spacer spacer   spacer   spacer   spacer  
spacer
Title Header spacer
 
HOME
spacer
 
CONTACT
spacer
spacer  
SEARCH!
spacer
spacer
spacer
  NCDOT icon  NC DOT
  NCDOH icon  NC DOH
  NCgov.com icon  NC GOV
spacer
spacer spacer spacer spacer spacer spacer spacer spacer spacer
 
spacer
 
spacer
 
spacer
spacer spacer
spacer
spacer spacer spacer
Roadway Home
spacer
spacer Design Quick Links

spacer
spacer NCDOT Quick Links
spacer
spacer Internal Use Only
spacer
spacer
spacer spacer
spacer
spacer
spacer
  HOME »  Questions and Answer
spacer
spacer
Roadway Design Question and Answer Forum


Criteria


Question:
Criteria is drawing expressway gutter with a 6:1 back slope rather than a 4:1 as per Std. 846.01 sht. 1 of 3.

Answer:
There are two main problems with the current way Criteria is drawing the expressway gutters.

1. Dimensions and slopes of the expressway gutter are from 1998 Drawing Standards. At that time the nominal gutter back slope was 0.17'/1' (or 6:1) and the gutter back depth was 10".



Since then, beginning with the 2002 to the current 2006 Drawing Standards, the nominal gutter back slope is currently 0.25'/1' (or 4:1) and the gutter back depth is set to 12".


2. Current Criteria fixed the expressway gutter back slope to be always 0.17'/1' (or 6:1). Criteria will have to be modified to be in compliance with 2006 Drawing Standards 486.01 Sheet 2 of 3, Section Views of Expressway Gutter in Super Elevation. The gutter base slope, foreslope, and back slope are variable and exclusively DEPENDENT on the superelevation of the proposed pavement. See diagram below.



The Criteria Library (L:\ Drive) has been updated for these required modifications for expressway gutter standards.