| Prov. No. |   | Custodian | Effective Let Date |
|   |
GENERAL PROVISIONS |
  |
  |
| 33 |
SUBMITTAL OF WORKING DRAWINGS |
STRUCTURES |
2-10-12 |
|   |
BRIDGE FOUNDATION PROVISIONS AND NOTES |
  |
  |
| 1 |
DRILLED PIERS PROVISION (LFD-ASD) |
GEOTECH |
1-17-12 |
| 2 |
PILES PROVISION (LFD-ASD) |
GEOTECH |
1-17-12 |
| 3 |
PILE DRIVING ANALYZER PROVISION (LFD-ASD) |
GEOTECH |
1-17-12 |
| 4 |
PILE EXCAVATION PROVISION (LFD-ASD) |
GEOTECH |
1-17-12 |
|   |
STANDARD FOUNDATION NOTES (LFD-ASD) |
STRUCTURES |
1-17-12 |
|   |
STANDARD FOUNDATION NOTES (LRFD) |
STRUCTURES |
1-17-12 |
|   |
RETAINING WALL PROVISIONS AND NOTES |
  |
  |
| 5 |
ANCHORED RETAINING WALLS PROVISION (LRFD) |
GEOTECH |
5-15-12 |
| - |
STANDARD ANCHORED WALL NOTES (LRFD) |
GEOTECH |
5-15-12 |
| 6 |
CIP GRAVITY RETAINING WALLS PROVISION |
GEOTECH |
1-17-12 |
| 7 |
CONCRETE BARRIER RAIL WITH MOMENT SLAB PROVISION |
GEOTECH |
1-17-12 |
| 8 |
MSE RETAINING WALLS PROVISION (LRFD) |
GEOTECH |
7-17-12 |
| - |
STANDARD MSE WALL NOTES (LRFD) |
GEOTECH |
5-15-12 |
| 9 |
PRECAST GRAVITY RETAINING WALLS PROVISION (LRFD) |
GEOTECH |
1-17-12 |
| - |
STANDARD PRECAST GRAVITY WALL NOTES (LRFD) |
GEOTECH |
1-17-12 |
| 10 |
SEGMENTAL GRAVITY RETAINING WALLS PROVISION (LRFD) |
GEOTECH |
1-17-12 |
| - |
STANDARD SEGMENTAL GRAVITY WALL NOTES (LRFD) |
GEOTECH |
1-17-12 |
| 11 |
SOIL NAIL RETAINING WALLS PROVISION (LFD-ASD) |
GEOTECH |
5-15-12 |
| - |
STANDARD SOIL NAIL WALL NOTES (LFD-ASD) |
GEOTECH |
5-15-12 |
| 12 |
SOLDIER PILE RETAINING WALLS PROVISION (LRFD) |
GEOTECH |
5-15-12 |
| - |
STANDARD SOLDIER PILE WALL NOTES (LRFD) |
GEOTECH |
5-15-12 |
|   |
ROADWAY PROVISIONS |
  |
  |
| SP2 R08 |
SELECT GRANULAR MATERIAL |
CONTRACTS |
1-17-12 |
| SP4 R02 |
BRIDGE APPROACH FILLS |
CONTRACTS |
1-17-12 |
| SP9 R05 |
FOUNDATIONS AND ANCHOR ROD ASSEMBLIES FOR METAL POLES |
CONTRACTS |
1-17-12 |
| SP10 R05 |
SELECT MATERIAL, CLASS III, TYPE 3 |
CONTRACTS |
1-17-12 |
| 13 |
GEOTEXTILE FOR PAVEMENT STABILIZATION |
GEOTECH |
1-17-12 |
| 14 |
REINFORCED SOIL SLOPES |
GEOTECH |
1-17-12 |
| 15 |
ROCK EMBANKMENTS |
GEOTECH |
1-17-12 |
| 18 |
ROCK SLOPE MATERIALS |
GEOTECH |
7-17-12 |
|   |
TEMPORARY SHORING PROVISIONS AND NOTES |
  |
  |
| 16 |
STANDARD SHORING PROVISION |
GEOTECH |
1-17-12 |
| SP11 R02 |
TEMPORARY SHORING PROVISION |
CONTRACTS |
7-17-12 |
| - |
STANDARD TEMPORARY SHORING NOTES |
GEOTECH |
1-17-12 |
| 17 |
TEMPORARY SOIL NAIL WALLS PROVISION |
GEOTECH |
5-15-12 |