Engineering Coordination

Selection Committee Results


If this page is unreadable, your browser does not support tables. Use this alternative page.

Projects Advertised 15 January 1998 
Selection Committee Meeting 11 February 1998

I-2402 B Guilford Selected: DSAtlantic Corporation
I-85 Greensboro Bypass from Northwest of US 421 to Southwest of SR 3314 
  • Site 1 - Dual Bridges on I-85 Bypass over US 421 and US 421 CD 
  • Site 2 - Bridge on I-85 Bypass CD over US 421 and US 421 CD
I-2402 B Guilford Selected: HNTB
I-85 Greensboro Bypass from Northwest of US 421 to Southwest of SR 3314 
  • Site 3 - Bridge on Flyover over I-85 Bypass and I-85 CD 
  • Site 4 - Bridge on Flyover over US 421 and US 421 CD 
  • Site 5 - Bridge on SR 3317 -Y14) over I-85 Bypass and I-85 CD
R-967 CA Stanly Selected: Stewart Engineering 
NC 24-27 from West of SR 1142 (Browns Hill Road) at the West City Limits of Locust to East of Island Creek
R-2206 A Gaston-Lincoln Selected: The LPA Group of NC 
NC 16 from South of Lucia in Gaston County to NC 73 in Lincoln County 
  • Site 1 - Bridge on Ramp CA and Ramp CB over NC 16 -L- 
  • Site 2 - Bridge on SR 1909 -Y1- over NC 16 -L- 
  • Site 6 - Bridge on NC 73 -Y7- over NC 16 -L- 
  • Site 7 - Bridge on NC 73 -Y7- over RR -Y6-
R-2206 A Gaston-Lincoln Selected: Wetherill Associates
NC 16 from South of Lucia in Gaston County to NC 73 in Lincoln County 
  • Site 3 - Bridge on SR 1399 -Y3- over NC 16 -L- 
  • Site 4 - Dual Bridges on NC 16 -L- over CSX RR 
  • Site 5 - Bridge on Existing NC 16 -Y5- over NC 16-L-
Questions about the content of this page? E-Mail Jean Lansford.
Questions about this web site? E-Mail Jim Musselwhite.