DIVISION 8

INCIDENTALS

This is the Table of Contents for a Microsoft Word document which can be viewed by clicking here: div08e.doc. Click on the section number to see a preview in HTML format. The home page for this document is found here.

SECTION 800 -- MOBILIZATION
800-1.....DESCRIPTION.
800-2.....COMPENSATION.
SECTION 801 -- CONSTRUCTION STAKES, LINES AND GRADES
801-1.....DESCRIPTION
801-2.....CONSTRUCTION METHODS
801-3.....COMPENSATION
SECTION 802 -- DISPOSAL OF WASTE AND DEBRIS
802-1.....DESCRIPTION.
802-2.....GENERAL REQUIREMENTS.
.....a......Drainage:
.....b......Slopes:
.....c......Construction Debris:
.....d......Erosion Control:
802-3.....COMPENSATION.
SECTION 806 -- RIGHT OF WAY MARKERS
806-1.....DESCRIPTION.
806-2.....MATERIALS.
806-3.....CONSTRUCTION METHODS.
806-4.....METHOD OF MEASUREMENT.
806-5.....BASIS OF PAYMENT.
SECTION 808 -- OBLITERATION OF EXISTING ROAD
808-1.....DESCRIPTION.
808-2.....CONSTRUCTION METHODS.
808-3.....COMPENSATION.
SECTION 810 -- PIPE REMOVAL
810-1.....DESCRIPTION.
810-2.....CONSTRUCTION METHODS.
810-3.....METHOD OF MEASUREMENT.
810-4.....BASIS OF PAYMENT.
SECTION 815 -- SUBSURFACE DRAINAGE
815-1.....DESCRIPTION.
815-2.....MATERIALS.
815-3.....CONSTRUCTION METHODS.
815-4.....METHOD OF MEASUREMENT.
(A).....Excavation:
(B).....Subdrain Fine Aggregate:
(C).....Pipe:
(D).....Wyes, Tees, and Elbows:
(E).....Concrete Pads:
815-5.....BASIS OF PAYMENT
(A).....Excavation:
(B).....Subdrain Fine Aggregate:
(C).....Pipe:
(D).....Wyes, Tees, and Elbows:
(E).....Concrete Pads:
(F).....Compensation:
(G).....Pay Items:
SECTION 816 -- SHOULDER DRAINS
816-1.....DESCRIPTION.
816-2.....MATERIALS
816-3.....CONSTRUCTION METHODS.
816-4.....METHOD OF MEASUREMENT.
(A).....Shoulder Drain:
(B).....Pipe:
(C).....Concrete Pads:
816-5.....BASIS OF PAYMENT.
(A).....Shoulder Drain:
(B).....Pipe:
(C).....Concrete Pads:
(D).....Compensation:
(E).....Pay Items:
SECTION 818 -- BLOTTING SAND
818-1.....DESCRIPTION.
818-2.....MATERIALS.
818-3.....CONSTRUCTION METHODS.
818-4.....METHOD OF MEASUREMENT.
818-5.....BASIS OF PAYMENT.
SECTION 820 -- FUNNELS AND FUNNEL DRAINS
820-1.....DESCRIPTION.
820-2.....MATERIALS.
820-3.....CONSTRUCTION METHODS.
820-4.....METHOD OF MEASUREMENT.
820-5.....BASIS OF PAYMENT.
SECTION 825 -- INCIDENTAL CONCRETE CONSTRUCTION - GENERAL
825-1.....DESCRIPTION.
825-2.....FORMS.
(A).....General:
(B).....Wood Forms:
(C).....Metal Forms:
825-3.....REINFORCEMENT.
825-4.....PLACING CONCRETE.
825-5.....SLUMP TESTS.
825-6.....FINISHING
(A).....General:
(B).....Ordinary Surface Finish:
(C).....Sidewalk Finish:
(D).....Rubbed Finish:
(E).....Float Finish:
825-7.....REMOVING FORMS.
825-8.....PROTECTION FROM COLD WEATHER.
825-9.....CURING.
825-10.....JOINTS.
(A).....General:
(B).....Grooved Contraction Joints:
(C).....Expansion Joints:
(D).....Construction Joints:
(E).....Sawing Joints:
(F).....Sealing Joints:
825-11.....COMPENSATION.
SECTION 830 -- BRICK MASONRY CONSTRUCTION - GENERAL
830-1.....DESCRIPTION.
830-2.....CONCRETE CONSTRUCTION.
830-3.....MORTAR.
