Contract Level of Service Report
Version 8.2 Changes
- Added a checkbox to the report filters to allow the report to be run with the Level of Service grading percentages that became effective on July 1, 2011. The previous percentages remain available for comparison.
Version 8.1 Changes
- Added the ability to filter data based on the letter prefix with which the Contract Number begins. This allows the exclusion of the D or Division Let contracts from the Level of Service calculations performed for the NCDOT Metrics.
Version 7.1.2 Changes
- Renamed the “Begin Date” and “End Date” parameter labels to be “Final Estimate Paid Begin Date” and “Final Estimate Paid End Date”, respectively.
- In the LOS Description section, the labels for the “ … contract completion date*” have been modified to read “… contract Target Completion Date*” for each level.
- In the definition section at the bottom of the report page, the text “*Completion Date = …” has been modified to read “*Target Completion Date = …”.
NEW for Version 7.1.1
- This report provides the ability to determine the Completion Level of Service Metric. The report output can be filtered by the Final Estimate Paid Date, Division, Resident Engineer, and Contract Type. For additional information about this report, please contact Lamar Sylvester at the Construction Unit.
HiCAMS Release Notes Index
Page last updated 6 October 2011