DIVISION 7

CONCRETE PAVEMENTS AND SHOULDERS

This is the Table of Contents for a Microsoft Word document which can be viewed by clicking here: div07e.doc. Click on the section number to see a preview in HTML format. The home page for this document is found here.

SECTION 700 -- GENERAL REQUIREMENTS FOR PORTLAND CEMENT CONCRETE PAVING
700-1.....DESCRIPTION.
700-2.....CONCRETE PRODUCTION EQUIPMENT.
700-3.....CONCRETE HAULING EQUIPMENT.
700-4.....PREPARATION OF SUBGRADE AND AGGREGATE BASE.
700-5.....PLACING CONCRETE.
(A).....General:
(B).....Slip Form Paver Method:
(C).....Fixed Form Method:
700-6.....SPREADING AND VIBRATING CONCRETE:
700-7.....FINISHING.
700-8.....PROTECTION FROM COLD WEATHER AND RAIN.
700-9.....CURING.
(A).....General:
(B).....Membrane Curing Compound:
(C).....Polyethylene Film:
(D).....Burlap:
700-10.....REMOVING FORMS.
700-11.....JOINT CONSTRUCTION.
(A).....General:
(B).....Transverse Contraction Joints:
(C).....Longitudinal Contraction Joints:
(D).....Transverse Construction Joints:
.....(1).....General:
.....(2).....Planned Transverse Construction Joints:
.....(3).....Emergency Transverse Construction Joints:
(E).....Longitudinal Construction Joints:
(F).....Transverse Expansion Joints:
700-12.....SEALING JOINTS.
(A).....General:
(B).....Age of Pavement:
(C).....Temperature:
(D).....Sealing the Joint:
(E).....Cleaning Pavement:
700-13.....USE OF NEW PAVEMENT OR SHOULDER.
700-14.....CONTRACTOR'S RESPONSIBILITY FOR PROCESS CONTROL.
700-15.....ACCEPTANCE TESTS FOR CONCRETE.
(A).....Responsibility:
(B).....Lot Definition:
.....(1).....Definition of Lot:
.....(2).....Exception For Partial Lot:
(C).....Air Content:
(D).....Slump:
(E).....Flexural Strength:
.....(1).....Outlier Check:
.....(2).....Average Flexural Strength:
(F).....Thickness:
(G).....Surface Smoothness:
SECTION 710 -- CONCRETE PAVEMENT
710-1.....DESCRIPTION.
710-2.....MATERIALS.
710-3.....COMPOSITION OF CONCRETE.
710-4.....ACCEPTANCE OF CONCRETE.
710-5.....CONSTRUCTION METHODS.
710-6.....FINISHING.
710-7.....FINAL SURFACE TESTING.
710-8.....PAVEMENT MARKING.
710-9.....THICKNESS TOLERANCES.
710-10.....METHOD OF MEASUREMENT.
710-11.....BASIS OF PAYMENT.
(A).....General:
(B).....Pavement Deficient In Thickness:
(C).....Concrete Pavement Varying In Flexural Strength:
(D).....Multiple Adjustments in Price:
(E).....Compensation:
(F).....Pay Items:
SECTION 720 -- CONCRETE SHOULDERS
720-1.....DESCRIPTION.
720-2.....MATERIALS.
720-3.....COMPOSITION OF CONCRETE.
720-4.....ACCEPTANCE OF CONCRETE.
720-5.....EQUIPMENT.
720-6.....CONSTRUCTION METHODS.
720-7.....FINISHING.
720-8.....JOINTS.
720-9.....THICKNESS TOLERANCES.
720-10.....METHOD OF MEASUREMENT.
720-11.....BASIS OF PAYMENT.
(A).....General:
(B).....Shoulder Deficient in Thickness:
(C).....Concrete Shoulder Varying In Flexural Strength:
(D).....Multiple Adjustments in Price:
(E).....Compensation:
(F).....Pay Items:
SECTION 725 -- FIELD LABORATORY FOR PORTLAND CEMENT CONCRETE PAVEMENT
725-1.....DESCRIPTION
725-2.....GENERAL REQUIREMENTS.
725-3.....COMPENSATION.