830-4.....LAYING BRICK.
830-5.....PROTECTION FROM COLD WEATHER.
830-6.....COMPENSATION.
SECTION 832 -- REINFORCED BRICK MASONRY CONSTRUCTION - GENERAL
832-1.....DESCRIPTION.
832-2.....CONCRETE CONSTRUCTION.
832-3.....MORTAR.
832-4.....LAYING BRICK.
832-5.....PROTECTION FROM COLD WEATHER.
832-6.....COMPENSATION.
SECTION 834 -- REINFORCED BLOCK MASONRY CONSTRUCTION - GENERAL
834-1.....DESCRIPTION.
834-2.....CONCRETE CONSTRUCTION.
834-3.....MORTAR.
834-4.....LAYING CONCRETE BLOCK.
834-5.....PROTECTION FROM COLD WEATHER.
834-6.....COMPENSATION.
SECTION 838 -- ENDWALLS
838-1.....DESCRIPTION.
838-2.....MATERIALS.
838-3.....CONSTRUCTION METHODS.
(A).....Foundation:
(B).....Concrete and Masonry:
(C).....Backfill:
838-4.....METHOD OF MEASUREMENT.
(A).....Concrete:
(B).....Brick Masonry:
(C).....Reinforcing Steel:
838-5.....BASIS OF PAYMENT.
(A).....Concrete:
(B).....Brick Masonry:
(C).....Reinforcing Steel:
(D).....Foundation Conditioning:
(E).....Compensation:
(F).....Pay Items:
SECTION 840 -- MINOR DRAINAGE STRUCTURES
840-1.....DESCRIPTION.
840-2.....MATERIALS.
840-3.....CONSTRUCTION METHODS.
(A).....Foundation:
(B).....Cast-In-Place Concrete, Brick, and Block Masonry:
(C).....Installation of Precast Units:
(D).....Fittings and Connections:
(E).....Backfill: 
(F).....Pipe Collars and Pipe Plugs:
(G).....Concrete Aprons:
840-4.....METHOD OF MEASUREMENT.
(A).....Masonry Drainage Structures:
.....(1).....Per Each Basis:
.....(2).....Volume Basis:
(B).....Pipe Collars and Pipe Plugs:
(C).....Frame Assemblies with Grates or Covers:
(D).....Concrete Aprons:
840-5.....BASIS OF PAYMENT.
(A).....Masonry Drainage Structures:
.....(1).....Per Each Basis:
.....(2).....Volume Basis:
(B).....Pipe Collars and Pipe Plugs:
(C).....Foundation Conditioning:
(D).....Frame Assemblies with Grates and Covers:
(E).....Concrete Aprons:
(F).....Compensation:
(G).....Pay Items:
SECTION 842 -- GRAVITY RETAINING WALLS
842-1.....DESCRIPTION.
842-2.....MATERIALS.
842-3.....CONSTRUCTION REQUIREMENTS.
842-4.....METHOD OF MEASUREMENT.
842-5.....BASIS OF PAYMENT.
SECTION 844 -- STEPS
844-1.....DESCRIPTION.
844-2.....MATERIALS.
844-3.....CONSTRUCTION REQUIREMENTS.
844-4.....METHOD OF MEASUREMENT.
844-5.....BASIS OF PAYMENT.
SECTION 846 -- CONCRETE CURB, CURB AND GUTTER, GUTTER, SHOULDER BERM GUTTER AND CONCRETE FLUMES
846-1.....DESCRIPTION.
846-2.....MATERIALS.
846-3.....CONSTRUCTION REQUIREMENTS.
(A).....General:
(B).....Forms:
(C).....Finishing:
(D).....Joints:
(E).....Surface Tolerances:
(F).....Backfilling:
(G).....Opening to Traffic:
846-4.....METHOD OF MEASUREMENT.
846-5.....BASIS OF PAYMENT.
SECTION 848 -- CONCRETE SIDEWALKS, DRIVEWAYS AND WHEELCHAIR RAMPS
848-1.....DESCRIPTION.
848-2.....MATERIALS.
848-3.....CONSTRUCTION REQUIREMENTS.
848-4.....METHOD OF MEASUREMENT.
848-5.....BASIS OF PAYMENT.
SECTION 850 -- CONCRETE PAVED DITCH
850-1.....DESCRIPTION.
850-2.....MATERIALS.
850-3.....CONSTRUCTION REQUIREMENT.
850-4.....METHOD OF MEASUREMENT.
850-5.....BASIS OF PAYMENT.
