spacer spacer   spacer   spacer   spacer   spacer  
TPB spacer  
HOME
spacer  
CONTACT
spacer
spacer  
SEARCH!
spacer
spacer
spacer   NCDOT icon  NCDOT
  NC Smartlink icon  NCSMARTLINK
  NCgov.com icon  NCGOV
spacer spacer spacer spacer spacer spacer spacer spacer spacer
TRANSPORTATION PLANNING   |    MPO/RPO   |    TECHNICAL SERVICES   |    TRAFFIC SURVEY  
spacer
open spacer spacer
spacer Hot Links spacer
spacer
spacer spacer spacer
About Us
spacer
TPB Job Opportunities
spacer
Strategic Highway
Corridors

spacer
Traffic Survey Maps
spacer
Functional Classification Maps
spacer
Preconstruction
spacer
Links
spacer
Statewide Transportation Plan
spacer
spacer
Integration Project

 
spacer spacer
spacer
spacer
spacer
  HOME >  INTEGRATION PROJECT>  PROBLEM STATEMENT
spacer
spacer spacer

 
Problem Statement

Problem Statement (PS) to Purpose and Need (PN) is the first Integration implementation linkage to be completed.  PS Guidance was endorsed by the Interagency Leadership Team on January 13, 2010.  The goal of the PS is to develop a product in the Comprehensive Transportation Plan (CTP) process that can be used as the starting point for NEPA/SEPA. The intent is that this problem statement would:

  • form a substantial core of the NEPA/SEPA required purpose and need statement, and

  • save time in preparing and/or agreeing to the purpose and need in project development.

The purpose of creating problem statements is to communicate the context, concept and justification for proposed projects included in the CTP.  The format provides two sections, titled ‘Identified Problem’ and ‘CTP Project Proposal’.  

The ‘Identified Problem’ section is intended to provide a clear and concise description of the problem.  This section does not contain a description of the project or any discussion that would limit possible alternatives for consideration.

The ‘CTP Project Proposal’ is intended to provide supporting information about the recommendation on the CTP.  It contains data that has been identified as “good to know” information when making decisions about the PN for a project.  It is not intended to provide information for decisions related to alternatives analysis (this will be included in an Alternatives and Scenario Analysis section of the CTP report which has not yet been defined).

Problem Statement / Purpose and Need Class Handouts (note: All handouts have the same material)

 

 

  spacer
spacer
 
 
NCDOT Logo   The North Carolina
Department of Transportation
 
 
 
spacer