| SECTION 700 -- GENERAL REQUIREMENTS FOR PORTLAND CEMENT CONCRETE PAVING | ||||
| 700-1.....DESCRIPTION. | ||||
| 700-2.....CONCRETE PRODUCTION EQUIPMENT. | ||||
| 700-3.....CONCRETE HAULING EQUIPMENT. | ||||
| 700-4.....PREPARATION OF SUBGRADE AND AGGREGATE BASE. | ||||
| 700-5.....PLACING CONCRETE. | ||||
| (A).....General: | ||||
| (B).....Slip Form Paver Method: | ||||
| (C).....Fixed Form Method: | ||||
| 700-6.....SPREADING AND VIBRATING CONCRETE: | ||||
| 700-7.....FINISHING. | ||||
| 700-8.....PROTECTION FROM COLD WEATHER AND RAIN. | ||||
| 700-9.....CURING. | ||||
| (A).....General: | ||||
| (B).....Membrane Curing Compound: | ||||
| (C).....Polyethylene Film: | ||||
| (D).....Burlap: | ||||
| 700-10.....REMOVING FORMS. | ||||
| 700-11.....JOINT CONSTRUCTION. | ||||
| (A).....General: | ||||
| (B).....Transverse Contraction Joints: | ||||
| (C).....Longitudinal Contraction Joints: | ||||
| (D).....Transverse Construction Joints: | ||||
| .....(1).....General: | ||||
| .....(2).....Planned Transverse Construction Joints: | ||||
| .....(3).....Emergency Transverse Construction Joints: | ||||
| (E).....Longitudinal Construction Joints: | ||||
| (F).....Transverse Expansion Joints: | ||||
| 700-12.....SEALING JOINTS. | ||||
| (A).....General: | ||||
| (B).....Age of Pavement: | ||||
| (C).....Temperature: | ||||
| (D).....Sealing the Joint: | ||||
| (E).....Cleaning Pavement: | ||||
| 700-13.....USE OF NEW PAVEMENT OR SHOULDER. | ||||
| 700-14.....CONTRACTOR'S RESPONSIBILITY FOR PROCESS CONTROL. | ||||
| 700-15.....ACCEPTANCE TESTS FOR CONCRETE. | ||||
| (A).....Responsibility: | ||||
| (B).....Lot Definition: | ||||
| .....(1).....Definition of Lot: | ||||
| .....(2).....Exception For Partial Lot: | ||||
| (C).....Air Content: | ||||
| (D).....Slump: | ||||
| (E).....Flexural Strength: | ||||
| .....(1).....Outlier Check: | ||||
| .....(2).....Average Flexural Strength: | ||||
| (F).....Thickness: | ||||
| (G).....Surface Smoothness: | ||||
| SECTION 710 -- CONCRETE PAVEMENT | ||||
| 710-1.....DESCRIPTION. | ||||
| 710-2.....MATERIALS. | ||||
| 710-3.....COMPOSITION OF CONCRETE. | ||||
| 710-4.....ACCEPTANCE OF CONCRETE. | ||||
| 710-5.....CONSTRUCTION METHODS. | ||||
| 710-6.....FINISHING. | ||||
| 710-7.....FINAL SURFACE TESTING. | ||||
| 710-8.....PAVEMENT MARKING. | ||||
| 710-9.....THICKNESS TOLERANCES. | ||||
| 710-10.....METHOD OF MEASUREMENT. | ||||
| 710-11.....BASIS OF PAYMENT. | ||||
| (A).....General: | ||||
| (B).....Pavement Deficient In Thickness: | ||||
| (C).....Concrete Pavement Varying In Flexural Strength: | ||||
| (D).....Multiple Adjustments in Price: | ||||
| (E).....Compensation: | ||||
| (F).....Pay Items: | ||||
| SECTION 720 -- CONCRETE SHOULDERS | ||||
| 720-1.....DESCRIPTION. | ||||
| 720-2.....MATERIALS. | ||||
| 720-3.....COMPOSITION OF CONCRETE. | ||||
| 720-4.....ACCEPTANCE OF CONCRETE. | ||||
| 720-5.....EQUIPMENT. | ||||
| 720-6.....CONSTRUCTION METHODS. | ||||
| 720-7.....FINISHING. | ||||
| 720-8.....JOINTS. | ||||
| 720-9.....THICKNESS TOLERANCES. | ||||
| 720-10.....METHOD OF MEASUREMENT. | ||||
| 720-11.....BASIS OF PAYMENT. | ||||
| (A).....General: | ||||
| (B).....Shoulder Deficient in Thickness: | ||||
| (C).....Concrete Shoulder Varying In Flexural Strength: | ||||
| (D).....Multiple Adjustments in Price: | ||||
| (E).....Compensation: | ||||
| (F).....Pay Items: | ||||
| SECTION 725 -- FIELD LABORATORY FOR PORTLAND CEMENT CONCRETE PAVEMENT | ||||
| 725-1.....DESCRIPTION | ||||
| 725-2.....GENERAL REQUIREMENTS. | ||||
| 725-3.....COMPENSATION. | ||||