spacer spacer   spacer   spacer   spacer  
spacer
Title Header spacer
 
HOME
spacer
 
CONTACT
spacer
spacer  
SEARCH!
spacer
spacer
spacer
  NCDOT icon  NC DOT
  NCDOH icon  NC DOH
  NCgov.com icon  NC GOV
spacer
spacer spacer spacer spacer spacer spacer spacer spacer spacer
 
spacer
 
spacer
 
spacer
spacer spacer
spacer
spacer spacer spacer
Roadway Home
spacer
spacer Design Quick Links

spacer
spacer NCDOT Quick Links
spacer
spacer Internal Use Only
spacer
spacer
spacer spacer
spacer
spacer
spacer
  HOME »  Questions and Answer
spacer
spacer
Roadway Design Question and Answer Forum


Criteria


Question:
I am having difficulties trying to run the L, loop, and gore criteria with one file. Can a sample Criteria file be created to help me?


Answer:
A sample Gore Criteria input file has been created.
Sample Criteria
In this example, a cross section is cut at the gore between -L- and -211LPB- (loop B) at station 168+00.




Processing the Gore Criteria will drawn -L-, gore, and -211LPB- (loop B) in a single process.




Back to Q&A



spacer spacer
spacer
 
North Carolina DOT Logo   The North Carolina
Department of Transportation