STANDARD MSE WALL NOTES ON PLANS 5-15-12 (Choices are in parentheses separated by "or".) FOR MECHANICALLY STABILIZED EARTH (MSE) RETAINING WALLS, SEE MECHANICALLY STABILIZED EARTH RETAINING WALLS PROVISION. FOR STEEL BEAM GUARDRAIL, SEE ROADWAY PLANS AND SECTION 862 OF THE STANDARD SPECIFICATIONS. FOR SINGLE FACED PRECAST CONCRETE BARRIER, SEE ROADWAY PLANS AND SECTION 857 OF THE STANDARD SPECIFICATIONS. A CONCRETE BARRIER RAIL WITH MOMENT SLAB IS REQUIRED ABOVE RETAINING WALL NO. ____. SEE PLANS FOR CONCRETE BARRIER RAIL WITH MOMENT SLAB DETAILS. A FENCE OR HANDRAIL IS REQUIRED ON TOP OF RETAINING WALL NO. ____. SEE ROADWAY PLANS FOR FENCE OR HANDRAIL ATTACHMENT DETAILS. USE AN MSE WALL SYSTEM WITH PRECAST CONCRETE PANELS THAT MEET SECTION 1077 OF THE STANDARD SPECIFICATIONS FOR RETAINING WALL NO. ____. USE AN MSE WALL SYSTEM WITH SRW UNITS THAT MEET ARTICLE 1040-4 OF THE STANDARD SPECIFICATIONS FOR RETAINING WALL NO. ____. WHEN USING AN MSE WALL SYSTEM WITH SEGMENTAL RETAINING WALL (SRW) UNITS FOR RETAINING WALL NO. ____, FREEZE-THAW DURABLE SRW UNITS THAT MEET ARTICLE 1040-4 OF THE STANDARD SPECIFICATIONS ARE REQUIRED. CAST-IN-PLACE REINFORCED CONCRETE COPING IS REQUIRED FOR RETAINING WALL NO. ____. A ____________ ARCHITECTURAL FINISH IS REQUIRED FOR PRECAST CONCRETE PANELS FOR RETAINING WALL NO. ____. USE SRW UNITS WITH A ____________ FACE FOR RETAINING WALL NO. ____. USE SRW UNITS WITH A ____________ COLOR FOR RETAINING WALL NO. ____. A DRAIN (IS or IS NOT) REQUIRED FOR RETAINING WALL NO. ____. BEFORE BEGINNING MSE WALL DESIGN FOR RETAINING WALL NO. ____, SURVEY WALL LOCATION AND SUBMIT A REVISED WALL PROFILE VIEW (WALL ENVELOPE) FOR REVIEW. DO NOT START WALL DESIGN OR CONSTRUCTION UNTIL THE REVISED WALL ENVELOPE IS ACCEPTED. DESIGN RETAINING WALL NO. ____ FOR THE FOLLOWING: 1) H = DESIGN HEIGHT + EMBEDMENT 2) DESIGN LIFE = (75 or 100) YEARS 3) MAXIMUM FACTORED VERTICAL STRESS ON FOUNDATION MATERIAL = ____ LB/SF 4) MINIMUM REINFORCEMENT LENGTH (L) = ____ FT 5) MINIMUM EMBEDMENT ELEVATION = ____ FT 6) AGGREGATE PARAMETERS: AGGREGATE TYPE* UNIT WEIGHT FRICTION ANGLE COHESION (gamma) (phi) (C) LB/CF DEGREES LB/SF COARSE 110 38 0 FINE 125 34 0 *SEE MSE RETAINING WALLS PROVISION FOR COARSE AND FINE AGGREGATE MATERIAL REQUIREMENTS. 7) IN-SITU ASSUMED MATERIAL PARAMETERS: MATERIAL TYPE UNIT WEIGHT FRICTION ANGLE COHESION (gamma) (phi) (C) LB/CF DEGREES LB/SF BACKFILL ___ __ ___ FOUNDATION ___ __ ___ THE MINIMUM EMBEDMENT ELEVATION FOR RETAINING WALL NO. ____ INCLUDES EMBEDMENT FOR SCOUR. DESIGN RETAINING WALL NO. ____ FOR A LIVE LOAD (TRAFFIC) SURCHARGE. DESIGN RETAINING WALL NO. ____ FOR THE (POINT, LINE or STRIP) SURCHARGE LOAD SHOWN. DESIGN RETAINING WALL NO. ____ FOR A PIPE EXTENDING THROUGH THE WALL AS SHOWN. VERIFY PIPE LOCATION AND ELEVATION BEFORE BEGINNING MSE WALL DESIGN OR CONSTRUCTION. DESIGN REINFORCEMENT CONNECTED TO END BENT CAPS FOR FACTORED LOAD AND LENGTH OF REINFORCEMENT IN ACTIVE ZONE (La) SHOWN. CAST REINFORCEMENT CONNECTORS INTO CAP BACKWALL FOR END BENT NO. ____ LOCATED AT STATION ____________. MAINTAIN A CLEARANCE OF AT LEAST 3" BETWEEN CONNECTORS AND REINFORCING STEEL IN CAP. FOUNDATIONS FOR (SIGNS, LIGHTING or SIGNALS) WILL BE LOCATED BEHIND RETAINING WALL NO. ____ AND (WILL or MAY) INTERFERE WITH REINFORCEMENT. BEFORE BEGINNING MSE WALL CONSTRUCTION, SUBMIT PROPOSED CONSTRUCTION METHODS FOR THESE FOUNDATIONS FOR APPROVAL. EXISTING OR FUTURE OBSTRUCTIONS SUCH AS FOUNDATIONS, GUARDRAIL, FENCE OR HANDRAIL POSTS, PAVEMENTS, PIPES, INLETS OR UTILITIES (WILL or MAY) INTERFERE WITH REINFORCEMENT FOR RETAINING WALL NO. ____. FOUNDATIONS FOR END BENT NO. ____ LOCATED AT STATION ____________ (WILL or MAY) INTERFERE WITH REINFORCEMENT FOR RETAINING WALL NO. ____. SEE "FOUNDATION LAYOUT" SHEET FOR FOUNDATION LOCATIONS. CONSTRUCT RETAINING WALL NO. ____ BEFORE INSTALLING FOUNDATIONS FOR END BENT NO. ____ LOCATED AT STATION ____________. DO NOT PLACE LEVELING PAD CONCRETE, AGGREGATE OR REINFORCEMENT FOR RETAINING WALL NO. ____ UNTIL EXACAVATION DIMENSIONS AND FOUNDATION MATERIAL ARE APPROVED. "TEMPORARY SHORING" (IS or MAY BE) REQUIRED FOR RETAINING WALL NO. ____ IN ACCORDANCE WITH THE TEMPORARY SHORING PROVISION. SEE (ROADWAY, STRUCTURE or TRAFFIC CONTROL) PLANS. AT THE CONTRACTOR'S OPTION, "TEMPORARY SHORING FOR WALL CONSTRUCTION" MAY BE USED TO CONSTRUCT RETAINING WALL NO. ____. SEE MSE RETAINING WALLS PROVISION FOR TEMPORARY SHORING FOR WALL CONSTRUCTION.