Intermediate Level
Click Here to download Skill Block 2-R-8 study manual  (This document is large and may take up to two minutes to download with a 28.8 modem) Click Here to download manual cover 
Soil Stabilization
Skill Block 2-R-8, (REU 155)
Objective
This skill block (2-R-8) is designed to familiarize the trainee with mulching and the installation of ditch protection or erosion control blankets, two parts of the seeding operation that are vital to the establishment of a soil stabilizing turf. Our study will involve: (1) the purpose of mulch, ditch liners, and erosion control blankets; (2) the materials and equipment needed to perform the work; and (3) the step-by-step procedures required to install.
There are three (3) phases which must be satisfactorily completed within this classroom course: - Review of written material in this manual
- Satisfactorily complete classroom training
- Certification Exam
|