| SECTION 200 -- CLEARING AND GRUBBING | ||||||
| 200-1.....DESCRIPTION. | ||||||
| 200-2.....MATERIALS. | ||||||
| 200-3.....CLEARING. | ||||||
| 200-4.....GRUBBING. | ||||||
| 200-5.....DISPOSITION OF TIMBER, STUMPS, AND DEBRIS. | ||||||
| 200-6.....METHOD OF MEASUREMENT. | ||||||
| (A).....General: | ||||||
| (B).....Clearing and Grubbing Along Project: | ||||||
| (C).....Clearing and Grubbing of Borrow and Material Sources: | ||||||
| 200-7.....BASIS OF PAYMENT. | ||||||
| (A).....General: | ||||||
| (B).....Clearing and Grubbing Along Project: | ||||||
| (C).....Clearing and Grubbing of Borrow and Material Sources: | ||||||
| (D).....Pay Items: | ||||||
| SECTION 205 -- SEALING ABANDONED WELLS | ||||||
| 205-1.....DESCRIPTION. | ||||||
| 205-2.....CONSTRUCTION METHODS. | ||||||
| 205-3.....METHOD OF MEASUREMENT. | ||||||
| 205-4.....BASIS OF PAYMENT. | ||||||
| SECTION 210 -- DEMOLITION OF BUILDINGS AND APPURTENANCES | ||||||
| 210-1.....DESCRIPTION. | ||||||
| 210-2.....GENERAL REQUIREMENTS. | ||||||
| 210-3.....UTILITIES. | ||||||
| 210-4.....DISPOSAL. | ||||||
| 210-5.....COMPENSATION. | ||||||
| SECTION 215 -- REMOVAL OF EXISTING BUILDINGS | ||||||
| 215-1.....DESCRIPTION | ||||||
| 215-2.....GENERAL REQUIREMENTS. | ||||||
| 215-3.....UTILITIES. | ||||||
| 215-4.....DISPOSAL. | ||||||
| 215-5.....COMPENSATION. | ||||||
| SECTION 220 -- RELOCATION OF EXISTING BUILDINGS | ||||||
| 220-1.....DESCRIPTION. | ||||||
| 220-2.....INSPECTION. | ||||||
| 220-3.....GENERAL REQUIREMENTS. | ||||||
| 220-4.....FOUNDATION AND PAVEMENT. | ||||||
| 220-5.....UTILITIES. | ||||||
| 220-6.....COMPENSATION. | ||||||
| SECTION 225 -- ROADWAY EXCAVATION | ||||||
| 225-1.....DESCRIPTION. | ||||||
| (A).....General: | ||||||
| (B).....Unclassified Excavation: | ||||||
| (C).....Undercut Excavation: | ||||||
| 225-2.....EROSION CONTROL REQUIREMENTS. | ||||||
| 225-3.....UNCLASSIFIED EXCAVATION. | ||||||
| 225-4.....UNDERCUT EXCAVATION. | ||||||
| 225-5.....TOLERANCES. | ||||||
| 225-6.....MAINTENANCE. | ||||||
| 225-7.....METHOD OF MEASUREMENT. | ||||||
| 225-8.....BASIS OF PAYMENT. | ||||||
| SECTION 226 -- COMPREHENSIVE GRADING | ||||||
| 226-1.....DESCRIPTION. | ||||||
| 226-2.....CONSTRUCTION METHODS. | ||||||
| 226-3.....METHOD OF MEASUREMENT. | ||||||
| 226-4.....BASIS OF PAYMENT | ||||||
| SECTION 228 -- PRE-SPLITTING OF ROCK | ||||||
| 228-1.....DESCRIPTION. | ||||||
| 228-2.....CONSTRUCTION REQUIREMENTS. | ||||||
| 228-3.....METHOD OF MEASUREMENT. | ||||||
| 228-4.....BASIS OF PAYMENT. | ||||||
| SECTION 230 -- BORROW EXCAVATION. | ||||||
| 230-1.....DESCRIPTION. | ||||||
| 230-2.....COORDINATION WITH SEEDING OPERATIONS. | ||||||
| 230-3.....MATERIALS. | ||||||
| 230-4.....CONSTRUCTION METHODS. | ||||||
| (A).....General: | ||||||
| (B).....Department Furnished Sources: | ||||||
| (C).....Contractor Furnished Sources: | ||||||
| (D).....Maintenance: | ||||||
| 230-5.....METHOD OF MEASUREMENT. | ||||||
| (A).....General | ||||||
| (B).....In Place Measurement: | ||||||
| (C).....Truck Measurement: | ||||||
| 230-6.....BASIS OF PAYMENT. | ||||||
| SECTION 235 -- EMBANKMENTS | ||||||
| 235-1.....DESCRIPTION. | ||||||
| 235-2.....COORDINATION WITH SEEDING OPERATIONS. | ||||||
| 235-3.....MATERIALS. | ||||||
| 235-4.....CONSTRUCTION METHODS. | ||||||
| (A).....Preparation for Embankment: | ||||||
| (B).....Embankment Formation: | ||||||
| (C).....Embankment Compaction: | ||||||
| (D).....Maintenance | ||||||
| 235-5.....TOLERANCES. | ||||||
| 235-6.....COMPENSATION. | ||||||
| SECTION 240 -- DITCH EXCAVATION | ||||||
| 240-1.....DESCRIPTION. | ||||||
| (A).....General: | ||||||
| (B).....Drainage Ditches: | ||||||
| (C).....Berm Ditches: | ||||||
| 240-2.....GENERAL | ||||||
| 240-3.....DISPOSAL OF MATERIALS. | ||||||
| 240-4.....METHOD OF MEASUREMENT. | ||||||
| (A).....Drainage Ditch Excavation: | ||||||
| (B).....Berm Ditch Construction: | ||||||
| 240-5.....BASIS OF PAYMENT | ||||||
| (A).....Drainage Ditch Excavation: | ||||||
| (B).....Berm Ditch Construction: | ||||||
| (C).....Compensation: | ||||||
| (D).....Pay Items: | ||||||
| SECTION 250 -- REMOVAL OF EXISTING PAVEMENT | ||||||
| 250-1.....DESCRIPTION. | ||||||
| 250-2.....PAVEMENT REMOVAL AND DISPOSAL. | ||||||
| 250-3.....METHOD OF MEASUREMENT. | ||||||
| 250-4.....BASIS OF PAYMENT. | ||||||
| SECTION 260 -- PROOF ROLLING | ||||||
| 260-1.....DESCRIPTION. | ||||||
| 260-2.....EQUIPMENT. | ||||||
| 260-3.....CONSTRUCTION METHODS. | ||||||
| 260-4.....METHOD OF MEASUREMENT. | ||||||
| 260-5.....BASIS OF PAYMENT. | ||||||