PAST PROJECTS - 1998-1999 |
 |
 |
 |
8.1631502, I-2511BB, Rowan County, I-85 from north of SR 2528 in
Rowan County. This contract included chipped tire material in embankment fills.
8.2770801, R-2923C, Yadkin County. New route south of US 421
to SR 1146 (Shacktown Road) . This contract included chipped tires in the embankment fill.
8.1792301, U-2414B, Catawba County. Tate Boulevard extension from SR 1476
(Fairgrove Church Road) to I-40, This contract included chipped tires in the embankment fill.
9.8103406, U-2009A, Cabarrus County. Kannapolis Westside BP from south of SR 1555
east of I-85 to NC 73. This contract included chipped tires in the embankment fill.
8.1623301, U-3829, Forsyth County. US 421 in Winston-Salem. An experimental
usage of a noise wall made from a fiberglass reinforced polymer composite panels filled
with ground recycled tires from North Carolina.
8.1501501, R-0942CB, Orange County. US 15-501 from S of Mt. Carmel Church Road
to Chapel Hill Bypass. A no burn policy has been put into legislation and NCDOT agreed
to use the 15-501 Corridor as a trial for the No Burn Policy. This is the first of four
projects scheduled for US 15-501 that requires the DOT to enforce a no burn policy.
|
 |
|
 |