Contract Materials Discrepancy Report
Removed in Version 8.0
- This report has been removed from the system as all of its information can be displayed/retrieved within the Audit Materials or Project Certification modules.
Version 6.0 Changes
- The report parameter edits were adjusted to require at least one of the MSG criticality values to be selected when the ‘Select Material Type Criticality’ checkbox is checked.
- Click-sort is now available on the material description when using the material selection window to set report parameters.
Version 5.9 Changes
- The filtering criteria has been enhanced to include Line Item, Discrepancy (e.g., Positives, Negatives, All), Discrepancy Type (e.g., Accepted-Paid, Received-Paid, All etc.).
- The report criteria window has also been enhanced to include sorting and grouping options by Material and Contract Line Item.
Version 5.7 Changes
-
This report has been enhanced to provide the ability to filter contract material information based on Criticality.
-
A correction has been made to the calculations this report to display
the correct values for the Material Total Bid Quantity - this value
will now reflect the amount displayed on the original Line Item. Any
existing erroneous values have been corrected.
UPDATED for Version 5.3
Renamed in Version 5.2
Page last updated 26 August 2009