DIVISION 2

EARTHWORK

This is the Table of Contents for a Microsoft Word document which can be viewed by clicking here: div02e.doc. Click on the section number to see a preview in HTML format. The home page for this document is found here.

SECTION 200 -- CLEARING AND GRUBBING
200-1.....DESCRIPTION.
200-2.....MATERIALS.
200-3.....CLEARING.
200-4.....GRUBBING.
200-5.....DISPOSITION OF TIMBER, STUMPS, AND DEBRIS.
200-6.....METHOD OF MEASUREMENT.
(A).....General:
(B).....Clearing and Grubbing Along Project:
(C).....Clearing and Grubbing of Borrow and Material Sources:
200-7.....BASIS OF PAYMENT.
(A).....General:
(B).....Clearing and Grubbing Along Project:
(C).....Clearing and Grubbing of Borrow and Material Sources:
(D).....Pay Items:
SECTION 205 -- SEALING ABANDONED WELLS
205-1.....DESCRIPTION.
205-2.....CONSTRUCTION METHODS.
205-3.....METHOD OF MEASUREMENT.
205-4.....BASIS OF PAYMENT.
SECTION 210 -- DEMOLITION OF BUILDINGS AND APPURTENANCES
210-1.....DESCRIPTION.
210-2.....GENERAL REQUIREMENTS.
210-3.....UTILITIES.
210-4.....DISPOSAL.
210-5.....COMPENSATION.
SECTION 215 -- REMOVAL OF EXISTING BUILDINGS
215-1.....DESCRIPTION
215-2.....GENERAL REQUIREMENTS.
215-3.....UTILITIES.
215-4.....DISPOSAL.
215-5.....COMPENSATION.
SECTION 220 -- RELOCATION OF EXISTING BUILDINGS
220-1.....DESCRIPTION.
220-2.....INSPECTION.
220-3.....GENERAL REQUIREMENTS.
220-4.....FOUNDATION AND PAVEMENT.
220-5.....UTILITIES.
220-6.....COMPENSATION.
SECTION 225 -- ROADWAY EXCAVATION
225-1.....DESCRIPTION.
(A).....General:
(B).....Unclassified Excavation:
(C).....Undercut Excavation:
225-2.....EROSION CONTROL REQUIREMENTS.
225-3.....UNCLASSIFIED EXCAVATION.
225-4.....UNDERCUT EXCAVATION.
225-5.....TOLERANCES.
225-6.....MAINTENANCE.
225-7.....METHOD OF MEASUREMENT.
225-8.....BASIS OF PAYMENT.
SECTION 226 -- COMPREHENSIVE GRADING
226-1.....DESCRIPTION.
226-2.....CONSTRUCTION METHODS.
226-3.....METHOD OF MEASUREMENT.
226-4.....BASIS OF PAYMENT
SECTION 228 -- PRE-SPLITTING OF ROCK
228-1.....DESCRIPTION.
228-2.....CONSTRUCTION REQUIREMENTS.
228-3.....METHOD OF MEASUREMENT.
228-4.....BASIS OF PAYMENT.
SECTION 230 -- BORROW EXCAVATION.
230-1.....DESCRIPTION.
230-2.....COORDINATION WITH SEEDING OPERATIONS.
230-3.....MATERIALS.
230-4.....CONSTRUCTION METHODS.
(A).....General:
(B).....Department Furnished Sources:
(C).....Contractor Furnished Sources:
(D).....Maintenance:
230-5.....METHOD OF MEASUREMENT.
(A).....General
(B).....In Place Measurement:
(C).....Truck Measurement:
230-6.....BASIS OF PAYMENT.
SECTION 235 -- EMBANKMENTS
235-1.....DESCRIPTION.
235-2.....COORDINATION WITH SEEDING OPERATIONS.
235-3.....MATERIALS.
235-4.....CONSTRUCTION METHODS.
(A).....Preparation for Embankment:
(B).....Embankment Formation:
(C).....Embankment Compaction:
(D).....Maintenance
235-5.....TOLERANCES.
235-6.....COMPENSATION.
SECTION 240 -- DITCH EXCAVATION
240-1.....DESCRIPTION.
(A).....General:
(B).....Drainage Ditches:
(C).....Berm Ditches:
240-2.....GENERAL
240-3.....DISPOSAL OF MATERIALS.
240-4.....METHOD OF MEASUREMENT.
(A).....Drainage Ditch Excavation:
(B).....Berm Ditch Construction:
240-5.....BASIS OF PAYMENT
(A).....Drainage Ditch Excavation:
(B).....Berm Ditch Construction:
(C).....Compensation:
(D).....Pay Items:
SECTION 250 -- REMOVAL OF EXISTING PAVEMENT
250-1.....DESCRIPTION.
250-2.....PAVEMENT REMOVAL AND DISPOSAL.
250-3.....METHOD OF MEASUREMENT.
250-4.....BASIS OF PAYMENT.
SECTION 260 -- PROOF ROLLING
260-1.....DESCRIPTION.
260-2.....EQUIPMENT.
260-3.....CONSTRUCTION METHODS.
260-4.....METHOD OF MEASUREMENT.
260-5.....BASIS OF PAYMENT.