spacer spacer spacer spacer
 
spacer
 
spacer
 
spacer
spacer spacer
spacer
spacer spacer spacer
Roadway Home
spacer
spacer Design Quick Links

spacer
spacer NCDOT Quick Links
spacer
spacer Internal Use Only
spacer
spacer
spacer spacer
spacer
spacer
spacer
  HOME »  INDEX
spacer
spacer spacer  
Roadway - Hydraulics Coordination Procedures
 
DRAINAGE Folder / DRN file

 

A new DRAINAGE folder has been added to the standard TIP structure , with read/write permissions set to include Hydro and Roadway.

When a new TIP folder is created, an empty DRN file will be placed automatically in the DRAINAGE folder.

When drainage design is completed, the DRN file will be replaced by Hydro.

Roadway will not copy the DRN to their folders but will reference the DRN file from the DRAINAGE folder. Revisions to the DRN file by Roadway, will be made in the DRAINAGE folder.

Roadway will include the \DRAINAGE\DRN file when creating the project IPS files.

 
DITCHES
Lateral and Berm Ditches

Lateral drainage ditches and berm ditches (with typical geometry) will be placed by Roadway in the \DRAINAGE\DRN file.

The DDE criteria has been revised to draw ditches into the plan view automatically at the same time cross sections are processed.

Meandering Ditches

Natural stream design (meandering ditches) cross sections will be created by Hydro in a new cross section file (or added to a copy of Roadway's cross sections.) The COGO chain data will be made available to Roadway for merging into the RDY GPK file.

Berm Ditches

Hydro will provide a COGO profile for berm ditches that do not follow natural downhill contours.

When necessary, Roadway will add the back slope stake of berm ditches to the DRN file for setting ROW limits.

Roadway CADD support has developed berm ditch criteria to automate these processes. (See Roadway Web site updates of March 21.)

Head/Tail Ditches Hydro will make sure head and tail ditches are drawn to scale and cut cross sections when necessary.

 
DETAILS
Ditch details will be placed, stationed, and numbered (or lettered) by Hydro, but can be shifted anywhere on the plan sheet by Roadway, or moved to a separate ditch detail sheet by Roadway, which will reside in the DRN file.

Hydro will place all details on a "ditch detail" level as specified in the Leveling chart.

 
QUANTITIES
Hydro will provide text quantities for special rip rapped items and DDE for Head and Tail ditches.

Roadway will provide DDE for lateral ditches.

 
LEVELING
The D&C Alignment DDB will be revised to place alignment control labels on different levels as needed by Hydro for permits.

To include buffer zones (1&2) in the final plans, Correct levels of the DRN file should be turned on within the project IPS files.

CAMA information, Wetland and Stream Impacts, Buffer Impacts, and All permit related legends and such will be put on their respective levels.

Leveling charts on the Roadway Design web site have been revised to reflect these changes.

spacer
spacer
 
North Carolina DOT Logo   The North Carolina
Department of Transportation