SECTION 852 -- TRAFFIC ISLANDS AND MEDIANS
852-1.....DESCRIPTION.
852-2.....MATERIALS.
852-3.....CONSTRUCTION REQUIREMENTS.
852-4.....METHOD OF MEASUREMENT.
852-5.....BASIS OF PAYMENT.
SECTION 853 -- CONCRETE GLARE SCREEN
853-1.....DESCRIPTION.
853-2.....MATERIALS.
853-3.....CONSTRUCTION REQUIREMENTS.
853-4.....METHOD OF MEASUREMENT.
853-5.....BASIS OF PAYMENT.
SECTION 854 -- CONCRETE BARRIER
854-1.....DESCRIPTION.
854-2.....MATERIALS.
854-3.....CONSTRUCTION REQUIREMENTS.
(A).....Cast in Place or Slip Formed:
(B).....Precast:
854-4.....METHOD OF MEASUREMENT.
854-5.....BASIS OF PAYMENT.
SECTION 857 -- PRECAST REINFORCED CONCRETE BARRIER SINGLE FACED
857-1.....DESCRIPTION.
857-2.....MATERIALS.
857-3.....CONSTRUCTION METHODS.
857-4.....METHOD OF MEASUREMENT.
857-5.....BASIS OF PAYMENT
SECTION 858 -- ADJUSTMENT OF CATCH BASINS, MANHOLES, DROP INLETS, METER BOXES, AND VALVE BOXES
858-1.....DESCRIPTION.
858-2.....MATERIALS.
858-3.....CONSTRUCTION REQUIREMENTS.
858-4.....METHOD OF MEASUREMENT.
858-5.....BASIS OF PAYMENT.
SECTION 859 -- CONVERTING EXISTING CATCH BASINS AND DROP INLETS
859-1.....DESCRIPTION.
859-2.....MATERIALS.
859-3.....CONSTRUCTION METHODS.
859-4.....METHOD OF MEASUREMENT.
859-5.....BASIS OF PAYMENT.
SECTION 862 -- GUARDRAIL
862-1.....DESCRIPTION.
862-2.....MATERIALS.
862-3.....CONSTRUCTION METHODS.
862-4.....TEMPORARY GUARDRAIL.
862-5.....METHOD OF MEASUREMENT.
(A).....Guardrail:
(B).....Terminal Sections:
(C).....Anchor Units:
(D).....Transition Section:
(E).....Additional Guardrail Posts:
862-6.....BASIS OF PAYMENT.
(A).....Guardrail:
(B).....Terminal Sections:
(C).....Anchor Units:
(D).....Transition Sections:
(E).....Additional Guardrail Posts:
(F).....Compensation:
(G).....Pay Items:
SECTION 863 -- REMOVE EXISTING GUARDRAIL
863-1.....GENERAL.
863-2.....CONSTRUCTION METHODS.
863-3.....METHOD OF MEASUREMENT.
863-4.....BASIS OF PAYMENT
SECTION 866 -- FENCE
866-1.....DESCRIPTION.
866-2.....MATERIALS.
866-3.....CONSTRUCTION METHODS.
(A).....Clearing and Grubbing:
(B).....Setting Posts and Braces
(C).....Installing Fabric and Wire:
.....(1).....Chain Link Fence:
.....(2).....Woven Wire Fence:
866-4.....METHOD OF MEASUREMENT.
(A).....Fence:
(B).....Posts:
(C).....Additional Barbed Wire:
(D).....Gates:
866-5.....BASIS OF PAYMENT.
(A).....Fence:
(B).....Posts:
(C).....Additional Barbed Wire:
(D).....Gates:
(E).....Compensation:
(F).....Pay Items:
SECTION 867 -- FENCE RESET
867-1.....DESCRIPTION.
867-2.....CONSTRUCTION METHODS.
867-3.....METHOD OF MEASUREMENT.
867-4.....BASIS OF PAYMENT.
SECTION 868 -- RIP RAP
868-1.....DESCRIPTION.
868-2.....MATERIALS.
868-3.....CONCRETE RIP RAP.
868-4.....PLAIN RIP RAP.
868-5.....METHOD OF MEASUREMENT.
(A).....Square Yard:
(B).....Ton:
(C).....Filter Fabric:
868-6.....BASIS OF PAYMENT.
(A).....Concrete Rip Rap:
(B).....Plain Rip Rap:
(C).....Filter Fabric:
(D).....Compensation:
(E).....Basis of Payment: